All Projects

Project
Office
Budget
Progress
Action
Default Image

Design & Build of five Bridges along Madan Bhandari Highway (Botechaur-Bhedabari-Dhuliyabit Section), Surkhet

योजना तथा अनुगमन महाशाखा (HMIS तथा ICT शाखा)

Rs. 19,13,09,352

71.00%

Default Image

गिदेरी खोला पुलरामपुर ठोक्सीला ७ पत्रे, उदयपुर, सिराहा

डिभिजन सडक कार्यालय, सिराहा

Rs. 13,39,67,479

0.00%

Default Image

MIDHLPD/337011144/076/77

Puspalal (Midhill) Road Project, Dailekh

Rs. 42,85,80,012

0.00%

Default Image

Construction of Radheshyami Khola Bridge, Dhangadhi-8

योजना तथा अनुगमन महाशाखा (HMIS तथा ICT शाखा)

Rs. 3,64,97,642

44.11%

Default Image

Mitra Builders Pvt. Ltd.

धनगढी-खुटिया-दिपायल-चैनपुर-उरैभन्ज्याङ्ग सडक योजना, बि.पी‍. नगर, डाेटी

Rs. 4,16,22,149

60.00%

Default Image

Roadway Excavation and Structural Works in Sakar-Bayalchaur-Patan Road

डिभिजन सडक कार्यालय, मोरङ

Rs. 29,07,418

51.72%

Default Image

खलंगा मार्के कालीमाटी रामपुर कोहलपुर सडक

सडक डिभिजन, दाङ्ग

Rs. 43,95,204

0.00%

Default Image

Roadway Excavation and Structure works along Jorayal Sahajpur Road, Doti

सुनसरी मोरङ्ग पुल निर्माण आयोजना, सुनसरी

Rs. 7,00,57,964

44.00%

Default Image

Construction of RCC Prestress Bridge Over Sunkoshi Khola at Barhabise Dhuskun Piskar Kharidhunga Road (Ch 1+000KM)

डिभिजन सडक कार्यालय, दोलखा

Rs. 3,29,93,860

0.00%

Default Image

Upgrading of Gaighat-Diktel Road Sector DBST,Simpani-Mahure Section

गाईघाट दिक्तेल सडक योजना, उदयपुर

Rs. 41,48,12,379

44.00%

Default Image

Premix Carpeting Works on Simraungadh Na.Pa. Ganganagar to Ranibas Jawalnagar Bharat Seema Road, Bara

डिभिजन सडक कार्यालय, मकवानपुर

Rs. 77,68,677

0.00%

Default Image

Rehabilitation Works along Hetauda-Chure-Pathalaiya Section of MRM

डिभिजन सडक कार्यालय, मकवानपुर

Rs. 1,04,20,453

0.00%

Default Image

Specific Maintenance Works on Seti Highway

हेभिईक्युपमेन्ट डिभिजन, सुनसरी

Rs. 30,32,509

50.00%

Default Image

Periodic Maintenance work in Gaira-Hagulte Section along Mahakali Rajmarg.

सडक डिभिजन, डोटी

Rs. 1,51,66,740

45.00%

Default Image

Recurrent (Reactive) Maintenace work on Chaukhutte-Sanfe-Martadi Road Section

डिभिजन सडक कार्यालय, साँफेवगर, अछाम

Rs. 45,50,426

44.00%

Default Image

RoadWay Excavation,Structural Works,Drainage Works Bartung-Tansen-Ridi Section

पुर्वाञ्चल क्षेत्रिय सडक निर्देशनालय, झापा

Rs. 1,68,84,874

50.00%

Default Image

Construction of RCC Girder Bridge with Well Foundation Over Bangari River at Banjariya

डिभिजन सडक कार्यालय, मकवानपुर

Rs. 4,80,86,479

0.00%

Default Image

Consrtuction of HPC and Blacktop Works at Tarapatti- Uttimpur Laliya Sadak, Dhanusha

डिभिजन सडक कार्यालय, धनुषा

Rs. 85,79,061

0.00%

Default Image

Upgrading to Blacktop ( Asphalt Concrete works) of Tamor Corridor ( Mulghat Majhitar Amarpurdanda Subhang Ganeshchwok Road Section NH-06 109+000 to 155+260

सडक विभाग, काठमाण्डौ

Rs. 1,26,22,72,461

33.11%

Default Image

Road Rehabilitation works on Dwari-Martadi Road Section (CH: 41+000~57+000)

डिभिजन सडक कार्यालय, साँफेवगर, अछाम

Rs. 4,91,01,720

43.00%

Default Image

Recurrent Maintenance Works on Chure Pathlaiya Section of TRP

डिभिजन सडक कार्यालय, मकवानपुर

Rs. 22,10,481

0.00%

Default Image

Road Improvement works along Rautahat Gaur Pipara Madhopur Binagra Dhobiniya Manpur Sahid Smarak Jaynagar Dipahi Chok Khesarahiya Bhelhi Bhediyahi Rajpurtulasi Pachraukhi Sabik Matsari-3 Bagmati Baandh Samm Sadak, Rautahat (Gaur to Matsari Section)

हेभिईक्युपमेन्ट डिभिजन, वुटवल

Rs. 4,98,92,230

90.00%

Default Image

Recurrent Maintenance Work ( Pothole Repair with Bituminous Emulsion) Karnali Highway, (Nagma-Jumla Khalanga Section) NH61-005-A

सडक विभाग, काठमाण्डौ

Rs. 39,28,183

43.23%

Default Image

Widening and Upgrading of Basantpur - Gufapokhari - Sanghu - Dhunge sanghu - Dovan Road

डिभिजन सडक कार्यालय, तुम्लीङटार, संखुवासभा

Rs. 9,61,34,251

0.00%

Default Image

Construction of bridge over Ghodaha River along Devdaha Mayadevi park in Rupandehi district

सडक डिभिजन, वुटवल

Rs. 8,19,00,152

0.00%

Default Image

Road construction works

डिभिजन सडक कार्यालय, ईलाम

Rs. 76,36,200

0.00%

Default Image

Construction of Bridge on Trishuli River along Devghat, Thimura Road

डिभिजन सडक कार्यालय, चितवन

Rs. 16,53,24,303

80.00%

Default Image

Structural Cross Drainage and Bituminous Works on Janabikas Bhimkali marga road, Palpa.

सडक डिभिजन, पाल्पा

Rs. 14,62,197

0.00%

Default Image

देवस्थल कैनडाँडा चौरजहारी सडक

सडक डिभिजन, दाङ्ग

Rs. 93,53,903

0.00%

Default Image

Construction of Prestressed Girder RCC Bridge in Altai Holi Bridge,Larikatta Damra bhitta Road,Morang

डिभिजन सडक कार्यालय, मोरङ

Rs. 4,42,55,049

43.00%

Default Image

Mallirani(Mallarani Ga.pa. ward no. 4)-patihalna(Pyuthan na.pa.10)-Bukeni-Sanilekh-Arwang-Kukhure-Gaida-Tham-Chadule-Solaina-Goyal chhaida-seme deurali(Arghakhanchi) Ratanmare-Khandaha-Tamghas, Pyuthan Road CH(4+220 to 14+220)

डिभिजन सडक कार्यालय, काठमाण्डौ

Rs. 22,27,55,210

70.00%

Default Image

Construction of Remaining Part of Danda and Tinau Bridge along Bhairahawa-Lumbini Road Section, Rupandehi

योजना तथा अनुगमन महाशाखा (योजना अनुगमन तथा मुल्यांकन शाखा)

Rs. 9,12,35,962

45.00%

Default Image

Pavement Works Including Cross Drainage and retaining Structures along Gachiya- lochani- Sheshanarayan Divyadham Road, Morang

डिभिजन सडक कार्यालय, मोरङ

Rs. 12,32,42,793

42.99%

Default Image

Construction of Black top Road including Drainage Structure along Jhakhan jhora Madhesa Pakali Raod, Sunsari

डिभिजन सडक कार्यालय, मोरङ

Rs. 1,16,94,401

43.00%

Default Image

Rigid Pavments and RCC Retaining Works for River Side Road Protection at Chame, Manang (Ch 103+500)

डिभिजन सडक कार्यालय, झापा

Rs. 3,66,23,326

30.00%

Default Image

Construction ofRCC Prestressed Motorable Bridge over Bhangaha river in Dhanusha district(Bhuckkkar-Pashupatinagar road between Bateshwar Ga. Pa. and Bhangaha Na. Pa.)

डिभिजन सडक कार्यालय, धनुषा

Rs. 12,50,14,881

60.00%

Default Image

Roadway Excavation and structural works on Belkhet-Talagad-Bhanakot Road Section, Achham

डिभिजन सडक कार्यालय, साँफेवगर, अछाम

Rs. 52,73,135

44.00%

Default Image

Kalika Vedanshee J.V.

धनगढी-खुटिया-दिपायल-चैनपुर-उरैभन्ज्याङ्ग सडक योजना, बि.पी‍. नगर, डाेटी

Rs. 12,56,80,071

55.00%

Default Image

भरत बोर्डर छिनमस्ता फकिरा मलेकपुर कटैया रुपनी गाईघाट सडक , सप्तरी

डिभिजन सडक कार्यालय, सिराहा

Rs. 4,86,88,315

0.00%

Default Image

Construction of road along Tinau Danav Corridor (Danav Section, Chainage km 2+480 to km 4+290, both side of river: Total length = 3.620 km) in Rupandehi district.

Unknown

Rs. 17,19,35,773

43.00%