All Projects
Project |
Office |
Budget |
Progress |
Action |
|---|---|---|---|---|
|
Danab River along Dayanagar Chhapiya |
सडक डिभिजन, वुटवल |
Rs. 7,52,66,524 |
77.00% |
|
|
Concrete Rigid pavement Construction works on Chepang Marga(Thori-Bhandara-Lother-Malekhu) Road,Chitwan |
डिभिजन सडक कार्यालय, चितवन |
Rs. 4,31,27,877 |
0.00% |
|
|
Recurrent Maintenance works along MRM (NH01) Butwal-Kothi Section and SRM (NH47) Chidiyakhola-Siddhababa Section |
सडक डिभिजन, वुटवल |
Rs. 62,27,602 |
100.00% |
|
|
Roadway Iprovement on Harthok-jorte-Ridi sector of Barting-Riadi-Tamghas Road palpa-Gulmi |
सडक डिभिजन, पाल्पा |
Rs. 43,50,047 |
0.00% |
|
|
Construction of blacktop & Retaining Wall along Purandaha Purano chowk Bhutahi MahendraRajmarg Sadak ,Dhanusha . |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 44,84,520 |
0.00% |
|
|
Road improvement and Construction of Retaining structure at Gangkhel to Sita Petrol Pump |
काठमाडौं चक्रपथ सुधार योजना, ललितपुर |
Rs. 4,09,48,650 |
0.00% |
|
|
Construction of RCC bridge at Nang Khola, Chang Khola and Jor Khola |
उत्तर दक्षिण, कोशी सडक योजना, संखुवासभा |
Rs. 10,96,41,442 |
0.00% |
|
|
Construction of Blacktopped Road at Damak-Krishna Mandir-Pingdanda-Dharanetole-Satomara-Aambari hudai Itahara Road |
डिभिजन सडक कार्यालय, झापा |
Rs. 91,29,297 |
0.00% |
|
|
अमर/सुर्य/पशुपति जे.भि. |
उत्तर दक्षिण (कालिगण्डकी करिडोर) लोकमार्ग योजना, पाल्पा |
Rs. 4,86,89,649 |
100.00% |
|
|
Roadway Improvement and Kulo Maintenance of Khurkot Ghurmi Road |
Puspalal (Midhill) Road Project, Kavrepalanchok |
Rs. 2,44,65,753 |
0.00% |
|
|
Road improvement works of Dhadingbesi bazar, Dhading. |
सडक डिभिजन, वांके |
Rs. 2,83,64,805 |
80.00% |
|
|
Extension of Chabhil-Jorpati-Sankhu Road (Ch. 0+000 to 3+600) |
काठमाण्डौ उपत्यका सडक विस्तार आयोजना, काठमाण्डौ |
Rs. 37,54,57,443 |
85.97% |
|
|
Blacktiop Works on Pasamari Balubari Road, Jhapa |
डिभिजन सडक कार्यालय, झापा |
Rs. 1,55,41,375 |
90.00% |
|
|
Construction of RCC Bridge over Maleriya Nala on Bayalgandha-Babathan Road, Kanchanpur |
सडक डिभिजन, कञ्चनपुर |
Rs. 3,65,01,495 |
100.00% |
|
|
Reactive Maintenance Works of Tribhuvan Rajpath-Sopryang, DB-Naubise (NH41) |
योजना तथा अनुगमन महाशाखा (योजना अनुगमन तथा मुल्यांकन शाखा) |
Rs. 14,64,985 |
85.00% |
|
|
Roadway Excavation of Sanfebagar Mellekha Rishidah Road |
डिभिजन सडक कार्यालय, साँफेवगर, अछाम |
Rs. 1,04,94,552 |
90.00% |
|
|
Construction of Ambot Khola Bridge, Parbat (25 m) |
Road Division, Baglung |
Rs. 3,75,18,751 |
90.00% |
|
|
Extension of Karmanasha Khola-Harisiddhi-Godawari Road (Ch. 4+150 to 7+600) |
काठमाण्डौ उपत्यका सडक विस्तार आयोजना, काठमाण्डौ |
Rs. 33,68,83,278 |
86.00% |
|
|
Earth Work Gabion Work and Structure Work in Basantapur Gufapokhari Dhunge Sanghu Dobhan Road (Madan Bhandari Marg) |
डिभिजन सडक कार्यालय, तुम्लीङटार, संखुवासभा |
Rs. 11,21,70,962 |
0.00% |
|
|
Roadway excavation with Retaining Structure and R.C.C.Pavement at Namjung Ghairung Fujel Sadak Kalopatray. |
डिभिजन सडक कार्यालय, धनकुटा |
Rs. 23,77,081 |
83.00% |
|
|
TRIP/PB/3373124/074/075-08 |
व्यापारिक मर्ग विस्तार योजना / विरगंज-पथलैया खण्ड, पथलैया |
Rs. 32,93,41,813 |
100.00% |
|
|
Extension of Road from Satdobato-Khumaltar-Dhapakhel(Gems School) Road & Ring Road-Dholahiti(Chapagaun) Road |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 8,81,83,802 |
0.00% |
|
|
Construction of RCC Bridge over Chandrawati river along laxmipur -Jagarnathpur-supauli-sankarsaraiya Road |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 2,83,47,001 |
0.00% |
|
|
Design and Build of Tilabe Bridge Along Birganj-Thori Hulaki Rajmarg,Parsa |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, वीरगंज, पर्सा |
Rs. 7,71,73,750 |
97.24% |
|
|
Roadway excavation, Retaining Structure and cross drain Construction on Chisapani-Sigarebas-Taksar-Road, Kaski |
सडक डिभिजन, पोखरा |
Rs. 55,09,803 |
0.00% |
|
|
Road side slope protection(Chainage 61+900, 70+700, 72+400 and 82+500) and rigid pavement works (Chainage 83+100) at Araniko Rajmarga NH-34 Sindhupalchowk |
हेभिईक्युपमेन्ट डिभिजन, कैलाली |
Rs. 3,08,42,099 |
15.00% |
|
|
Upgrading of Campus Chowk to Mohana Bridge Road, Kailali |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, धनगढी, कैलाली |
Rs. 20,45,34,784 |
0.00% |
|
|
Road Upgrading works along Madichaur-Kureli-Chunbang Road in Rolpa District . |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 55,17,857 |
85.00% |
|
|
Construction of RCC Bridge over Maleriya Nala on Dodhara Chandani-1, Purnagiri Primary School West of Kathe Pool, Kanchanpur |
सडक डिभिजन, कञ्चनपुर |
Rs. 3,76,98,092 |
86.00% |
|
|
Construction Of RCC Multi Cell Box Bridge (2x10*x5) Over Banhari River Mukhiyapattee Musarniya ward no. 1 ra 2 jodne sadak, Dhanusha (RDJKR/33701122/077-78/46) |
यान्त्रिक कार्यालय, चितवन |
Rs. 2,26,52,554 |
86.00% |
|
|
Construction of RCC Retaining Wall, Masonary Works Replacement of Expansion Joints and Maintenance of Steel Railings along E/W Highway (270+900, 275+500, 281+500, 281+900, 258+600 |
पच्चिमाञ्चल क्षेत्रिय सडक निर्देशनालय, पोखरा |
Rs. 38,81,920 |
85.00% |
|
|
TRIP/PB/3373124/072/073-05 |
व्यापारिक मर्ग विस्तार योजना / विरगंज-पथलैया खण्ड, पथलैया |
Rs. 67,70,04,331 |
92.00% |
|
|
Periodic Maintenance Works on Prithivi Highway (Chainage No. 90+670 to 107+320, 108+220 to 113+000 and 121+430 to 126+750) |
सडक डिभिजन, तनहुं |
Rs. 3,88,18,340 |
0.00% |
|
|
Roadway Improvement works on Bi.Na.Pa 14 Gadi barahatal ka.pa. atntargat kalyankadh Chhapree dobata Rekcha Danras Benighat sadak(0+000-9+720)km,Surkhet |
सडक डिभिजन, सुर्खेत |
Rs. 1,08,69,680 |
85.57% |
|
|
Periodic maintenance works on Sanfe-Mangalsen (CH: 5+500~7+000) and (CH: 16+000~39+000) Road Section, Achham |
हेभिईक्युपमेन्ट डिभिजन, वुटवल |
Rs. 4,73,94,542 |
86.00% |
|
|
Kanchaniya Kothi River along Rudrapur Bankashiya 5 Gadehi 4 Road |
सडक डिभिजन, वुटवल |
Rs. 3,31,93,577 |
0.00% |
|
|
Contruction of Rigid Pavement structures on Maure- Tripurakot Road, Dolpa (Package 2) |
डिभिजन सडक कार्यालय, चौरजहारी |
Rs. 87,14,707 |
0.00% |
|
|
Periodic Mainanatance Works on Chyamasing Nala Banepa ( 6+970 - 9+900 ) Road |
सडक डिभिजन, भक्तपुर |
Rs. 1,26,65,043 |
90.00% |
|
|
Construction of RCC Bridge with Pile Foundation in Aruwa Khola Bridge, Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 2,96,96,767 |
100.00% |
|
|
Sangrampur Jingadwa Dhankaul Sadak & Bramhapuri Padariya Sadak, Sarlahi |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 45,00,470 |
0.00% |