All Projects
Project |
Office |
Budget |
Progress |
Action |
---|---|---|---|---|
Manang-Mustang-Dolpa-Jumla Sadak, Mustang. |
Road Division, Baglung |
Rs. 2,54,64,941 |
20.00% |
|
Pavement work Including Cross Drainage and Retaining Structures along Inaruwa 3 Sakhuwagachi Hudai Thapki Pokhari Daknithan Hudai Rajmarg Jodne Bato, Sunsari |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 1,59,20,303 |
17.00% |
|
Road Improvement and Structural Works along Pacharauta Na Pa Shrinagar Bairiya Hanuman Chowk Piparpati chowk Pakadiya gaun Benoli chowk Ramnagar chowk Kotbali Gandak Canal Road, Bara |
सडक डिभिजन, दाङ्ग |
Rs. 14,28,45,795 |
25.00% |
|
Recurrent Maintenance Works (Patchworks) on Siddhicharan Rajmarg (Chainage 0+000 to 46+000) and Hilepani - Jayaramghat Road |
डिभिजन सडक कार्यालय, हर्कपुर, ओखलढुङगा |
Rs. 33,83,236 |
20.00% |
|
Improvement of Bani-Dangajai-Parsiya-Nandgaun-Kanja-Binbari-Nauranga Road (Ch-1+240 to 2+590 from Nauranga) |
सडक डिभिजन, कञ्चनपुर |
Rs. 80,75,875 |
70.00% |
|
M/s Sobarna-GSHC JV, Kapan-14, Kathmandu |
Unknown |
Rs. 28,67,48,269 |
8.00% |
|
Roadway excavation and Structural works at Jhumsa and Dobhan of Siddhartha highway. |
सडक डिभिजन, पाल्पा |
Rs. 89,71,236 |
0.00% |
|
Improvement of Masuriya-Hasuliya Road, Kailali (2+500 To 3+500 From Surminala Bridge Hulaki Sadak) |
सडक डिभिजन, कञ्चनपुर |
Rs. 89,74,032 |
25.00% |
|
Road Improvement Works at Bara Boarder dekhi Sisautiya hudai Sukumariya Mai Sadak, Sarlahi |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 3,30,80,309 |
20.00% |
|
Construction of RCC drain, Box Culvert & Plum Concrete wall along Sitalpur-Malangwa-Kharaiyatole Postal Highway (Ch 0+000 to 40+000), Sarlahi |
डिभिजन सडक कार्यालय, धनकुटा |
Rs. 54,20,05,010 |
18.00% |
|
Road Upgrading works at Jirikhimti-Morahang-Pauthak Bazaar Road, Tehrathum |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 17,71,75,130 |
18.00% |
|
Construction of Blacktopped Road at Kohavara Gwaaldubba Mahavara Sadak (Ch 5+090-6+425 Km) |
डिभिजन सडक कार्यालय, झापा |
Rs. 1,07,45,321 |
0.00% |
|
D & B of kaligandaki River Bridge Andhighat - Bardale Road Syangja |
पुल योजना पश्चिम क्षेत्र सेक्टर नंः ४, पाल्पा |
Rs. 25,13,30,350 |
24.00% |
|
Upgrading of Chhaldi-Thadaunga Arkhwang-Haandi-Neta-Ismarjsthal-Hulaka-Barbot-Dwaneta-Malagiri Road (Ch. 0+000 to 5+650), Gulmi |
पुर्वाञ्चल क्षेत्रिय सडक निर्देशनालय, झापा |
Rs. 21,54,58,641 |
30.00% |
|
MIDHLPD/337011144/076/77 |
Puspalal (Midhill) Road Project, Dailekh |
Rs. 4,86,82,066 |
18.00% |
|
Upgrading of Existing Earthen road to blacktop standard along Jaleshwor Bardibash Sadak Timkiya Gohanna Majara Singayahi Pariya Bhagwanpur Sanokhara Parsa Jaleshwor Janakpur Road, Mahottari |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 11,25,21,487 |
3.00% |
|
Construction of Blacktop works on Pakaudi BishalChowk Prachanda Marga Road,Chitwan |
डिभिजन सडक कार्यालय, चितवन |
Rs. 1,09,05,986 |
0.00% |
|
Specific maintenance works (Footpath maintenance) at Different Chainage road of Lalitpur District |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 61,55,980 |
15.00% |
|
Widening/ Upgrading of Rani Biratnagar Itahari Dharan Road (Tarhara – Seuti Khola, Ch: 34+720 to 40+100) to Four Lane. |
व्यापारिक मार्ग विस्तार आयोजना (रानी-बिराटनगर-इटहरी-धरान मार्ग), सुनसरी |
Rs. 45,55,53,580 |
41.00% |
|
Upgrading/Improvement of Road by Construction of Road Structure, Rigid Pavement, DBSD, Traffic Safety Works and Bio-engineering Works from Ch: 18+000 to Ch: 40 + 000 along Saljhandhi Sandhikharka Dhorpatan Road NH-52 |
Unknown |
Rs. 1,09,62,12,005 |
21.00% |
|
Road Upgrading Works at Pakhribas-Phalate-Bhojpur Sadarmukam Sadak, Dhankuta |
डिभिजन सडक कार्यालय, धनकुटा |
Rs. 19,29,31,094 |
18.00% |
|
Specific Maintenance Works on Surkhet-Ranimatta -Dailekh Road |
सडक डिभिजन, सुर्खेत |
Rs. 31,22,603 |
16.77% |
|
Construction of motorable bridge |
Puspalal (Midhill) Road Project, Panchthar |
Rs. 3,41,28,151 |
0.00% |
|
Road Upgrading Work of Sunkhani Sangwa Road |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 76,22,732 |
0.00% |
|
Road work on Milanchowk Mukha Dhune Dayaar Road |
डिभिजन सडक कार्यालय, धनकुटा |
Rs. 29,13,993 |
16.74% |
|
Traffic Maintenance Works at Sabhakhola- Khandbari Section (Km 38+000 to Km 50+000) |
डिभिजन सडक कार्यालय, तुम्लीङटार, संखुवासभा |
Rs. 13,65,000 |
0.00% |
|
Upgrading of Gandhi Manmohan Marga ( Pathari Bazzar-Sanischare-Gandhiashram-Rangeli-India Border Road), Morang (Ch 15+000-29+797) |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, सुनसरी |
Rs. 71,30,63,004 |
17.00% |
|
Construction of Blacktopped Road at Kohavara Gwaaldubba Mahavara Sadak (Ch 3+570-5+090 Km) |
डिभिजन सडक कार्यालय, झापा |
Rs. 1,07,25,313 |
0.00% |
|
Widening and Overlay works (Periodic Maintenance) on Aaptari- Devghat Road |
डिभिजन सडक कार्यालय, चितवन |
Rs. 66,55,445 |
0.00% |
|
Corridor - Dhurpur-Kholete to Talkuna Sadak,Baglung |
Road Division, Baglung |
Rs. 39,53,540 |
20.00% |
|
म.रा.मा. अयोध्यानगर दहिपौडी दरिया नेपाल भारत सिमा, सिराहा |
डिभिजन सडक कार्यालय, सिराहा |
Rs. 6,48,38,850 |
0.00% |
|
Construction/Upgrading of Road to blacktop Standard along Pipaltar-Deudi Road(Ch.10+000- 20+872 km), Nuwakot |
Puspalal (Midhill) Road Project, Gorkha |
Rs. 64,26,51,161 |
16.47% |
|
Road Improvement Works along Rautahat Chandrapur ward no.8 Santpur Sindhureghari Malintole Chetnagar Samm Pakki Sadak (Ch 0+000 to 20+000), Rautahat (total length of working section : 7:55KM) |
पुर्वाञ्चल क्षेत्रिय सडक निर्देशनालय, झापा |
Rs. 11,67,12,104 |
18.00% |
|
Construction of Prestressed RCC Bridge over Madi River along Hansapur-5 Timurechour- Simle Pakha - Gilung Road Kaski |
सडक डिभिजन, पोखरा |
Rs. 6,12,53,363 |
0.00% |
|
Road Improvement works on Khosretar Khalte Dhading Besisahar Road, Dhading |
डिभिजन सडक कार्यालय, नुवाकोट |
Rs. 1,37,69,301 |
0.00% |
|
Vairabsthan-Kamichautara-Satipokhara-Dhakalthok-Sammachaur Karidor Sadak,Baglung |
Road Division, Baglung |
Rs. 1,04,94,683 |
20.00% |
|
Road Improvement Works at Bramhapuri Chok Padariya Sadak, Sarlahi |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 17,63,422 |
0.00% |
|
Road Upgrading Works, Double Bituminous Surface Dressing works on Pokhara - Pwang - Sisne - Dolpa Road Section (Ch 0+000 to 10+000) |
सडक डिभिजन, कञ्चनपुर |
Rs. 21,18,56,320 |
30.00% |
|
Widening & Upgrading of Puspalal (Midhill) Highway along Chiyobhanjyang-Ganesh Chok Section (Ch. 33+000-50+647) |
सांफेवगर मंगलसेन मार्तडी सडक योजना, अछाम |
Rs. 41,52,37,149 |
16.00% |
|
Construction of Prestressed RCC Girder Bridge with Well Foundation over Jhanjh River at Gaur Pipara Road Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 4,89,52,073 |
0.00% |