All Projects
Project |
Office |
Budget |
Progress |
Action |
---|---|---|---|---|
UPGRADING OF KHARI CHANDANPUR MANGALPUR CHOWK DEKHI UTTAR MANAU PASHUPATINAGAR GOLA OKHARIYA BANDH SADAK |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, वाके |
Rs. 47,01,43,343 |
16.00% |
|
Periodic Maintenance Works ( Asphalt concrete ) on Palung Tistung Section of TRP, Makwanpur |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 2,35,17,040 |
0.00% |
|
Specific Maintenance (Drain Construction and Maintenance) Works on Chure-Pathlaiya section (East Side) of TRP |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 83,54,445 |
0.00% |
|
Construction of RCC Road and Drain work along Mithileshwor mauwahi ward no 1 ko highway ko Pratikshalay dekhi purano Bazar hudai purandaha samma sadak |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 1,01,34,755 |
0.00% |
|
Upgrading/ Improvement of Ch- 69+480 Km to 94+975 Km, Darbot- Ghartigaun Section of Shahidmarga Road, Rolpa to Blacktopped Standard |
Unknown |
Rs. 72,73,39,170 |
16.00% |
|
Periodic maintenance along Balkhu-Bagdol Road (Pacakage 2) |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 62,51,562 |
0.00% |
|
Road Improvement Works of Maldhunga- Beni Section (Ch0+000 to 13+100) |
Unknown |
Rs. 46,78,15,293 |
31.00% |
|
Roadway Excavation, Construction of Drain and Structure,Hume Pipe Culverts upto Blacktop standard along Chisapani -Dhakaha-Chakmake-Bahun Tilping -Nawalpurghat-Palapu(59+000 to 69+000) |
डिभिजन सडक कार्यालय, खुर्कोट |
Rs. 6,82,64,088 |
14.20% |
|
Construction of Road Works on Milan Chowk Nilkantha Shivalaya Rainataal road Chitwan |
डिभिजन सडक कार्यालय, चितवन |
Rs. 16,49,043 |
0.00% |
|
Recurrent maintenance works Along Hetauda Lothar section of MRM |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 24,92,206 |
0.00% |
|
Road Improvement works on Keladighat-Janabikas maavi of Bhimad-Rampur-Mityal-Arunkhola Road, Palpa. |
सडक डिभिजन, पाल्पा |
Rs. 1,09,08,384 |
30.00% |
|
Road Improvement Works at Gadhimai Kawabhighot Sadak,Bara |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 1,09,52,132 |
0.00% |
|
Maintenance works on 11kilo Chhepetar Bhaluswara Road 0+000-4+000 to 17+000-22+000) |
गाेरखा सडक योजना, गोरखा |
Rs. 1,80,10,085 |
20.00% |
|
Reactive Maintenance of Road Surface in Khodpe-Bajhang Road(NH64) |
सडक डिभिजन, बैतडी |
Rs. 46,22,975 |
0.00% |
|
Road Works at Manthali-Natila-Fulasi-Tokarpur Road, Ramechhap |
डिभिजन सडक कार्यालय, खुर्कोट |
Rs. 15,63,60,616 |
17.00% |
|
M/s GMR Construction Nepal Pvt. Ltd, Chitwan |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 3,34,13,404 |
2.00% |
|
Kaali Gandaki Pul Ridi Bajaar |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 17,95,75,814 |
0.00% |
|
Construction of Motorable RCC Bridge 3*25m simply supported span, cast insitu, 2 webbed reinforced concrete slab deck bridge over Sawa Khola river btween Damarkhu and Badakadiyale |
डिभिजन सडक कार्यालय, सिराहा |
Rs. 6,03,23,447 |
15.00% |
|
Baglung-Maldhunga-Balewa-Kusmisera Sadak(Bareng-Gulmi-Shantipir) Sadak,Baglung |
Road Division, Baglung |
Rs. 57,38,215 |
15.00% |
|
Road Improvement (Surface Dressing) Works along Amlekhganj-Pathlaiya Section of TRP, Bara |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 1,62,00,107 |
0.00% |
|
Construction of Butwal upamahanagarpalika ward no 16, Kedali chok dekhi Suddhodan Gaupalika ward no 2,5 hudai ward no 6 kothiya buddhasarkit sadak, Rupandehi and Kedali chok-Suddhodan 2,5,6 Kothihiya Buddhacircuit. |
सडक डिभिजन, तनहुं |
Rs. 3,35,19,117 |
13.49% |
|
Construction of Jaymunighat-Mareghat Bridge above Kaligandki Bridge |
Road Division, Baglung |
Rs. 11,61,49,879 |
15.00% |
|
Pavement and structural works for Rehabilitation of works on Siddhicharan Rajmarg (Mude-Phaplu road section), Solukhumbu |
योजना तथा अनुगमन महाशाखा (सडक सुरक्षा तथा ट्राफिक शाखा) |
Rs. 4,07,74,459 |
15.00% |
|
श्री बि.वाइ.एन कन्स्ट्रक्सन |
सडक डिभिजन, तनहुं |
Rs. 66,49,893 |
13.44% |
|
Construction of Prestressed Bridge over Rinte Khola, Balde Bajura |
योजना तथा अनुगमन महाशाखा (भूवातावरण तथा सामाजिक शाखा) |
Rs. 10,92,05,758 |
15.00% |
|
Periodic Maintenance of Thaiba Sanogaun Road |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 70,25,423 |
13.38% |
|
Upgradation/Improvement of Km 0+000 to Km 46+671, Sector of Lamahi-Ghorahi-Tulsipur Road |
भालुवाङ्ग-बाग्दुला-भिमगिठ्ठे चन्द्रौटा-कृष्णनगर, लमही-घोराही-तुलसीपुर सडक योजना, दाङ |
Rs. 1,26,91,76,837 |
17.27% |
|
Bateshawar Bazar -Sitapur Chowk- Kartik Kunwar- Niraspur -Lavkush Lakshminiwas MA. Vi. -Wadakaryalaya sadak , Dhanusha. RDJKR/337011694/077-78/43 |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 87,78,771 |
0.00% |
|
Recurrent Maintenance works at Daikhola to Khulalu (Ch 132+000 to 136+000) on Karnali Highway Kalikot |
पुर्वाञ्चल क्षेत्रिय सडक निर्देशनालय, झापा |
Rs. 62,17,980 |
13.14% |
|
Reactive Maintenance Works on Aabukhaireni-Gorkha Road (NH 44), Gorkha |
सडक डिभिजन, तनहुं |
Rs. 28,90,035 |
15.00% |
|
Periodic Maintenance works at Mid Hill Highway NH 03 (Seti Highway) CH 18+000 to 32+000 |
सडक डिभिजन, भक्तपुर |
Rs. 4,09,51,294 |
20.00% |
|
Road Works at Milti Khola-Kirnetar-Khimti Khola-Manthali-Khurkot Road Section NH-28 (Package-1) |
डिभिजन सडक कार्यालय, खुर्कोट |
Rs. 1,13,11,078 |
15.00% |
|
Construction of Three Span 20m simply Supported span cast-in-situ,4 webbed Reinforced Concrete slab Deck of Ladari Khola Bridge Connecting Khairahani Na.Pa.2and 3 Chitwan |
ओखलढुङगा सल्लेरी सडक योजना, सोलुखुम्वु |
Rs. 8,90,74,173 |
15.00% |
|
Malika -Sanidev- J.B. J.V. |
धनगढी-खुटिया-दिपायल-चैनपुर-उरैभन्ज्याङ्ग सडक योजना, बि.पी. नगर, डाेटी |
Rs. 3,38,71,954 |
30.00% |
|
Design and Build of Triyuga River Bridge, Hadiya Gabisa haal Chaudandi NaPa 10 antargat Hadiya-Dewdhar Road, Udaypur, Udaypur |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 35,17,60,000 |
20.00% |
|
Construction of RCC Bridge over Pathraiya River on Pratappur Vdc 09 hasanpur kailali |
सडक डिभिजन, कञ्चनपुर |
Rs. 6,53,32,004 |
25.00% |
|
Road Improvement Works on Damki Phalante Road, Nuwakot |
डिभिजन सडक कार्यालय, नुवाकोट |
Rs. 72,45,814 |
0.00% |
|
Construction works on Bharatpur ma. na. pa. ward no.6 and 13 simana -Sitamai mandir |
डिभिजन सडक कार्यालय, चितवन |
Rs. 1,27,93,482 |
15.00% |
|
Construction of Jallad Khola Multicell Box Culvert along Kadamchowk-Kamla Road |
डिभिजन सडक कार्यालय, सिराहा |
Rs. 5,30,27,622 |
24.90% |
|
Landslide Protection and River training Works on Midhill Highway NH- 03 (Seti Highway Ch 12+250,Raduwa) |
सडक डिभिजन, कपिलवस्तु |
Rs. 4,72,37,696 |
15.00% |