Default Image

Road Upgrading Works, Tinpane-Tikabhairab Section (Ch. 71+000 to 79+000Km)

कान्ती लोकपथ सडक योजना, ललितपुर

Rs. 14,83,06,602

100.00%

Default Image

Road infrasrtructure Developement works in milijulimarg, Shanti Tole, Mahalaxmi Na.pa.3

डिभिजन सडक कार्यालय, ललितपुर

Rs. 12,30,206

93.26%

Default Image

Roadway Excavation with Retaining Structure and Blacktop works at Bhandarthok-Bayepani -Kerabari-Bhuddhasing Kharibot Hudai Dudhpokhari Marga

मध्यपच्चिमाञ्चल क्षेत्रिय सडक निर्देशनालय,सुर्खेत

Rs. 38,23,769

93.00%

Default Image

Construction of PSC bridge over Jhimruk river along Kairan Sarangbesi Road, Pyuthan

Road Division, Pyuthaan

Rs. 7,45,57,248

96.56%

Default Image

Extension of Imadol-Siddhipur-Godawari Khola-Lubhu-Lamatar Road Section Ch.: 3+126 to 7+215

काठमाण्डौ उपत्यका सडक विस्तार आयोजना, काठमाण्डौ

Rs. 45,86,86,869

95.00%

Default Image

Road Maintenance Works with improvement of Grades and Curves on Besisahar Chame Road [ ch 23+100], Syange, Lamjung

डुम्रे बेसीशहर चामे सडक योजना, बेसीशहर लमजुङ

Rs. 50,39,304

93.17%

Default Image

Road construction and Improvement works at Jomsom-Jhaite(Ch. 0+000-18+000)

कालिगण्डकी कोरिडोर (बेनी जोमसोम कोरोला सडक योजना), जोमसोम​, मुस्ताङ

Rs. 27,97,86,724

0.00%

Default Image

Periodic Maintenance (Asphalt Overlay) Works along Hetauda-Lothar Section of MRM(CH 415+000 To CH 425+000)

डिभिजन सडक कार्यालय, मकवानपुर

Rs. 6,12,63,166

0.00%

Default Image

खुटी खोला पुल, लहान न.पा. वडा नं. १०, सिराहा

डिभिजन सडक कार्यालय, सिराहा

Rs. 9,49,47,047

0.00%

Default Image

Periodic Maintenance Works (Premix Overlay Works) along Damak Chakrapath (Buspark-Beldangi-Tarabari (MRM)-Setumari Section, Jhapa

मध्यमाञ्चल क्षेत्रिय सडक निर्देशनालय, काठमाण्डौ

Rs. 1,54,05,471

94.00%

Default Image

Construction of Prestressed RCC Bridge over Bandarmude khola (1 no *25 m spna,Total length 26.20 m ) along madi thori road,Chitwan

हुलाकी राजमार्ग आयोजना, योजना कार्यालय, वीरगंज, पर्सा

Rs. 4,35,28,035

96.00%

Default Image

Extention & Improvement of Mohanapul Attariya Road

मोहनापुल अत्तरीया सडक योजना कार्यालय, कैलाली

Rs. 51,62,04,915

90.00%

Default Image

Imadol-Siddhipur-Godawari Road (Ch. 0+000 to 3+126)

काठमाण्डौ उपत्यका सडक विस्तार आयोजना, काठमाण्डौ

Rs. 20,80,39,511

65.00%

Default Image

Design & Build of Kamala Bridge along Hulaki Rajmarg(Kanchanpur-Kamala Sector),12/HRP/067/068

हुलाकी राजमार्ग आयोजना, योजना कार्यालय, जनकपुर​, धनुषा

Rs. 22,04,40,000

0.00%

Default Image

Design & Build of Nusari Khola Bridge along Madan Bhandari Highway, Morang

मदन भण्डारी राजमार्ग योजना कार्यालय​, दमक

Rs. 38,42,48,672

100.00%

Default Image

Construction of Road Structures, cross drainage works from Gangare (135+000) to Devisthan (162+000) section along Saljhandi Sandhikharka Dhorpatan Road

सालझण्डी सन्धिखर्क ढोरपाटन सडक योजना, अर्घाखांची

Rs. 2,30,15,334

0.00%

Default Image

Excavation of Roadway and Structural works on Batase Mainadi road section.

सडक डिभिजन, पाल्पा

Rs. 36,06,958

100.00%

Default Image

Upgrading and Construction of Rani-Biratnagar-Itahari-Dharan Road to six lane standards (Ch: km 3+000 to 6+000)

व्यापारिक मार्ग विस्तार आयोजना (रानी-बिराटनगर-इटहरी-धरान मार्ग), सुनसरी

Rs. 61,42,83,916

99.79%

Default Image

Design and Build of Three Bridges along Madan Bhandari Highway ( Basaha-Bhiman Section ) Udayapur

धरान चतरा गाइघाट कटारी सिन्धुली हेटौंडा सडक आयोजना (पुर्वी खण्ड​), गाइघाट, उदयपुर

Rs. 33,55,13,893

100.00%

Default Image

मसिना - हापुर -आँखा अस्पत्ताल - पवननगर- पुरन्धारा सडक (आखा अस्पत्ताल देखी हापुर)

सडक डिभिजन, दाङ्ग

Rs. 84,44,806

60.00%

Default Image

Road construction and Improvement works at Jhaite-Koralla (Ch. 0+000-19+000)

कालिगण्डकी कोरिडोर (बेनी जोमसोम कोरोला सडक योजना), जोमसोम​, मुस्ताङ

Rs. 23,04,98,813

0.00%

Default Image

D & B of Marsayandi Nadi Bridge Connecting Tutrure & Tanahun

पुल योजना पश्चिम क्षेत्र सेक्टर नंः ४, पाल्पा

Rs. 6,24,24,955

95.00%

Default Image

Jagrati Nirman sewa

सेती राजमार्ग (उत्तर खण्ड​) चैनपुर ताक्लाकोट सडक योजना, बझाङ्ग

Rs. 78,18,477

0.00%

Default Image

Roadway Upgrading Works along Ganesh Mandir - Bhainsakhori Road, Nawalpur

डिभिजन सडक कार्यालय, चितवन

Rs. 1,89,74,545

95.00%

Default Image

Periodic Maintenance Works (Asphalt concrete overlay) works in different section of Parasi (ch22+250m) – Bhumahi

डिभिजन सडक कार्यालय, झापा

Rs. 2,10,58,441

100.00%

Default Image

Roadway Improvement and RCC Pavement Works on Besisahar Chame Road (0+000 Km to 35+000 Km)

सडक डिभिजन, तनहुं

Rs. 53,99,762

0.00%

Default Image

Construction of RCC Bridge over Aduwa khola at MRM Birtamod jhapa

डिभिजन सडक कार्यालय, झापा

Rs. 6,29,15,557

80.00%

Default Image

Construction of RCC Bridge over Mainala(Bahatti) Khola on chadani 5 & 6, Kanchanpur

सडक डिभिजन, कञ्चनपुर

Rs. 3,65,02,277

100.00%

Default Image

Hariwon Na.Pa.-9 hudai Purba Paschim Rajmarg dekhi uttar Bishnupur hudai Purano Bajar Atrauli Pakar Gachhi hudai Ganesh Chowk Tibre Sadak, Sarlahi

डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर

Rs. 51,81,202

0.00%

Default Image

Construction of 1X40 m pre-stressed RCC bridge over Gijagad Aathbiskot Municipality, Rukum (West)

डिभिजन सडक कार्यालय, चौरजहारी

Rs. 5,42,07,802

0.00%

Default Image

Construction of Babai River (Jabdighat) Bridge Works, Bardiya

सडक डिभिजन, वांके

Rs. 16,68,04,308

0.00%

Default Image

Mahinathpur-7 Harkathwa-6 Hanuman Chok Sisautiya Sadak, Sarlahi

डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर

Rs. 18,22,500

0.00%

Default Image

Specific Maintenance Works in East West Highway (Mahendra Rajmarga Butwal Kothi section) and Siddartha Rajmarga (Golpark-Chidiya Khola Section), Rupandehi

डिभिजन सडक कार्यालय, मोरङ

Rs. 58,56,687

100.00%

Default Image

Road improvement workalong Nayagaun- Belbariya- Krishnagunj Road in Rupandehi District.

सडक डिभिजन, वुटवल

Rs. 1,46,17,992

100.00%

Default Image

TRIP/PB/3373124/072/073-02

व्यापारिक मर्ग विस्तार योजना / विरगंज​-पथलैया खण्ड​, पथलैया

Rs. 43,05,15,700

100.00%

Default Image

Upgrading of Ratuwa-Keshaliya Road (Ratuwa-Dainiya Section, Ch 0+000-16+500)

हुलाकी राजमार्ग आयोजना, योजना कार्यालय, सुनसरी

Rs. 67,75,53,707

91.00%

Default Image

Gravel Road Construction Works Including Drainage Structures along Sanischare bajar Singari Mahadeva Sadak Morang

डिभिजन सडक कार्यालय, मोरङ

Rs. 1,05,14,020

97.11%

Default Image

Design & Build of Morangi Khola Bridge along Madan Bhandari Highway, Morang.

मदन भण्डारी राजमार्ग योजना कार्यालय​, दमक

Rs. 27,13,19,026

100.00%

Default Image

Jhimruk Gaunpalika Sametne Gari Double Lane Nali Nirman (Badikhola Junction to Hirapokhari Section), Pyuthan

Road Division, Pyuthaan

Rs. 4,63,31,190

0.00%

Default Image

Roadway Excavation & Improvement upto Gravel top Standard along Bahunepati-Dolalghat-Chaurikhola sector (ch36+492-53+030) Kavrepalanchwok District

Puspalal (Midhill) Road Project, Kavrepalanchok

Rs. 38,39,58,443

91.76%