All Projects
Project |
Office |
Budget |
Progress |
Action |
|---|---|---|---|---|
|
Construction of Motorable Bridge at Damde/Chipe Khola along Bhojpur Diktel Road, Khotang (RCC 1*20m) |
Puspalal (Midhill) Road Project, Kavrepalanchok |
Rs. 3,71,55,725 |
0.00% |
|
|
Construction Of RCC Multi Cell Box Bridge (3x10*x5) Over katani River Along Mithaleshwar Tarapatti chowk to Laliyajane bato over katani nadi, Dhanusha |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 3,31,12,452 |
50.00% |
|
|
Construction of RCC Bridge over Pankhu Khola, Khotang |
Puspalal (Midhill) Road Project, Kavrepalanchok |
Rs. 2,02,99,767 |
0.00% |
|
|
Road Widening Works on Bharatpur Bypass Road |
डिभिजन सडक कार्यालय, चितवन |
Rs. 11,34,36,236 |
0.00% |
|
|
Maintenance of Hatiya Burtibang Road Section |
Puspalal (Midhill) Road Project, Parbat |
Rs. 2,19,37,458 |
50.00% |
|
|
Construction of Blacktop road Including Drainage Structure in Katahari-Majhare Pokhariya -Nocha Road, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 10,61,90,486 |
45.00% |
|
|
Construction of Nibu khola bridge |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 3,15,68,392 |
0.00% |
|
|
Upgrading of Kanchanpur-Kamala Road( Km 189+300 to Km 236+703) |
सडक विभाग, काठमाण्डौ |
Rs. 6,91,19,11,933 |
52.38% |
|
|
सन्तोषी/प्यासिफिक/नेपाल प्रगति जे.भि. |
उत्तर दक्षिण (कालिगण्डकी करिडोर) लोकमार्ग योजना, पाल्पा |
Rs. 12,84,63,223 |
35.00% |
|
|
Upgrading of Rakathum Jordhara (ChauriKhola) Road Section of Midhill Highway (Ch: 0+000 to 11+156 km) Ramechhap |
Puspalal (Midhill) Road Project, Kavrepalanchok |
Rs. 43,06,93,498 |
4.00% |
|
|
Reactive maintenance works of Betrawti-Dhunche Section and Dhunche-Syaprubesi section, Rasuwa |
Unknown |
Rs. 27,65,595 |
50.00% |
|
|
Road Upgrading works on Gairi Naruwal Kaphalswara Daregauda Duredanda Road, Lamjung |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 31,69,841 |
50.00% |
|
|
Construction of Road Works on Mahendra Highway Jamkauli Fasera Faserni Sauraha Road,Chitwan |
डिभिजन सडक कार्यालय, चितवन |
Rs. 53,91,148 |
0.00% |
|
|
Improvement of Mariyaghat-Thapapur-Jhabai-Bauniya Road, Kailali (Ch 9+500 To 9+695 from Border), Kailali |
सडक डिभिजन, कञ्चनपुर |
Rs. 20,80,206 |
50.00% |
|
|
Construction of R.C.C Bridge Over Sapahi River along Janakpur Dhalkebar Road, Dhanusha |
Janakpur Parikrama, Byparik Margha Bistaar Yojana (Jatahi-Janakpur), Mahottari |
Rs. 12,94,54,741 |
0.00% |
|
|
Roadway Excavation Works and Maintenance Works along Khulalu Salli Salla Road(Chaingage 60+000 to 80+000), Humla (HSRP/337011184/078/79-11) |
हिल्सा सिमिकोट सडक योजना, हुम्ला |
Rs. 1,20,98,948 |
0.00% |
|
|
Roadway Excavation Works and Maintenance Works along Khulalu Salli Salla Road(Chaingage 60+000 to 80+000), Humla (HSRP/337011184/078/79-11) |
हिल्सा सिमिकोट सडक योजना, हुम्ला |
Rs. 1,20,98,948 |
0.00% |
|
|
Construction of Blacktopped Works on Baraghare Kamal Dekhi Schoolchaun Gauradaha 5 Road, Jhapa |
डिभिजन सडक कार्यालय, झापा |
Rs. 1,79,21,604 |
0.00% |
|
|
Construction of Prestressed RCC Bridge over Parawi khola (3 no *30 m spna,Total length 97.10m ) along madi thori road,Chitwan |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, वीरगंज, पर्सा |
Rs. 6,51,55,223 |
100.00% |
|
|
Road upgrading and improvement works at Khadpu chowk to Chaukot B.P. Highway |
सडक डिभिजन, भक्तपुर |
Rs. 3,02,70,690 |
55.00% |
|
|
Construction of Pre Stressed RCC Bridge Over Pampa Khola Bridge Shreekot Birendra Nagar, Chitwan |
डिभिजन सडक कार्यालय, चितवन |
Rs. 6,24,95,241 |
0.00% |
|
|
Roadway Excavation/Back Cutting and Structural Works on Dalleraha-Aappata Tahari Batule Bhalaya Dada Road, Panini-6,7, Arghakhanchi |
डिभिजन सडक कार्यालय, धनकुटा |
Rs. 37,36,298 |
44.22% |
|
|
Construction of Road protection & Side Drain Works along Chaurikhola Lubughat bazaar (Ch. 78+117 to 97+020) of Midhill Highway, Ramechhap |
Unknown |
Rs. 3,81,57,854 |
16.00% |
|
|
Sitalpur Malangwa Kharahiya Tola (Hulaki Package-1) |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 20,51,99,068 |
0.00% |
|
|
Roadway Excavation & Structural Works (Mall village-Ghatibagar) |
दार्चुला टिङकर सडक योजना, दार्चुला |
Rs. 6,96,28,633 |
0.00% |
|
|
Specific Works at Chharchhare veer of Samakhusi-Tokha-Gurje-Chhahare Road (NH 40), Nuwakot |
डिभिजन सडक कार्यालय, नुवाकोट |
Rs. 37,75,000 |
0.00% |
|
|
Road Protection works along Karnali Highway Ch 160+500 and amp; 164+500 Kalikot |
सडक डिभिजन, भक्तपुर |
Rs. 97,88,699 |
44.41% |
|
|
Construction of single span (20m length) RCC Bridge Godawari khola Bridge with pile Foundation. |
पुर्वाञ्चल क्षेत्रिय सडक निर्देशनालय, झापा |
Rs. 5,17,26,683 |
0.00% |
|
|
Road work on Chandanatth Nagarpalika-3 Shimkhada gaun dekhi karnali prabidhik Shichalaya jane bato Kalopatre Jumla |
डिभिजन सडक कार्यालय, नुवाकोट |
Rs. 27,76,228 |
14.68% |
|
|
Rigid Pavement and drain works |
सडक डिभिजन, सुर्खेत |
Rs. 88,89,265 |
100.00% |
|
|
Road Upgrading works along Madichaur- Kureli-Chunbang Sadak, Rolpa |
Road Division, Pyuthaan |
Rs. 64,77,312 |
0.00% |
|
|
Rehabilitation of Gwarko-Lubhu-Lakuribhanjyang Road, Lalitpur |
हेभिईक्युपमेन्ट डिभिजन, वुटवल |
Rs. 1,19,77,493 |
0.00% |
|
|
Improvement of Surya Mohan Chowk-Samarat Hotel-Town Bazar Road, Kanchanpur (Chainage 0+000 to 1+565 from Samrat Tole, Pipalchautari) |
सडक डिभिजन, कञ्चनपुर |
Rs. 1,09,42,631 |
50.00% |
|
|
Periodic Maintenance of Rehabilation & Upgrading works along Champi Tikabhairab Road |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 2,47,01,882 |
0.00% |
|
|
Upgrading/Improvement of Baddichaur-Gutu Karnali (Km 23+340 to 45+300) Section of Madan Bhandari Highway (NH09) to Blacktop Standard, Surkhet |
पुर्वाञ्चल क्षेत्रिय सडक निर्देशनालय, झापा |
Rs. 1,02,39,85,818 |
45.00% |
|
|
Construction of Hume Pipe Culverts Works at Balchanpur Jangalsaiya Kolbi Sadak, Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 20,22,049 |
0.00% |
|
|
Upgrading of Mirmi-Setibeni Road (Ch 0+000 to 7+000) Syangja |
उत्तर दक्षिण (कालिगण्डकी करिडोर) लोकमार्ग योजना, पाल्पा |
Rs. 19,48,06,363 |
50.00% |
|
|
Road improvement works along Butwal Bypass Road/Link Road (ButwalDhagoKarkhana- Yogikuti- Magarghat- Tamnagar Road and RangasalaHattisude Road)in Rupandehi District. |
हेभिईक्युपमेन्ट डिभिजन, मकवानपुर |
Rs. 2,98,85,008 |
44.00% |
|
|
Specific Maintenance Works along Karnali Highway ( Ch 205+000 to 236+000 ), In Jumla |
डिभिजन सडक कार्यालय, जुम्ला |
Rs. 60,16,651 |
0.00% |
|
|
Upgrading of Dhangadhi Campus Chouk Katani Khola Road (CH: 7+000-19+000), Kailali. |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, धनगढी, कैलाली |
Rs. 28,59,14,374 |
45.00% |