All Projects
Project |
Office |
Budget |
Progress |
Action |
|---|---|---|---|---|
|
Road Protection Work along Karnali Highway Hulma Bazaar to Gairigaun section (Ch 139+300 to 147+000), Kalikot |
सडक डिभिजन, वांके |
Rs. 7,47,85,714 |
7.47% |
|
|
Upgrading and Improvement of Padini Ga.Pa ward no. 8 Adguri Tinthapre Dhorpatan Saaldanda Chhatrabaas Arladi Chauwa Dhulapokhara Chhatradev Bahasura Road, Arghakhanchi |
सडक डिभिजन, कपिलवस्तु |
Rs. 71,76,161 |
0.00% |
|
|
Motorabel Seet Truss Bridge Over Seti river at Devsain, Bajhang |
सेती राजमार्ग (उत्तर खण्ड) चैनपुर ताक्लाकोट सडक योजना, बझाङ्ग |
Rs. 10,34,90,195 |
2.40% |
|
|
Recurrent Maintenance works along different section of Belaiya- Butwal road project |
सडक डिभिजन, वुटवल |
Rs. 42,17,779 |
100.00% |
|
|
Construction of Prestressed Girder Bridge over Sirsiya River (kashi Tiwari ) |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 2,49,95,427 |
0.00% |
|
|
Patch works at Khurkot-Nepalthok Section of Dhulikhel-Sindhuli-Bardibas Road (76+000-110+000) |
सूर्यविनायक-धुलिखेल, धुलिखेल-सिन्धुली-बर्दिवास सडक आयोजना, काठमाण्डौ |
Rs. 10,71,564 |
0.00% |
|
|
Recurrent Maintenance of Road Inventory Painting ,Road Marking and Shoulder |
डिभिजन सडक कार्यालय, चितवन |
Rs. 40,54,342 |
0.00% |
|
|
Road Safety Works along Kurintar- Damauli- Pokhara Section of Prithivi Highway |
योजना तथा अनुगमन महाशाखा (सडक सुरक्षा तथा ट्राफिक शाखा) |
Rs. 1,32,56,794 |
0.00% |
|
|
Road specific maintenance work along Ganaha-Chakchake-Khalanga Road and chakchake-Liwang Darbot Road in Pyuthan and Rolpa District. |
योजना तथा अनुगमन महाशाखा (योजना अनुगमन तथा मुल्यांकन शाखा) |
Rs. 78,57,530 |
87.08% |
|
|
Design & Build of Trishuli River Bridge, Bhimdhunga Lamidanda Road, Goganepani-1 & Kallari-2, Gharitar, Dhading |
पुल योजना, मध्य क्षेत्र सेक्टर नं. २, काठमाण्डौ |
Rs. 15,14,38,407 |
86.00% |
|
|
Earthwork in Roadway Excavation, Masonry Retaning Structures and Gabion Protection works on Diktel-Solu-Junbesi-Khahare-Jiri-Tamakoshi-Caharikot-Khadichaur Road |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 1,59,42,800 |
88.00% |
|
|
Design & Build of four bridges along Madan Bhandari Highway(Jhatare-Mechidangi Chowk Section) |
मदन भण्डारी राजमार्ग योजना कार्यालय, दमक |
Rs. 30,83,76,172 |
96.00% |
|
|
Periodic Maintenance Works on Simbhanjyang Palung ( CH 64+800 to 85+000 ) Section of TRP, Makwanpur |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 3,40,62,739 |
20.00% |
|
|
Construction of RCC Bridge over Bhujela Khola on Bhi.Na.Pa. 11,Matakutiya, Kanchanpur |
सडक डिभिजन, कञ्चनपुर |
Rs. 5,03,53,826 |
90.00% |
|
|
BBPCU-DB-072/073-013 Design and Build of Bagmati River Bridge Piprabazar Rautahat |
पुल योजना पूर्वी क्षेत्र सेक्टर नं. १, धरान, सुनसरी |
Rs. 76,34,60,000 |
89.00% |
|
|
Roadway Upgrading Works in Gokuleshwor-Dethala-Khar-Khalanga Road (Ch: 8+000 to 11+000 From Khalanga Side) |
सडक डिभिजन, बैतडी |
Rs. 95,47,990 |
0.00% |
|
|
Construction of RCC Bridge of span |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 4,69,85,593 |
0.00% |
|
|
Construction and Improvement of Malagiri Myalpokhari Duaneta Barbot Hulake Rangdal Chaphile Darling Road, Gulmi |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 26,78,495 |
0.00% |
|
|
Widening of Existing Road With Structural along Gola to Barun Section (74+000 to 78+770) |
Unknown |
Rs. 4,00,29,157 |
90.00% |
|
|
Constrution of RCC bridge over kothu khola |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 3,43,25,703 |
100.00% |
|
|
Construction of Pre-stressed RCC Bridge over Biring Khola (8 No*39.9 m Span, Total Length 319.2 m), along Bhadrapur - Jhapa bazaar Hulaki Road, Jhapa |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, सुनसरी |
Rs. 13,72,20,000 |
96.00% |
|
|
Recurrent Maintenance Works along Bhumahi Parasi Bhairahawa Road ( Dhakdahi-Bhairahawa & Sunauli Bypass Road). |
हेभिईक्युपमेन्ट डिभिजन, वांके |
Rs. 80,47,232 |
100.00% |
|
|
Construction of RCC Bridge for Bhaluwahi Khola, Saptari along Rajbiraj Kanchanpur Hulaki Road |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, सुनसरी |
Rs. 2,75,43,359 |
100.00% |
|
|
Construction of RCC Bridge at Jallad river,Deupura-Rupaitha-Bhuwarba road, Dhanusha |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 2,35,51,542 |
0.00% |
|
|
Earthwork, Graveling, Blacktop and Structure Works in Dhankaul 9 Harkathwa Mainathpur Sisaut Sadak, Sarlahi |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 4,85,46,128 |
0.00% |
|
|
Bitijor Khola Bridge protection works ( Khurkot- Ghurmi road) |
Puspalal (Midhill) Road Project, Kavrepalanchok |
Rs. 12,38,999 |
0.00% |
|
|
Contruction of Prestressed bridge over Aukashi River at Jaukh -Gonapura Road, Mahottari |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 7,66,71,356 |
88.00% |
|
|
Roadway Excavation works on chhinchu-chariban-kalche-salyan-dang roadSurkhet |
सडक डिभिजन, सुर्खेत |
Rs. 17,01,452 |
100.00% |
|
|
Road Improvement works, TRP, CH 25+000 - 32+000 |
डिभिजन सडक कार्यालय, चितवन |
Rs. 16,78,318 |
0.00% |
|
|
Road Upgrading works on Amgaaudada-Thulamadu Hudai Maachaa patihalla Sadak |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 32,76,450 |
86.73% |
|
|
Roadway excavation and improvement works along Hilsa-Simikot Road at Hepka Khola to Simikot Road section(83+700 to 95+000 km) |
हिल्सा सिमिकोट सडक योजना, हुम्ला |
Rs. 4,02,41,840 |
0.00% |
|
|
Construction of Jhangar Khola Bridge (RCC1X15m), Nuwakot |
गल्छी त्रिशुली मैलुङ्ग स्याफ्रुवेशी रसुवागढी सडक योजना, विदुर नुवाकोट |
Rs. 3,07,73,484 |
0.00% |
|
|
Road Construction including E/W, Roadside Structures, Cross Drainage Structure Works on Raniswara Bhalukhola Kafalswara Thapagoun Samari Road |
डिभिजन सडक कार्यालय, नुवाकोट |
Rs. 42,19,550 |
0.00% |
|
|
Recurrent maintenance works on Ridi-Tamghas section. |
सडक डिभिजन, पाल्पा |
Rs. 27,17,762 |
0.00% |
|
|
Roadway Excavation & Structural Works along Dovan-Taplejung-Olangchunggola-Tiptala(China Tibet Border) Road Sector |
उत्तर दक्षिण (मुलघाट दोभान ओलाङ्चुङगोला खण्ड) सडक योजना, ताप्लेजुङ्ग |
Rs. 35,48,42,325 |
85.61% |
|
|
Construction of RCC T-Girder bridge over Balwa Khola Bridge on Kharihani-Geruwahi-Bhatahi road,Dhanusha |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 3,43,20,593 |
84.00% |
|
|
Dolakha Singati Road Project |
आयोजना निर्देशनालय, ए.डि.वि., विशालनगर, काठमाण्डौ |
Rs. 63,89,88,885 |
99.00% |
|
|
Recurrent maintenance works along MRM Butwal- Kothi Section from CH 22+000 to 26+500 ( Saljhandi Bazar to Kothi Bridge ). |
हेभिईक्युपमेन्ट डिभिजन, काठमाण्डौ |
Rs. 49,06,150 |
100.00% |
|
|
Road Upgrading works along Holeri-Gwarkhola-Tulsipur Road (CH0+000 to 10+000) in Rolpa Distirct . |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 23,72,67,768 |
98.73% |
|
|
Routine(Reactive) maintenance of Jayaramghta – Halesi section , Khotang ( Ch 9+000 to 40 + 000, from hile pani) |
Puspalal (Midhill) Road Project, Kavrepalanchok |
Rs. 1,57,77,201 |
0.00% |