All Projects
Project |
Office |
Budget |
Progress |
Action |
|---|---|---|---|---|
|
Earthwork, Gravelling, Bituminious, Blacktop and Structure Works in Chandranigahpur Ring Road, Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 82,98,536 |
100.00% |
|
|
Bariyarpatti Bidhyanagar Dhangadhi Sadak |
डिभिजन सडक कार्यालय, सिराहा |
Rs. 7,98,78,576 |
0.00% |
|
|
Maintenance of Road in Ch: 69+000 (Gachhe) to Ch: 71+500 (Chutrabesi) Arghakhachi section along Saljhandi -Sandhikharka - Dhorpatan Road (NH-52) |
सालझण्डी सन्धिखर्क ढोरपाटन सडक योजना, अर्घाखांची |
Rs. 62,82,843 |
37.00% |
|
|
Construction of RCC Bridge Khahare Khola in Nuwakot |
Puspalal (Midhill) Road Project, Gorkha |
Rs. 2,23,98,573 |
0.00% |
|
|
Construction of Jallad river bridge between Digampur-03 & Harinpur-03, Dhanusha |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 19,66,15,455 |
92.00% |
|
|
11 kilo chhepetar Bhaluswara Barpak Sadak Gorkha 30+000 to 46+0000 |
गाेरखा सडक योजना, गोरखा |
Rs. 31,01,42,784 |
85.00% |
|
|
महुली घाडन (खाडो खोला पुल, रुपनी–कनौली सडक, सप्तरी, सिराहा |
डिभिजन सडक कार्यालय, सिराहा |
Rs. 5,42,95,612 |
0.00% |
|
|
Construction of Retaining Wall and Embankment and Gravel Works Tengrakhola Pul Pashupati Chowk Itahari Aproach Sadakma Retaining Structure Works |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 10,56,702 |
94.01% |
|
|
Road Improvement work in Dipayal –Mellekh-Bajhang Road.( Hume Pipe culvert,drain, Back cutting) |
सडक डिभिजन, डोटी |
Rs. 10,89,755 |
100.00% |
|
|
Black Top Works on Buddhabhumi Nagarpalika 10 Bich Gauri Chock To Maharajgang Nagarpalika 1Road, Kapilvastu |
सडक डिभिजन, कपिलवस्तु |
Rs. 2,10,81,748 |
100.00% |
|
|
Upgrading and construction of Rani-Biratnagar-Itahari-Dharan Road to six lane standards |
व्यापारिक मार्ग विस्तार आयोजना (रानी-बिराटनगर-इटहरी-धरान मार्ग), सुनसरी |
Rs. 59,95,51,983 |
98.00% |
|
|
Roadway upgrading works on Manang nasong gaopalika dharapani china ri bhanjyang Road, Manang |
सडक डिभिजन, तनहुं |
Rs. 62,96,000 |
0.00% |
|
|
Road Upgrading and rehabilitation works at Mirchaiya-Katari-Ghurmi Road (Ch. 1+775 to Ch. 4+300) |
हेभिईक्युपमेन्ट डिभिजन, काठमाण्डौ |
Rs. 6,67,26,871 |
84.00% |
|
|
Design & Build of Bridge over Trisuli River ,Simchaur , Gauribesi, Ward No 2 ra 4 Jodne ,Nuwakot |
पुल योजना, मध्य क्षेत्र सेक्टर नं. २, काठमाण्डौ |
Rs. 9,70,13,433 |
92.00% |
|
|
Road Improvement works at panchkhal Thumka road |
सडक डिभिजन, कञ्चनपुर |
Rs. 1,91,60,605 |
95.00% |
|
|
Specific Maintenance Works On Gangate-Labdhu-Samundratar Road, Nuwakot |
डिभिजन सडक कार्यालय, नुवाकोट |
Rs. 31,12,025 |
0.00% |
|
|
Upgrading works of Barhabise 5jambu kaseri Road |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 57,21,351 |
98.00% |
|
|
महेन्द्र राजमार्ग धानखोला शिवखोला सडक |
सडक डिभिजन, दाङ्ग |
Rs. 1,21,99,600 |
0.00% |
|
|
Construction of RCC Bridge over Teear River Bridge along bariyarpur- paterwa Road |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, वीरगंज, पर्सा |
Rs. 3,94,51,272 |
100.00% |
|
|
Road Upgrading works along Bhimad-Rampur-Mityaal-Aarungkholasadak, Nawalpur |
सडक डिभिजन, वुटवल |
Rs. 17,11,631 |
100.00% |
|
|
MIDHLPD/337011144/076/77 |
Puspalal (Midhill) Road Project, Dailekh |
Rs. 38,03,27,685 |
91.02% |
|
|
Road Upgradation of Danapur Tal Belbariya Chowk Pragati Chowk Materia Kaluwa Aichwal Gaidahawa Tal-Pahab Lalpur Chowk Bargahewa Chowk Ganauriya Lumbini Road |
सडक डिभिजन, बैतडी |
Rs. 1,33,80,098 |
100.00% |
|
|
Upgrading of Bhurigaun (MRM) Gulariya Murtiya Road (Ch. 18+000- Ch.36+000) |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, वाके |
Rs. 26,02,43,078 |
0.00% |
|
|
Construction of Gravel Road along Birta chok dekhi Shripur hudai Samanpur Sadak, Rautahat |
सडक डिभिजन, तनहुं |
Rs. 36,68,330 |
100.00% |
|
|
Construction of Black Topped Road and Cross Drainage Works at Garamuni Goldhap Bhutani Shibir Puhatubari Charali Road, Jhapa |
डिभिजन सडक कार्यालय, झापा |
Rs. 35,72,449 |
46.00% |
|
|
Construction of RCC Bridge Badigaad khola, Ullikhola |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 5,50,49,425 |
0.00% |
|
|
Construction of Prestressed RCC Bridge over Bhutani Khola (2 No*30 m Span, Total Length 64.2 m), along Bhadrapur-Jhapa Hulaki Road, Jhapa |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, सुनसरी |
Rs. 5,75,51,016 |
91.00% |
|
|
Construction of Bridge in Kotku River |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 4,34,88,419 |
100.00% |
|
|
D & B of kaligandaki River Bridge, Pokharebagar, Beni Jomsom Road |
पुल योजना पश्चिम क्षेत्र सेक्टर नंः ४, पाल्पा |
Rs. 7,28,77,203 |
0.00% |
|
|
Maintenance of Tamghas - Simaltari Section of Madan Bhandari Highway, Gulmi |
Unknown |
Rs. 2,78,96,408 |
70.00% |
|
|
Highway Upgrading (Backcutting, Roadway Gravelling and Side Drain Works)(C.n:RDSKT/337011384/2078-79-08) |
सडक डिभिजन, सुर्खेत |
Rs. 2,43,68,116 |
90.87% |
|
|
MIDHLDNG3371384/074/075 |
Puspalal (Midhill) Road Project, Dailekh |
Rs. 42,52,24,530 |
87.74% |
|
|
तुलसीपुर चोक खण्ड दाङ्ग । |
सडक डिभिजन, दाङ्ग |
Rs. 11,87,091 |
75.00% |
|
|
मुतनी खोला पुल,कनकट्टा ९ र बेल्हा ५ जोड्ने सडक, सप्तरी, सिराहा |
डिभिजन सडक कार्यालय, सिराहा |
Rs. 3,58,00,246 |
0.00% |
|
|
Nadaha-Koshi Bride, Chatara-Rupnagar Road Project |
आयोजना निर्देशनालय, ए.डि.वि., विशालनगर, काठमाण्डौ |
Rs. 1,95,13,86,296 |
99.00% |
|
|
Road Improvement works on Gangate Labdhu Samundratar Golphubhanjyang Road, Nuwakot (Package 3) |
डिभिजन सडक कार्यालय, नुवाकोट |
Rs. 1,15,68,626 |
0.00% |
|
|
Road Marking and Furniture Painting Works |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 19,67,760 |
0.00% |
|
|
Construction of Swargadwari marg, Mahalaxmi-5, Machitol, Lalitpur |
सडक डिभिजन, बैतडी |
Rs. 36,81,171 |
100.00% |
|
|
Upgrading of Dhangadhi Campus Chouk Katani Khola Road (CH: 0+000-7+000), Kailali. |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, धनगढी, कैलाली |
Rs. 33,12,24,702 |
89.53% |
|
|
Earthwork, Gravelling, Structure & Blacktop Works at Gaur Pipara Samanpur Santpur Sadak, Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 22,52,125 |
0.00% |