All Projects
Project |
Office |
Budget |
Progress |
Action |
|---|---|---|---|---|
|
Road Upgrading Works, Tinpane-Tikabhairab Section (Ch. 71+000 to 79+000Km) |
कान्ती लोकपथ सडक योजना, ललितपुर |
Rs. 14,83,06,602 |
100.00% |
|
|
Road infrasrtructure Developement works in milijulimarg, Shanti Tole, Mahalaxmi Na.pa.3 |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 12,30,206 |
93.26% |
|
|
Roadway Excavation with Retaining Structure and Blacktop works at Bhandarthok-Bayepani -Kerabari-Bhuddhasing Kharibot Hudai Dudhpokhari Marga |
मध्यपच्चिमाञ्चल क्षेत्रिय सडक निर्देशनालय,सुर्खेत |
Rs. 38,23,769 |
93.00% |
|
|
Construction of PSC bridge over Jhimruk river along Kairan Sarangbesi Road, Pyuthan |
Road Division, Pyuthaan |
Rs. 7,45,57,248 |
96.56% |
|
|
Extension of Imadol-Siddhipur-Godawari Khola-Lubhu-Lamatar Road Section Ch.: 3+126 to 7+215 |
काठमाण्डौ उपत्यका सडक विस्तार आयोजना, काठमाण्डौ |
Rs. 45,86,86,869 |
95.00% |
|
|
Road Maintenance Works with improvement of Grades and Curves on Besisahar Chame Road [ ch 23+100], Syange, Lamjung |
डुम्रे बेसीशहर चामे सडक योजना, बेसीशहर लमजुङ |
Rs. 50,39,304 |
93.17% |
|
|
Road construction and Improvement works at Jomsom-Jhaite(Ch. 0+000-18+000) |
कालिगण्डकी कोरिडोर (बेनी जोमसोम कोरोला सडक योजना), जोमसोम, मुस्ताङ |
Rs. 27,97,86,724 |
0.00% |
|
|
Periodic Maintenance (Asphalt Overlay) Works along Hetauda-Lothar Section of MRM(CH 415+000 To CH 425+000) |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 6,12,63,166 |
0.00% |
|
|
खुटी खोला पुल, लहान न.पा. वडा नं. १०, सिराहा |
डिभिजन सडक कार्यालय, सिराहा |
Rs. 9,49,47,047 |
0.00% |
|
|
Periodic Maintenance Works (Premix Overlay Works) along Damak Chakrapath (Buspark-Beldangi-Tarabari (MRM)-Setumari Section, Jhapa |
मध्यमाञ्चल क्षेत्रिय सडक निर्देशनालय, काठमाण्डौ |
Rs. 1,54,05,471 |
94.00% |
|
|
Construction of Prestressed RCC Bridge over Bandarmude khola (1 no *25 m spna,Total length 26.20 m ) along madi thori road,Chitwan |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, वीरगंज, पर्सा |
Rs. 4,35,28,035 |
96.00% |
|
|
Extention & Improvement of Mohanapul Attariya Road |
मोहनापुल अत्तरीया सडक योजना कार्यालय, कैलाली |
Rs. 51,62,04,915 |
90.00% |
|
|
Imadol-Siddhipur-Godawari Road (Ch. 0+000 to 3+126) |
काठमाण्डौ उपत्यका सडक विस्तार आयोजना, काठमाण्डौ |
Rs. 20,80,39,511 |
65.00% |
|
|
Design & Build of Kamala Bridge along Hulaki Rajmarg(Kanchanpur-Kamala Sector),12/HRP/067/068 |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, जनकपुर, धनुषा |
Rs. 22,04,40,000 |
0.00% |
|
|
Design & Build of Nusari Khola Bridge along Madan Bhandari Highway, Morang |
मदन भण्डारी राजमार्ग योजना कार्यालय, दमक |
Rs. 38,42,48,672 |
100.00% |
|
|
Construction of Road Structures, cross drainage works from Gangare (135+000) to Devisthan (162+000) section along Saljhandi Sandhikharka Dhorpatan Road |
सालझण्डी सन्धिखर्क ढोरपाटन सडक योजना, अर्घाखांची |
Rs. 2,30,15,334 |
0.00% |
|
|
Excavation of Roadway and Structural works on Batase Mainadi road section. |
सडक डिभिजन, पाल्पा |
Rs. 36,06,958 |
100.00% |
|
|
Upgrading and Construction of Rani-Biratnagar-Itahari-Dharan Road to six lane standards (Ch: km 3+000 to 6+000) |
व्यापारिक मार्ग विस्तार आयोजना (रानी-बिराटनगर-इटहरी-धरान मार्ग), सुनसरी |
Rs. 61,42,83,916 |
99.79% |
|
|
Design and Build of Three Bridges along Madan Bhandari Highway ( Basaha-Bhiman Section ) Udayapur |
धरान चतरा गाइघाट कटारी सिन्धुली हेटौंडा सडक आयोजना (पुर्वी खण्ड), गाइघाट, उदयपुर |
Rs. 33,55,13,893 |
100.00% |
|
|
मसिना - हापुर -आँखा अस्पत्ताल - पवननगर- पुरन्धारा सडक (आखा अस्पत्ताल देखी हापुर) |
सडक डिभिजन, दाङ्ग |
Rs. 84,44,806 |
60.00% |
|
|
Road construction and Improvement works at Jhaite-Koralla (Ch. 0+000-19+000) |
कालिगण्डकी कोरिडोर (बेनी जोमसोम कोरोला सडक योजना), जोमसोम, मुस्ताङ |
Rs. 23,04,98,813 |
0.00% |
|
|
D & B of Marsayandi Nadi Bridge Connecting Tutrure & Tanahun |
पुल योजना पश्चिम क्षेत्र सेक्टर नंः ४, पाल्पा |
Rs. 6,24,24,955 |
95.00% |
|
|
Jagrati Nirman sewa |
सेती राजमार्ग (उत्तर खण्ड) चैनपुर ताक्लाकोट सडक योजना, बझाङ्ग |
Rs. 78,18,477 |
0.00% |
|
|
Roadway Upgrading Works along Ganesh Mandir - Bhainsakhori Road, Nawalpur |
डिभिजन सडक कार्यालय, चितवन |
Rs. 1,89,74,545 |
95.00% |
|
|
Periodic Maintenance Works (Asphalt concrete overlay) works in different section of Parasi (ch22+250m) – Bhumahi |
डिभिजन सडक कार्यालय, झापा |
Rs. 2,10,58,441 |
100.00% |
|
|
Roadway Improvement and RCC Pavement Works on Besisahar Chame Road (0+000 Km to 35+000 Km) |
सडक डिभिजन, तनहुं |
Rs. 53,99,762 |
0.00% |
|
|
Construction of RCC Bridge over Aduwa khola at MRM Birtamod jhapa |
डिभिजन सडक कार्यालय, झापा |
Rs. 6,29,15,557 |
80.00% |
|
|
Construction of RCC Bridge over Mainala(Bahatti) Khola on chadani 5 & 6, Kanchanpur |
सडक डिभिजन, कञ्चनपुर |
Rs. 3,65,02,277 |
100.00% |
|
|
Hariwon Na.Pa.-9 hudai Purba Paschim Rajmarg dekhi uttar Bishnupur hudai Purano Bajar Atrauli Pakar Gachhi hudai Ganesh Chowk Tibre Sadak, Sarlahi |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 51,81,202 |
0.00% |
|
|
Construction of 1X40 m pre-stressed RCC bridge over Gijagad Aathbiskot Municipality, Rukum (West) |
डिभिजन सडक कार्यालय, चौरजहारी |
Rs. 5,42,07,802 |
0.00% |
|
|
Construction of Babai River (Jabdighat) Bridge Works, Bardiya |
सडक डिभिजन, वांके |
Rs. 16,68,04,308 |
0.00% |
|
|
Mahinathpur-7 Harkathwa-6 Hanuman Chok Sisautiya Sadak, Sarlahi |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 18,22,500 |
0.00% |
|
|
Specific Maintenance Works in East West Highway (Mahendra Rajmarga Butwal Kothi section) and Siddartha Rajmarga (Golpark-Chidiya Khola Section), Rupandehi |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 58,56,687 |
100.00% |
|
|
Road improvement workalong Nayagaun- Belbariya- Krishnagunj Road in Rupandehi District. |
सडक डिभिजन, वुटवल |
Rs. 1,46,17,992 |
100.00% |
|
|
TRIP/PB/3373124/072/073-02 |
व्यापारिक मर्ग विस्तार योजना / विरगंज-पथलैया खण्ड, पथलैया |
Rs. 43,05,15,700 |
100.00% |
|
|
Upgrading of Ratuwa-Keshaliya Road (Ratuwa-Dainiya Section, Ch 0+000-16+500) |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, सुनसरी |
Rs. 67,75,53,707 |
91.00% |
|
|
Gravel Road Construction Works Including Drainage Structures along Sanischare bajar Singari Mahadeva Sadak Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 1,05,14,020 |
97.11% |
|
|
Design & Build of Morangi Khola Bridge along Madan Bhandari Highway, Morang. |
मदन भण्डारी राजमार्ग योजना कार्यालय, दमक |
Rs. 27,13,19,026 |
100.00% |
|
|
Jhimruk Gaunpalika Sametne Gari Double Lane Nali Nirman (Badikhola Junction to Hirapokhari Section), Pyuthan |
Road Division, Pyuthaan |
Rs. 4,63,31,190 |
0.00% |
|
|
Roadway Excavation & Improvement upto Gravel top Standard along Bahunepati-Dolalghat-Chaurikhola sector (ch36+492-53+030) Kavrepalanchwok District |
Puspalal (Midhill) Road Project, Kavrepalanchok |
Rs. 38,39,58,443 |
91.76% |