Construction of Motorable Bridge at Damde/Chipe Khola along Bhojpur Diktel Road, Khotang (RCC 1*20m)

Puspalal (Midhill) Road Project, Kavrepalanchok

Rs. 3,71,55,725

0.00%

Default Image

Construction Of RCC Multi Cell Box Bridge (3x10*x5) Over katani River Along Mithaleshwar Tarapatti chowk to Laliyajane bato over katani nadi, Dhanusha

डिभिजन सडक कार्यालय, धनुषा

Rs. 3,31,12,452

50.00%

Default Image

Construction of RCC Bridge over Pankhu Khola, Khotang

Puspalal (Midhill) Road Project, Kavrepalanchok

Rs. 2,02,99,767

0.00%

Default Image

Road Widening Works on Bharatpur Bypass Road

डिभिजन सडक कार्यालय, चितवन

Rs. 11,34,36,236

0.00%

Default Image

Maintenance of Hatiya Burtibang Road Section

Puspalal (Midhill) Road Project, Parbat

Rs. 2,19,37,458

50.00%

Default Image

Construction of Blacktop road Including Drainage Structure in Katahari-Majhare Pokhariya -Nocha Road, Morang

डिभिजन सडक कार्यालय, मोरङ

Rs. 10,61,90,486

45.00%

Default Image

Construction of Nibu khola bridge

डिभिजन सडक कार्यालय, ईलाम

Rs. 3,15,68,392

0.00%

Default Image

Upgrading of Kanchanpur-Kamala Road( Km 189+300 to Km 236+703)

सडक विभाग, काठमाण्डौ

Rs. 6,91,19,11,933

52.38%

Default Image

सन्तोषी/प्यासिफिक/नेपाल प्रगति जे.भि.

उत्तर दक्षिण (कालिगण्डकी करिडोर) लोकमार्ग योजना, पाल्पा

Rs. 12,84,63,223

35.00%

Default Image

Upgrading of Rakathum Jordhara (ChauriKhola) Road Section of Midhill Highway (Ch: 0+000 to 11+156 km) Ramechhap

Puspalal (Midhill) Road Project, Kavrepalanchok

Rs. 43,06,93,498

4.00%

Default Image

Reactive maintenance works of Betrawti-Dhunche Section and Dhunche-Syaprubesi section, Rasuwa

Unknown

Rs. 27,65,595

50.00%

Default Image

Road Upgrading works on Gairi Naruwal Kaphalswara Daregauda Duredanda Road, Lamjung

डिभिजन सडक कार्यालय, धनुषा

Rs. 31,69,841

50.00%

Default Image

Construction of Road Works on Mahendra Highway Jamkauli Fasera Faserni Sauraha Road,Chitwan

डिभिजन सडक कार्यालय, चितवन

Rs. 53,91,148

0.00%

Default Image

Improvement of Mariyaghat-Thapapur-Jhabai-Bauniya Road, Kailali (Ch 9+500 To 9+695 from Border), Kailali

सडक डिभिजन, कञ्चनपुर

Rs. 20,80,206

50.00%

Default Image

Construction of R.C.C Bridge Over Sapahi River along Janakpur Dhalkebar Road, Dhanusha

Janakpur Parikrama, Byparik Margha Bistaar Yojana (Jatahi-Janakpur), Mahottari

Rs. 12,94,54,741

0.00%

Default Image

Roadway Excavation Works and Maintenance Works along Khulalu Salli Salla Road(Chaingage 60+000 to 80+000), Humla (HSRP/337011184/078/79-11)

हिल्सा सिमिकोट सडक योजना, हुम्ला

Rs. 1,20,98,948

0.00%

Default Image

Roadway Excavation Works and Maintenance Works along Khulalu Salli Salla Road(Chaingage 60+000 to 80+000), Humla (HSRP/337011184/078/79-11)

हिल्सा सिमिकोट सडक योजना, हुम्ला

Rs. 1,20,98,948

0.00%

Default Image

Construction of Blacktopped Works on Baraghare Kamal Dekhi Schoolchaun Gauradaha 5 Road, Jhapa

डिभिजन सडक कार्यालय, झापा

Rs. 1,79,21,604

0.00%

Default Image

Construction of Prestressed RCC Bridge over Parawi khola (3 no *30 m spna,Total length 97.10m ) along madi thori road,Chitwan

हुलाकी राजमार्ग आयोजना, योजना कार्यालय, वीरगंज, पर्सा

Rs. 6,51,55,223

100.00%

Default Image

Road upgrading and improvement works at Khadpu chowk to Chaukot B.P. Highway

सडक डिभिजन, भक्तपुर

Rs. 3,02,70,690

55.00%

Default Image

Construction of Pre Stressed RCC Bridge Over Pampa Khola Bridge Shreekot Birendra Nagar, Chitwan

डिभिजन सडक कार्यालय, चितवन

Rs. 6,24,95,241

0.00%

Default Image

Roadway Excavation/Back Cutting and Structural Works on Dalleraha-Aappata Tahari Batule Bhalaya Dada Road, Panini-6,7, Arghakhanchi

डिभिजन सडक कार्यालय, धनकुटा

Rs. 37,36,298

44.22%

Default Image

Construction of Road protection & Side Drain Works along Chaurikhola Lubughat bazaar (Ch. 78+117 to 97+020) of Midhill Highway, Ramechhap

Unknown

Rs. 3,81,57,854

16.00%

Default Image

Sitalpur Malangwa Kharahiya Tola (Hulaki Package-1)

डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर

Rs. 20,51,99,068

0.00%

Default Image

Roadway Excavation & Structural Works (Mall village-Ghatibagar)

दार्चुला टिङकर सडक योजना, दार्चुला

Rs. 6,96,28,633

0.00%

Default Image

Specific Works at Chharchhare veer of Samakhusi-Tokha-Gurje-Chhahare Road (NH 40), Nuwakot

डिभिजन सडक कार्यालय, नुवाकोट

Rs. 37,75,000

0.00%

Default Image

Road Protection works along Karnali Highway Ch 160+500 and amp; 164+500 Kalikot

सडक डिभिजन, भक्तपुर

Rs. 97,88,699

44.41%

Default Image

Construction of single span (20m length) RCC Bridge Godawari khola Bridge with pile Foundation.

पुर्वाञ्चल क्षेत्रिय सडक निर्देशनालय, झापा

Rs. 5,17,26,683

0.00%

Default Image

Road work on Chandanatth Nagarpalika-3 Shimkhada gaun dekhi karnali prabidhik Shichalaya jane bato Kalopatre Jumla

डिभिजन सडक कार्यालय, नुवाकोट

Rs. 27,76,228

14.68%

Default Image

Rigid Pavement and drain works

सडक डिभिजन, सुर्खेत

Rs. 88,89,265

100.00%

Default Image

Road Upgrading works along Madichaur- Kureli-Chunbang Sadak, Rolpa

Road Division, Pyuthaan

Rs. 64,77,312

0.00%

Default Image

Rehabilitation of Gwarko-Lubhu-Lakuribhanjyang Road, Lalitpur

हेभिईक्युपमेन्ट डिभिजन, वुटवल

Rs. 1,19,77,493

0.00%

Default Image

Improvement of Surya Mohan Chowk-Samarat Hotel-Town Bazar Road, Kanchanpur (Chainage 0+000 to 1+565 from Samrat Tole, Pipalchautari)

सडक डिभिजन, कञ्चनपुर

Rs. 1,09,42,631

50.00%

Default Image

Periodic Maintenance of Rehabilation & Upgrading works along Champi Tikabhairab Road

डिभिजन सडक कार्यालय, ललितपुर

Rs. 2,47,01,882

0.00%

Default Image

Upgrading/Improvement of Baddichaur-Gutu Karnali (Km 23+340 to 45+300) Section of Madan Bhandari Highway (NH09) to Blacktop Standard, Surkhet

पुर्वाञ्चल क्षेत्रिय सडक निर्देशनालय, झापा

Rs. 1,02,39,85,818

45.00%

Default Image

Construction of Hume Pipe Culverts Works at Balchanpur Jangalsaiya Kolbi Sadak, Rautahat

डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर

Rs. 20,22,049

0.00%

Default Image

Upgrading of Mirmi-Setibeni Road (Ch 0+000 to 7+000) Syangja

उत्तर दक्षिण (कालिगण्डकी करिडोर) लोकमार्ग योजना, पाल्पा

Rs. 19,48,06,363

50.00%

Default Image

Road improvement works along Butwal Bypass Road/Link Road (ButwalDhagoKarkhana- Yogikuti- Magarghat- Tamnagar Road and RangasalaHattisude Road)in Rupandehi District.

हेभिईक्युपमेन्ट डिभिजन, मकवानपुर

Rs. 2,98,85,008

44.00%

Default Image

Specific Maintenance Works along Karnali Highway ( Ch 205+000 to 236+000 ), In Jumla

डिभिजन सडक कार्यालय, जुम्ला

Rs. 60,16,651

0.00%

Default Image

Upgrading of Dhangadhi Campus Chouk Katani Khola Road (CH: 7+000-19+000), Kailali.

हुलाकी राजमार्ग आयोजना, योजना कार्यालय, धनगढी, कैलाली

Rs. 28,59,14,374

45.00%