All Projects
Project |
Office |
Budget |
Progress |
Action |
|---|---|---|---|---|
|
Specific Maintenance works along Piluwa-Chainpur (38+000-56+000), Chainpur- Sabha (56+300-75+700)& Sabha- Khandbari Section (75+700-93+700) |
डिभिजन सडक कार्यालय, तुम्लीङटार, संखुवासभा |
Rs. 54,61,027 |
0.00% |
|
|
Roadway Excavation in Backcutting,Gabion Structures,Humepipe Culvert & Gravelling Works in Mahakali Highway[Syaule-Bagbazar Section] .(CH:130+000~134+000) |
सडक डिभिजन, डोटी |
Rs. 87,53,068 |
0.00% |
|
|
Periodic Maintenance Works on Ratna Rajmarg (Ch.101+000 to 102+500, 103+700 to 106+090) & Surkhet - Ranimatta - Dailekh (Ch.10+750 to 16+000) |
सडक डिभिजन, सुर्खेत |
Rs. 2,62,90,322 |
48.47% |
|
|
Upgrading/Improvement of Ghorahi- Holeri Section of Shahidmarga (Ch 0+000 to 31+500) |
शहीद मार्ग सडक योजना, रोल्पा |
Rs. 35,87,51,011 |
97.00% |
|
|
Bridge Construction Work over Kakarhawa Khola along Gadhawa-Hansipur-Kandara Mandir Road in Dang District |
सडक डिभिजन, दाङ्ग |
Rs. 6,47,89,960 |
45.00% |
|
|
Bridge Construction Works over Hapur Khola along eye hosiptal-Nighuwar Bagiya Road in Dang District |
सडक डिभिजन, दाङ्ग |
Rs. 5,93,71,582 |
0.00% |
|
|
Construction of Pavement & Structural Works, Kailali (Ch.44+400 to 45+850) |
Unknown |
Rs. 2,33,55,624 |
93.00% |
|
|
घोराही मुलाबारी -झिंङ्गा - छापडाँडा- कोईराले प्यूठान । |
सडक डिभिजन, दाङ्ग |
Rs. 16,85,514 |
0.00% |
|
|
Construction of Sitalpur-Malangwa-Kharaiyatol Road, Sarlahi Package II (Ch 15+000 to 30+000) |
गाईघाट दिक्तेल सडक योजना, उदयपुर |
Rs. 21,39,54,290 |
93.36% |
|
|
Upgrading/Widening of Rani-Biratnagar-Itahari-Dharan Road (Ch: km 9+700 to 11+200) |
व्यापारिक मार्ग विस्तार आयोजना (रानी-बिराटनगर-इटहरी-धरान मार्ग), सुनसरी |
Rs. 21,91,01,560 |
0.00% |
|
|
Roadway Excavation for back cutting at Seti Rajmarg (North Leg from Sanfebagar) |
सेति लोकमार्ग (टिकापुर, लोडे, चैनपुर, ताक्लाकोट) सडक योजना, अछाम |
Rs. 1,39,15,410 |
0.00% |
|
|
Upgrading of Gadhimai-Bariyarpur Kawahi Road,Bara (10.6) Km |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, वीरगंज, पर्सा |
Rs. 48,42,06,348 |
95.00% |
|
|
Roadway Protection works along Karnali Highway Shimle Ghat to Balighat Section (Ch 173+500 to 185+000) Kalikot |
सडक डिभिजन, बैतडी |
Rs. 6,70,43,389 |
7.35% |
|
|
Recurrent (Reactive) maintenance work along Maldhunga- Beni Road Section (Package-2) |
Road Division, Baglung |
Rs. 15,74,022 |
100.00% |
|
|
Installation of Bailey Bridge Over Sandhi Khola Araniko Highway |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 9,27,297 |
0.00% |
|
|
Reactive Maintenance Works on Byas Marga (Damauli-Neupanebesi- Bhorletar Road),Tanahun, Lamjung |
सडक डिभिजन, तनहुं |
Rs. 34,73,635 |
100.00% |
|
|
Hatiya Harnamadi Ratmatedanda Diyawati hudai Aiklekhel Road,Makawanpur District,Road Surface improvement,Cross drainage work etc |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 2,98,79,783 |
0.00% |
|
|
Katahari Chowk bata Lohandra Khola Hudai Majhare jodne Sadak |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 5,49,82,214 |
92.00% |
|
|
Rehabiliation and Upgrading of Highway (Periodic Repair of Road Surface) Gokuleshwor-Khalanga Section (Ch.77+000 Km-89+000 Km) |
सडक डिभिजन, बैतडी |
Rs. 1,52,65,165 |
0.00% |
|
|
Extension (widening) of East-West Highway (Ch 1013+960 to Ch 1021+140) |
सडक डिभिजन, कञ्चनपुर |
Rs. 66,11,938 |
100.00% |
|
|
Road Safety & miscellaneous works at Dhulikhel to Bardibas Road Section |
सूर्यविनायक-धुलिखेल, धुलिखेल-सिन्धुली-बर्दिवास सडक आयोजना, काठमाण्डौ |
Rs. 35,72,944 |
0.00% |
|
|
भेरीगङ्गा नपा-3 जुरे-सुवाघाट-गङ्गामाला न.पा-9 भेरी नदी मोटरेवल पुल, सुर्खेत |
पुल योजना, पश्चिम क्षेत्र सेक्टर नं. ३, वांके |
Rs. 16,68,98,407 |
93.00% |
|
|
Construction of Steel Truss Bridge Over Sunkoshi River at Siyale Dovan |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 5,96,43,036 |
98.00% |
|
|
Construction and Improvement of Aglung Bajhakateri Simalatari Siladi Arkhabang Bhimghitthe Road |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 44,04,000 |
0.00% |
|
|
Specific Maintenance works along Ganaha-Chackchake-Liwang Rolpa-Madichaur-Darbot Road(Sulichaur-Liwang-Simalbang Section) In Rolpa District. |
Road Division, Pyuthaan |
Rs. 1,05,91,750 |
95.11% |
|
|
MIDHLDNG/3371384/073/074 |
Puspalal (Midhill) Road Project, Dailekh |
Rs. 79,95,20,031 |
85.58% |
|
|
Construction of RCC Bridge over Shisne Khola at Gauradaha Baigundhura Road, Jhapa |
डिभिजन सडक कार्यालय, झापा |
Rs. 2,47,12,125 |
100.00% |
|
|
Upgrading/improvement works of Devdaha Tinau Parsa section(3+000 to 45+600) |
लुम्बिनी परिक्रमा , बर्दघाट - पालडांडा त्रिवेणी सडक योजना, रुपन्देही |
Rs. 52,92,82,656 |
0.00% |
|
|
Rehabilitation Works at Rapti Lokmarg, Khaula-Salle Section Package 3, (Ch 111+000~115+000) |
डिभिजन सडक कार्यालय, चौरजहारी |
Rs. 1,44,63,637 |
0.00% |
|
|
Upgrading of Naya Road Barathwa Madhuwani Road, (Hirapur Bazaar to Madhuwani section), Ch: 21+000 to 40+580 |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, जनकपुर, धनुषा |
Rs. 32,86,08,634 |
0.00% |
|
|
Construction of Bardaghate - Ghuthi Parsauni Road & Ghuthi Parsauni - Ratangunj - Narsahi - Kudiya Road in Nawalparasi (Bardaghat Susta West ) District. |
सडक डिभिजन, वुटवल |
Rs. 43,98,507 |
0.00% |
|
|
Structure Works on Dhapakhel (Ishimod) NTC (Thecho) Road Lalitpur |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 22,96,688 |
0.00% |
|
|
Dano River, Sisai koluhuwa Road, Bangai |
सडक डिभिजन, वुटवल |
Rs. 8,54,26,429 |
90.00% |
|
|
Construction of Drain Works at Garuda Samanpur Sadakko Malahitole Bariyarpur hudai Bagmati Kinar Sadak, Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 18,23,536 |
100.00% |
|
|
Road and Traffic Safety work on Harkapur-okhaldhunga-salleri Road (Ch: km 46+000 - 100+000) |
डिभिजन सडक कार्यालय, हर्कपुर, ओखलढुङगा |
Rs. 13,19,000 |
97.30% |
|
|
Roadway Excavation for Track Opening at Seti Rajmarg (North Leg from Sanfebagar) |
सेति लोकमार्ग (टिकापुर, लोडे, चैनपुर, ताक्लाकोट) सडक योजना, अछाम |
Rs. 5,58,23,393 |
0.00% |
|
|
Dewahi Gonahi Inarwa Inarwari Kopwa Piparaiya Auraiya Sadak, Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 2,33,74,169 |
0.00% |
|
|
Road Construction and Improvement works on Bharatiya Sima Sirsya Chhoti Bhansar Dekhi Dryport Sugauli Apauni Dardakha Ratanpur hudai Milanchowk Pathlaiya upto Rajmarg, Parsa |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 2,87,25,991 |
0.00% |
|
|
Design & Build of Three Bridges Along Madan Bhandari Highway, Ilam |
मदन भण्डारी राजमार्ग योजना कार्यालय, दमक |
Rs. 37,01,16,040 |
100.00% |
|
|
Aspghalt Road Construction on Satdobato Khumaltar Sadak bata Baikalpik Urja ko Bato Hudain Radio Nepal ko Tower Utter ko Sadak. Lalitpur |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 56,80,650 |
0.00% |