Reactive Maintenance Works on Gorusinge-Sandhikharka Road at Chakla-Bhuwanpata (CH 30+000-43+000), Arghakhanchi |
सडक डिभिजन, कपिलवस्तु |
Rs. 74,04,944 |
0.00% |
|
|
Improvement of Bhajani-Karmadev Ghat-Gulariyaghat Road, Kailali |
सडक डिभिजन, कञ्चनपुर |
Rs. 19,75,268 |
55.00% |
|
|
Road Improvement Works at Chandrapur Na.Pa. Santpur dekhi Brindawan Na.Pa. ra Gadhimai Na.Pa.-1 hudai Garuda Na.Pa.ko Garuda Bazar Sammako Sadak ra Garuda Na.Pa.ko Birtachokko Paschim pattiko Sadak hudai Bhusaha hudai Wada Aurahi hudai Bargajwa Akarpatar hudai Huseni Chok Narkatiya Bhawanipur hudai Hardiya Sadak, Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 3,04,21,541 |
100.00% |
|
|
Roadway Excavation Works and Maintenance Works along Khulalu Salli Salla Road (Chainage 40+000 to 60+000), Humla (HSRP/337011184/078/79-10) |
हिल्सा सिमिकोट सडक योजना, हुम्ला |
Rs. 1,20,33,302 |
0.00% |
|
|
Roadway Excavation Works and Maintenance Works along Khulalu Salli Salla Road (Chainage 40+000 to 60+000), Humla (HSRP/337011184/078/79-10) |
हिल्सा सिमिकोट सडक योजना, हुम्ला |
Rs. 1,20,33,302 |
0.00% |
|
|
Road Improvements Works of Ghasa-Jomsom Section (Ch. 20+000-38+550), Beni Jomsom Koralla Road |
कालिगण्डकी कोरिडोर (बेनी जोमसोम कोरोला सडक योजना), जोमसोम, मुस्ताङ |
Rs. 62,47,07,971 |
60.00% |
|
|
Earthwork, Blacktop and Structure Works along Laxminiya Fulkaha Sundarpur Sonma Raghunathpur Sadak, Mahottari |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 2,54,61,308 |
0.00% |
|
|
Construction of Box Culvert & Hume Pipe Culvert along Gaur Chakrapath, Rautahat |
सडक डिभिजन, कञ्चनपुर |
Rs. 42,35,506 |
100.00% |
|
|
Reactive Maintenance works along Satdobato(Sumeru Hospital)- Dhapakhel Road |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 30,64,173 |
0.00% |
|
|
Construction of Bridge over Sokhu and Khangsang Khola along Midhill Highway |
Puspalal (Midhill) Road Project, Kavrepalanchok |
Rs. 9,23,87,675 |
0.00% |
|
|
Upgrading of road to Black top-291~292+340,293+320-298,302~304+521-CAB/Gwallek JV |
मध्यमाञ्चल क्षेत्रिय सडक निर्देशनालय, काठमाण्डौ |
Rs. 37,76,77,216 |
47.36% |
|
|
Reactive Maintenance Works on Aanbu Khaireni - Gorkha Highway (Chainage No. 0+000 to 24+000) |
सडक डिभिजन, तनहुं |
Rs. 56,28,433 |
0.00% |
|
|
Construction of Cast in Situ 2 Webbed PSC Bridge over Lohandra Khola, Sohal, Jahada, Sisawariya, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 7,82,58,166 |
45.00% |
|
|
कुइरेपानी तुलसीपुर सडक दाङ |
सडक डिभिजन, दाङ्ग |
Rs. 40,39,850 |
0.00% |
|
|
सल्यान लुहाम फालावाङ मखनटाकुरी सडक |
सडक डिभिजन, दाङ्ग |
Rs. 51,80,171 |
0.00% |
|
|
Design &Build of Dudhaura River Bridge,Along East West Highway,Bara,(BBPCU-DB-3373204-074/75-001 |
पुल योजना, मध्य क्षेत्र सेक्टर नं. २, काठमाण्डौ |
Rs. 15,22,57,248 |
48.00% |
|
|
Maintenance Works of Birgunj Site Camp, Birgunj, Parsa |
हेभिईक्युपमेन्ट डिभिजन, काठमाण्डौ |
Rs. 22,47,805 |
60.00% |
|
|
Road Improvement Works Omsatiya Ga. Pa. for Basantapur- Hattifarsaatikar - Kaanchhibazaar - Ganeshnagar East-West Highway Connecting Road |
सडक डिभिजन, वुटवल |
Rs. 1,27,05,588 |
46.00% |
|
|
Black Top Works on Bhumikasthan-10 Halde dekhi tallo Dhanchaur hudai Lisekuna samma Sadak, Arghakhanchi |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 42,97,288 |
46.86% |
|
|
Design and Build of Bridge over Jhapri Khola, Seti Rajmarga (Kailali-Doti-Achham), Kailali |
मध्यमाञ्चल क्षेत्रिय सडक निर्देशनालय, काठमाण्डौ |
Rs. 26,62,05,000 |
50.00% |
|
|
Upgrading of Burtibang Patihalne Road Baglung to Black topped Standard. |
Puspalal (Midhill) Road Project, Parbat |
Rs. 31,53,07,286 |
0.00% |
|
|
E/W and RCC Road along Lohanako Purano puldekhi Bohuwarba samma nadiko side bat sadak, Dhanusha |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 29,45,000 |
0.00% |
|
|
Construction of Blacktopped Road at Damak-Krishna Mandir-Pingdanda-Dharanetole-Satomara-Aambari hudai Itahara Road |
डिभिजन सडक कार्यालय, झापा |
Rs. 93,90,968 |
0.00% |
|
|
Construction of RCC Bridge over Musepani Khola., Kanchanpur |
सडक डिभिजन, कञ्चनपुर |
Rs. 13,65,74,393 |
65.00% |
|
|
Construction of Tamadi Khola Bridge along Pokhara Baglung Road, Sadh Khola Pul-Maldhunga Road Section Parbat |
Unknown |
Rs. 5,44,29,874 |
60.00% |
|
|
Construction Of RCC Multi Cell Box Bridge (2x10*x5) Over Jallad River along Janakpur Sub-Metropolitan City 1 and 16 Jodne, Dhanusha |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 2,65,45,821 |
95.00% |
|
|
Road Upgrading Works on Chhimkeshwari Marga, Aabu Chhimkeshwari Hilekharka Baradi Sadak, Tanahun |
सडक डिभिजन, तनहुं |
Rs. 1,01,65,718 |
0.00% |
|
|
Construction of Pre-Stressed RCC Bridge (Pile Foundation) in Soti Khola Bridge |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 2,45,27,795 |
0.00% |
|
|
Road Improvement Works (Rigid Pavement) on Hatisar Fettepur Inarwa Bhalui Road, Bara |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 1,11,56,716 |
0.00% |
|
|
Roadway Excavation, Structural Cross Drainage and Gravelling Works on Bhimad-Rampur-Mityal-Arunkhola(Dhunganabesi-Mityal section) Road |
सडक डिभिजन, पाल्पा |
Rs. 67,85,860 |
60.00% |
|
|
Construction of 40 m Prestressed Bridge over Thotne Khola along Rumjatar-Thotne-Khanibhanjyang-Kuibhir Road Okhaldhunga |
डिभिजन सडक कार्यालय, हर्कपुर, ओखलढुङगा |
Rs. 5,54,49,360 |
50.00% |
|
|
Periodic Maintenance works on Sanfe-Martadi (CH: 27+000 to 55+240) Road Section |
हेभिईक्युपमेन्ट डिभिजन, वांके |
Rs. 5,05,35,561 |
47.00% |
|
|
Periodic Maintenance of Junction Road LELE Tikabhairav Road |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 60,00,989 |
99.00% |
|
|
Construction of feme khola bridge |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 3,28,30,450 |
46.64% |
|
|
Improvement of Khajuriya bhansar- Nayagaun- Bhagatpur-Kalkatta- Khairjar Baibah Helthpost Jhilmaila-Imiliya-Beldangi- Daiji Road, Kanchanpur |
सडक डिभिजन, कञ्चनपुर |
Rs. 47,27,633 |
0.00% |
|
|
Extension & improvement works at Jawalakhel Saata Kapurbot bata Purba hudai ringroad Yatayat Byabasta Karyalaya Sammako sadak |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 5,41,35,382 |
0.00% |
|
|
Singiya Khola Bridge Construction work Tetariya 2 and Dangraha 6, morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 4,09,12,762 |
99.50% |
|
|
Asphalt Overlay Works in Sindhuli-Khurkot Section of Dhulikhel-Sindhuli Bardibas Road at Chainage 49+935-51+760&74+600-76+000 |
सूर्यविनायक-धुलिखेल, धुलिखेल-सिन्धुली-बर्दिवास सडक आयोजना, काठमाण्डौ |
Rs. 1,78,70,770 |
0.00% |
|
|
Upgrading works on Mathillo Dungeshwor - Beurakhet - Dharampokhara Road, Dailekh District(RDSKT/33701176-4/078/79-50) |
सडक डिभिजन, सुर्खेत |
Rs. 17,35,20,627 |
46.59% |
|
|
Earthwork , Garvelling and Humepipe Culvert Works along Binahi Basahia ( Basahia Saptami Mela jane bato ) sadak |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 51,69,068 |
0.00% |