All Projects
Project |
Office |
Budget |
Progress |
Action |
|---|---|---|---|---|
|
Upgrading of Bhadrapur-(Jhapa chowk) to Mechi Bridge Road, (1.3km), Jhapa |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, सुनसरी |
Rs. 4,58,83,017 |
100.00% |
|
|
Road Protection works at Mirchaiya-Katari-Ghurmi Road (Bhogateni Section) |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 48,46,883 |
96.86% |
|
|
Construction of 1. Lokanthali Manohara pul dekhi Tikathali Sadak and 2. Araniko Rajmarga Hanumante Khola Sadak, Manohara |
सडक डिभिजन, भक्तपुर |
Rs. 2,86,11,978 |
0.00% |
|
|
Supply of Construction Materials (Package-3) |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 7,98,450 |
0.00% |
|
|
Rehabilitation of basantapur (Tute Deurali)-mudhe-chainpur road (km 2+300 Tute Deurali to 12+300 Mudhe )section |
डिभिजन सडक कार्यालय, तुम्लीङटार, संखुवासभा |
Rs. 15,00,37,540 |
0.00% |
|
|
Construction of RCC Bridge Manohara Khola Bridge at (Changunaryan-Bramhakhel Road |
सडक डिभिजन, भक्तपुर |
Rs. 3,50,20,799 |
0.00% |
|
|
काष्टमाण्डप/धनन्जय जे.भि. |
उत्तर दक्षिण (कालिगण्डकी करिडोर) लोकमार्ग योजना, पाल्पा |
Rs. 3,76,70,499 |
85.00% |
|
|
Construction and Improvement of Kumaripokhari Gobhane Gairapokhara Bhuwanpani Lamdada Ninnichaur Lapsi Simaghat Road, Gulmi |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 40,91,180 |
0.00% |
|
|
Thodung-Himsagarmatha JV |
उत्तर दक्षिण (कालिगण्डकी करिडोर) लोकमार्ग योजना, पाल्पा |
Rs. 42,28,84,160 |
92.00% |
|
|
Emergency works at Besisahar Chame road, Manang sector (Track opening works) Ch 35+000 to Ch 50+000 |
डुम्रे बेसीशहर चामे सडक योजना, बेसीशहर लमजुङ |
Rs. 81,87,575 |
95.00% |
|
|
Blacktopped Road Construction work including Drainage Structures on Rangeli road ko Ramchowk dekhi Rameshwor mandal ko ghar hudai Sisbani jahada Pokhariya sima sadak, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 10,82,19,088 |
92.00% |
|
|
Roadway Excavation and Construction of Structures on Majuwa-Gadaamre-Sandanne Sadak |
मध्यपच्चिमाञ्चल क्षेत्रिय सडक निर्देशनालय,सुर्खेत |
Rs. 25,64,057 |
91.93% |
|
|
Roadway Excavation with Retaining Structures, Pipe Culverts, and Graveling works at Panthadihi Katahare Harmi Sahiltar Sadak, Gorkha. |
योजना तथा अनुगमन महाशाखा (भूवातावरण तथा सामाजिक शाखा) |
Rs. 41,17,670 |
52.00% |
|
|
Earthworks, structural works, cross drainage works and pavement worksalong Bhojpur-Diktel Road Sector |
Puspalal (Midhill) Road Project, Panchthar |
Rs. 19,70,53,320 |
0.00% |
|
|
Seugha Simaghat Purkotdaha Hadhade Pipaldhara Nayagaun Tamghas Road, Gulmi |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 57,44,524 |
0.00% |
|
|
Construction of Kachraute Khola Bridge along Midhill Highway(RCC 1*25m),Belkhet Achham |
Unknown |
Rs. 6,31,37,463 |
91.90% |
|
|
Traffic Safety Works Along Chainpur Khandbari Section (50+000 to 93+700) |
डिभिजन सडक कार्यालय, तुम्लीङटार, संखुवासभा |
Rs. 24,32,000 |
0.00% |
|
|
Roadway Excavation and Structure Works, Surkhet-Tallodungeshwor-Dullu-Pipalkot-Khulalu-Nagma-Jumla Road Dailekh (NH61). |
सडक डिभिजन, सुर्खेत |
Rs. 2,85,61,020 |
91.86% |
|
|
Roadway Excavation & Structural Works at Palanse-Nepalthok sector (ch13+500-27+500) Ramechhap District |
Puspalal (Midhill) Road Project, Kavrepalanchok |
Rs. 7,30,22,926 |
0.00% |
|
|
Improvement of Radha marg Sankhamul( package 3) |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 11,91,700 |
92.00% |
|
|
Surya Construction Firm Surkhet |
धनगढी-खुटिया-दिपायल-चैनपुर-उरैभन्ज्याङ्ग सडक योजना, बि.पी. नगर, डाेटी |
Rs. 8,04,80,734 |
94.00% |
|
|
Design & Build of Lal Bakaiya Bridge along Dharan- Chatara Road |
पुल योजना, मध्य क्षेत्र सेक्टर नं. २, काठमाण्डौ |
Rs. 9,42,16,592 |
100.00% |
|
|
Maintenance of Araniko Highway Ch 59+000-80+000 |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 6,14,05,815 |
0.00% |
|
|
Road Improvement wprks in shree Rajdal Gan Barreck Lagankhel. |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 91,96,729 |
90.00% |
|
|
Construction of RCC moterable Prestress bridge at Khorunga Khola |
Puspalal (Midhill) Road Project, Panchthar |
Rs. 4,39,74,907 |
100.00% |
|
|
Construction of RCC Box Culvert (3 cells*6*5) at Simari Khola, Dokebazar-Belauri-Beldadi-Daije Road, Kanchanpur (8+740) |
मध्यमाञ्चल क्षेत्रिय सडक निर्देशनालय, काठमाण्डौ |
Rs. 2,37,01,152 |
91.00% |
|
|
Specific maintenance Works at Dhulikhel-Khurkot Section of Dhulikhel-Sindhuli-Bardibas Road |
सूर्यविनायक-धुलिखेल, धुलिखेल-सिन्धुली-बर्दिवास सडक आयोजना, काठमाण्डौ |
Rs. 70,85,139 |
90.00% |
|
|
Maryadpur Sitalpur Mewa Sadak, Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 1,85,76,941 |
0.00% |
|
|
Specific Maintenance works on Chaukhutte-Sanfe Road Section, Achham |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 2,25,68,960 |
90.50% |
|
|
Road Improvement Works along Bagmati Na.Pa.11 chure bhitte chauri dekhi Mudekhola Sadak Nirman, sarlahi |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 29,66,735 |
100.00% |
|
|
Specific Maintenance on Lubhu - Sallaghari & Lubhu-Chasidole Road ,Lalitpur |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 1,46,52,140 |
0.00% |
|
|
Construction and Improvement of Kharbang Isma Pipaldhara Krishanagar Road, Gulmi |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 40,76,327 |
0.00% |
|
|
Road Upgrading works along Devinagar Chowk Yogikuti Shantichowk Purano Sadak Paschim Pahuni Road, Rupandehi |
सडक डिभिजन, वुटवल |
Rs. 88,73,529 |
100.00% |
|
|
Upgrading with widening of Shahidmarga Road Kakri - Maikot Section, Chainage (156+000 - 182+175 & Dimmar Gaira Hukam, Ch 196+000 to 208+007) |
शहीद मार्ग सडक योजना, रोल्पा |
Rs. 38,58,21,944 |
62.00% |
|
|
Construction of Blacktop Road Patibhanjyang Chahare Section in Nuwakot |
Puspalal (Midhill) Road Project, Gorkha |
Rs. 81,62,72,787 |
92.29% |
|
|
Construction of Black Top Road, Thasikhel-Mahalaxmisthan-Satdobato (Left Side) |
काठमाडौं चक्रपथ सुधार योजना, ललितपुर |
Rs. 1,74,21,129 |
0.00% |
|
|
Construction Of RCC Bridge Over Sikri Khola, Dolakha |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 3,27,04,306 |
97.00% |
|
|
Construction of Prestressed RCC Bridge over Pachi Khola (2 No*30 m Span, Total Length 64.10 m) along Rajbiraj Balan, Hulaki Road, Saptari |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, सुनसरी |
Rs. 5,88,59,366 |
0.00% |
|
|
Rehabilitation & Improvement of Existing Curve along Surkhet Dailekh Road (Chainage 5+000 - 25+000), Surkhet & Dailekh District |
सुदुरपच्चिमाञ्चल क्षेत्रिय सडक निर्देशनालय, डोटी |
Rs. 3,50,95,335 |
92.00% |
|
|
Janakpur(Mujeliya) Dhanushadham - Dharapani Ramayan sarkit sadak , Dhanusha at Mithleshwor towards Dhanushadham Section. RDJKR/33701138/077-078/39 |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 2,39,59,407 |
90.00% |