All Projects

Project
Office
Budget
Progress
Action
Default Image

Roadway Excavation & Structural Works on Nawalpur-Palapu-Koshahaat (Koshabhanjyang)-Kakani-Bilandu Road, Okhaldhunga

डिभिजन सडक कार्यालय, हर्कपुर, ओखलढुङगा

Rs. 11,24,67,598

0.00%

Default Image

Mustang- Kagbeni-Dolpa Sadak, Mustang

Road Division, Baglung

Rs. 1,20,88,747

20.00%

Default Image

Upgrading of Existing Earthen road to Blacktop Standard along Mahendra Rajmarga Hariharpur Mahendranagar Chandrapur Harsar prastoki Thera Bazar Road,Dhanusha.

सडक डिभिजन, कपिलवस्तु

Rs. 10,98,64,769

16.00%

Default Image

Road Improvement Works of TRP, Naubise-Sopryang Section, NH41, Dhading

मध्यपच्चिमाञ्चल क्षेत्रिय सडक निर्देशनालय,सुर्खेत

Rs. 2,50,83,951

18.00%

Default Image

Periodic Maintenance Works on Manthali-Khurkot Road Section of Tamakoshi-Milti-Manthali-Khurkot Road (Ch. 40+410 to 55+000), Ramechhap

योजना तथा अनुगमन महाशाखा (भूवातावरण तथा सामाजिक शाखा)

Rs. 2,53,74,982

20.00%

Default Image

Construction of Blacktop Road Works on Baseni Bazzar-LamaTole-Padampur-Shaktikhor sadak,Chitwan

डिभिजन सडक कार्यालय, चितवन

Rs. 1,23,50,050

0.00%

Default Image

Perodic Maintenance Works on Surkhet-Dailekh Road (Ch.0+000 to 11+000,16+000 to 22+000, 25+000-32+000 & 45+000 to 64+000)

सडक डिभिजन, सुर्खेत

Rs. 3,97,26,191

15.75%

Default Image

Supplying ,Fabricating and Installation of ISMC Steel Channel with GI Railing and RCC Jersey Barrier Works along Koteshwor to Dhobighat of Kathmandu

काठमाडौं चक्रपथ सुधार योजना, ललितपुर

Rs. 3,07,07,464

0.00%

Default Image

Structural and Bituminous Works on Tinau river bridge and Jhumsa khola bridge Road,Siddhababa Bypass,palpa

सडक डिभिजन, पाल्पा

Rs. 42,13,374

30.00%

Default Image

Periodic Maintenance Works ( Resealing/ surface dressing work) on Chheda-Jajarkot Road Section, (Ch 69+500 to 84+500)

डिभिजन सडक कार्यालय, चौरजहारी

Rs. 1,65,63,305

30.00%

Default Image

Construction of Blacktop Road in Ratamata Madi River Lamjung

Puspalal (Midhill) Road Project, Gorkha

Rs. 13,53,26,287

0.00%

Default Image

Periodic Repair of Road Surface in Bagthala Chainpur Section of Khodpe Bajhang Road (F49)

सडक डिभिजन, बैतडी

Rs. 6,74,11,372

0.00%

Default Image

Blacktopped Road Construction Works Including Drainage Structures along Laxmaniya-Sohaljahada 4 Rajbanshitole hudai - Kadmaha hudai -Nocha sima sadak Morang

डिभिजन सडक कार्यालय, मोरङ

Rs. 31,89,119

16.00%

Default Image

Pavement Works Including Cross drainage and Retaining Structures along Sundarharaincha Na Pa 2 Karaibana Chouk Haraincha Bazar Chandani Chowk Mailechowk Sabhapur Sangali inaar bayrban Bazar kaushal Chowk Hasandaha Hudai Bakraha Khola Road, Morang

डिभिजन सडक कार्यालय, मोरङ

Rs. 10,64,49,339

15.79%

Default Image

Construction Of Blacktopped Road Works along Bhotepul-Gaighat Sadak, Urlabari, Morang

मध्यमाञ्चल क्षेत्रिय सडक निर्देशनालय, काठमाण्डौ

Rs. 71,89,786

15.00%

Default Image

Construction of Blacktopped Road at Kohabara-Gwaldubba-Mahabhara Road (Ch 8+205-9+947 Km)

डिभिजन सडक कार्यालय, झापा

Rs. 1,07,37,622

0.00%

Default Image

Construction of Bagmati Bridge(Badharwa) over existing foundation as well as substructure

पुर्वाञ्चल क्षेत्रिय सडक निर्देशनालय, झापा

Rs. 57,40,77,501

17.00%

Default Image

PSC Bridge Over Thambu Khola Dhading

डिभिजन सडक कार्यालय, चितवन

Rs. 6,64,36,483

0.00%

Default Image

Improvement of Gulara-Pratappur Road, Kailali

सडक डिभिजन, कञ्चनपुर

Rs. 20,38,905

100.00%

Default Image

Upgrading works on Panchapuri-Na.Pa.ward No.3,Khambagade-Babiyachaur-Majhigaun-Biddyapur-Gutukhola Road(Ch:0+000 to 10+000),Surkhet District

ओखलढुङगा सल्लेरी सडक योजना, सोलुखुम्वु

Rs. 16,68,81,470

14.03%

Default Image

Construction of Blacktop Works on Baruwa Bazar Bairabpur Parsa Chowk Baidar Chirauli Ajingare Sahidpark Gangate, Madi-2, Chitwan

डिभिजन सडक कार्यालय, चितवन

Rs. 17,51,27,665

14.00%

Default Image

Upgrading of road to Black top-304+521~306+981,309+521~313+981,320+721~323+801-CAB/Gwallek JV

दार्चुला टिङकर सडक योजना, दार्चुला

Rs. 37,77,35,164

15.15%

Default Image

Roadside Slope Disaster Management of Kharkhare Landslide at Besisahar Chame Road ( Ch 3+150)

डुम्रे बेसीशहर चामे सडक योजना, बेसीशहर लमजुङ

Rs. 14,49,90,420

16.00%

Default Image

Mitra Builders Pvt. Ltd.

धनगढी-खुटिया-दिपायल-चैनपुर-उरैभन्ज्याङ्ग सडक योजना, बि.पी‍. नगर, डाेटी

Rs. 2,62,97,382

25.00%

Default Image

(Rehabilitation Works of Thulokhola-Ranipauwa section Of Pasanglahamu Rajmarga(Package-1).)

यान्त्रिक कार्यालय, चितवन

Rs. 1,15,39,100

15.00%

Default Image

Supplying, Fabricating and Installation of ISMC Steel Channel with GI Railing & Rcc Jersey Barrier works Dhobighat to Kalanki of Kathmandu Ringroa

काठमाडौं चक्रपथ सुधार योजना, ललितपुर

Rs. 3,09,47,700

0.00%

Default Image

Road Construction(Gravelling) Works on Gadhimai-Kawahigoth (Suwarna Ga.Pa. 7 Santganj Jamuni Solakpur Kawahi) Road, Bara

डिभिजन सडक कार्यालय, मकवानपुर

Rs. 3,96,33,650

0.00%

Default Image

Extension of SRN Bridges: Sikhre Khola,Sugure Khola and Sandh Khola(Malekhu) Slab culvert along TRP and PRM,Dhading

डिभिजन सडक कार्यालय, चितवन

Rs. 1,30,47,783

0.00%

Default Image

Rehabilitation Works of Post Monsoon Damaged Section on Surkhet Dahikhola Section of Karnali Highway(Ch:115+000 to 132+000)

हेभिईक्युपमेन्ट डिभिजन, वुटवल

Rs. 1,11,11,547

14.78%

Default Image

Construction of Blacktop Road Works on Bharatpur Mahanagar Ring Road

डिभिजन सडक कार्यालय, चितवन

Rs. 1,23,69,462

0.00%

Default Image

Construction of Blacktopped Road at Kohavara Gwaaldubba Mahavara Sadak (Ch 5+090-6+425 Km)

डिभिजन सडक कार्यालय, झापा

Rs. 1,07,38,566

0.00%

Default Image

Widening of Sangha-Dhulikhel Section (Asphalt Concrete works) of Suryabinayak Dhulikhel Road Chainage 7+500-15+800)

योजना तथा अनुगमन महाशाखा (योजना अनुगमन तथा मुल्यांकन शाखा)

Rs. 3,58,98,01,635

15.51%

Default Image

Pavements Works along Inaruwa 3 Sakhuwagachi Hudai Thapki Pokhari Daknithan Hudai Rajmarg Jodne Bato, Sunsari

डिभिजन सडक कार्यालय, मोरङ

Rs. 31,56,324

14.00%

Default Image

Roadway cutting & structural works on Mangalsen-Suwakhand-Khetgaire-Julumare-Dhakari Road Section

डिभिजन सडक कार्यालय, साँफेवगर, अछाम

Rs. 15,04,79,884

15.00%

Default Image

(Rehabilitation Works of Thulokhola-Ranipauwa section Of Pasanglahamu Rajmarga(Package-2).)

यान्त्रिक कार्यालय, भक्तपुर

Rs. 1,18,60,340

15.00%

Default Image

Basang Gaupalika ward No 2 -Naurikot-Gurusanbo Cave Road

Road Division, Baglung

Rs. 1,17,56,295

15.00%

Default Image

Road Upgrading Works on Surkhet- Dailekh Bazar-Mahabulekh-Galje-Bhattadi-Ratada-Nagma-Gamgadhi-Nakchelagna Road(Ch:17+500-25+700))

सडक डिभिजन, सुर्खेत

Rs. 2,25,29,471

14.73%

Default Image

Roadway Excavation and Structural Works in Jayaprithivi Na.Pa. Word No. 1 Motorli Kailas Hudai Garkhali Thap Road Bajhang.

सडक डिभिजन, बैतडी

Rs. 19,96,133

0.00%

Default Image

Road Maintenance in Khodpe-Bitthad Section of Khodpe Chainpur Highway (NH64)

सडक डिभिजन, बैतडी

Rs. 96,88,198

0.00%

Default Image

"W" Metal Beam Crash Barrier Construction Works along Simbhanjyang Hetauda Section of TRP, Makwanpur

डिभिजन सडक कार्यालय, मकवानपुर

Rs. 1,40,61,250

0.00%