All Projects
Project |
Office |
Budget |
Progress |
Action |
---|---|---|---|---|
Construction of RCC Drain & Hume pipe Culvert along E/W Highway Lalgadh policechowki dachhin Premnagar Ramnagar Singyhi Dharmpur hundai Janakpur ramanandchowk sadak,Mahottari |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 47,28,129 |
0.00% |
|
Black Top works along ArunkholaTamaspurBaguwanDumkibasSadak, Nawalpur |
सडक डिभिजन, वुटवल |
Rs. 1,33,73,489 |
0.00% |
|
Construction RCC Bridge Over Handi Khola, Sindhupalchowk |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 8,15,07,402 |
94.00% |
|
Road Maintenance Works on Tamakoshi Milti Road |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 45,80,156 |
0.00% |
|
Specific Maintenance work at Khurkot-Dhulikhel Road Section |
सूर्यविनायक-धुलिखेल, धुलिखेल-सिन्धुली-बर्दिवास सडक आयोजना, काठमाण्डौ |
Rs. 43,48,200 |
0.00% |
|
Construction of Structural Works On Koshi Highway (Makhwa to Mulghat Section) |
डिभिजन सडक कार्यालय, धनकुटा |
Rs. 1,03,30,465 |
0.00% |
|
Road construction and Improvement works at Jhaite-Koralla (Ch. 19+000-44+000) |
कालिगण्डकी कोरिडोर (बेनी जोमसोम कोरोला सडक योजना), जोमसोम, मुस्ताङ |
Rs. 23,05,85,798 |
85.00% |
|
Upgrading of road with roadway excavation including Back cutting and grade cutting and Structural works in Tangli and Chukpani Bhir,Huti |
दार्चुला टिङकर सडक योजना, दार्चुला |
Rs. 80,84,669 |
0.00% |
|
Construction of RCC Bridge over Kataha Khola (1no*10 m Span, Total Length 10.50 m) along Rajbiraj-Balan, Hulaki Road, Saptari |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, सुनसरी |
Rs. 1,29,27,833 |
71.00% |
|
contraction of specific maintenance works on chheda-jajarkot Road section, (Ch 70+000 to 106+000) |
डिभिजन सडक कार्यालय, चौरजहारी |
Rs. 28,42,584 |
0.00% |
|
Construction of Sekhuwa Khola Bridge along Bhojpur-Diktel Section(RCC 1x15m), Khotang |
Puspalal (Midhill) Road Project, Kavrepalanchok |
Rs. 2,94,96,967 |
99.90% |
|
Construction of 15.0m Simply Supported, Cast-in-Situ, 2 Webbed Reinforced Slab-Deck Bridge Over Maseri Khola, Nuwakot |
डिभिजन सडक कार्यालय, नुवाकोट |
Rs. 3,80,77,297 |
0.00% |
|
D & B of kaligandaki River Bridge Ranimahal Palpa |
पुल योजना पश्चिम क्षेत्र सेक्टर नंः ४, पाल्पा |
Rs. 16,83,77,427 |
0.00% |
|
Roadway Excavation of Naridang chaurpati Payal Chitre Road Section |
डिभिजन सडक कार्यालय, साँफेवगर, अछाम |
Rs. 1,09,92,234 |
97.00% |
|
Road Upgrading Works on Thimi (Chardobato)-Balkot Chowk-Road, Bhaktapur |
सडक डिभिजन, भक्तपुर |
Rs. 59,93,673 |
100.00% |
|
Structural works on Barjugad-Dwari (CH. 31+420¬41+800) Road Section, Bajura |
डिभिजन सडक कार्यालय, साँफेवगर, अछाम |
Rs. 76,45,420 |
95.41% |
|
Construction Of RCC Multi Cell Box Bridge (2x10*x5) Between Khagade Sedi Tole and Rampurba |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 2,34,81,523 |
62.00% |
|
Construction of Slab Culvert at Sarnamati - Khalingchowk to 9km Jange Pillar Sima Sadak, Jhapa |
डिभिजन सडक कार्यालय, झापा |
Rs. 25,02,815 |
55.00% |
|
Widening, Grade improvemnet, Drainage, Soiling, Structural Works and Sub-base works from Dovan, Nayabasti-Barun Road Section(53+000 to 80+000) |
उत्तर दक्षिण, कोशी सडक योजना, संखुवासभा |
Rs. 57,45,18,352 |
100.00% |
|
Construction works of Benighat-Aarughat-Larkebhanjyang Road Ch.0+000 and Ch.10+000 |
गाेरखा सडक योजना, गोरखा |
Rs. 1,01,86,679 |
45.00% |
|
Construction of Side Drain in Gokuleshor-Khalanga Section of Satbajh Thaktoli Darchula Tinker Road(NH66) |
सडक डिभिजन, बैतडी |
Rs. 17,66,357 |
0.00% |
|
बालन कमला सडक सिरहा, HRP/3372244/074-075/UR-004 |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, जनकपुर, धनुषा |
Rs. 1,20,32,05,903 |
95.50% |
|
बबइ नदी पुल, दमदुवाली हागिदमार, सल्यान |
पुल योजना, पश्चिम क्षेत्र सेक्टर नं. ३, वांके |
Rs. 22,87,40,354 |
100.00% |
|
Design and Build of Bridge of Two Bridges . Babai Nadi Bridge, Goltakuri ko Baki ra Hekuli VDC ko Baibang bich ma |
पुल योजना, पश्चिम क्षेत्र सेक्टर नं. ३, वांके |
Rs. 22,26,84,955 |
98.00% |
|
Palungtar Baddada to Chhapabhanjayng,Karki gaun hudai Nursery section along Palungtar Harmi Chopharak Ghakhu Shreenathcoat Jaubhari Muchok Sichung Gachhok sadak,Gorkha |
गाेरखा सडक योजना, गोरखा |
Rs. 1,17,64,493 |
0.00% |
|
Construction of Bridge over Bagaha Khola along Rajhar Faram Barhakol Road |
सडक डिभिजन, वुटवल |
Rs. 3,15,01,640 |
100.00% |
|
Back cutting, Grade Cutting ,Curve improvement soling works& structural works along Barun Hatiya section (80+000-97+000) |
उत्तर दक्षिण, कोशी सडक योजना, संखुवासभा |
Rs. 4,11,06,400 |
0.00% |
|
Upgrading/Improvement of Chandrauta-Krishnanagar Road (Ch: 0+000 - 20+000) and Krishnanagar Urban Road (8.0 Km) |
भालुवाङ्ग-बाग्दुला-भिमगिठ्ठे चन्द्रौटा-कृष्णनगर, लमही-घोराही-तुलसीपुर सडक योजना, दाङ |
Rs. 80,54,01,461 |
96.22% |
|
11 kilo chhepetar Bhaluswara Barpak Sadak Gorkha 22+000 to 30+0000 |
गाेरखा सडक योजना, गोरखा |
Rs. 10,70,03,629 |
30.00% |
|
Khajura khola at Khairatahawa |
सडक डिभिजन, वुटवल |
Rs. 5,30,83,742 |
100.00% |
|
Roadway Excavation and Structures Works in Aerichaina Rithachaupata Sarmuli Ratamata kuni dhanthala Road |
सडक डिभिजन, बैतडी |
Rs. 2,36,25,996 |
99.97% |
|
Construction of double span simple RCC Bridge over chhepe river padabesi gorkha |
गाेरखा सडक योजना, गोरखा |
Rs. 6,04,43,408 |
0.00% |
|
MIDHLPD/3371384-075/076 |
Puspalal (Midhill) Road Project, Dailekh |
Rs. 36,02,38,446 |
84.00% |
|
Jitpur- Taulihawa- Khunuwa NH50 Road from Chainage 22+310 to Chainage 30+500, Kapilvastu |
योजना तथा अनुगमन महाशाखा (सडक सुरक्षा तथा ट्राफिक शाखा) |
Rs. 3,68,42,661 |
85.00% |
|
RCC Prestressed Bridge Over Sera (ghatte Khola ) Charikot Sera Shailung Road |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 5,41,63,740 |
0.00% |
|
Recurrent Maintenance Works on Chinchu Jajarkot Road Section (Ch0+000-5+000)& Ratna Rajmarga (Ch68+700-106+500) |
सडक डिभिजन, सुर्खेत |
Rs. 57,55,000 |
196.30% |
|
Roadway Excavation,track opening, road widening,Construction of Culverts and Retaining Structures in Damak Chisapani Roads |
डिभिजन सडक कार्यालय, झापा |
Rs. 10,24,57,471 |
100.00% |
|
RCC Pavement Works at various chainage of Dhulikhel - Nepalthok Road Section |
सूर्यविनायक-धुलिखेल, धुलिखेल-सिन्धुली-बर्दिवास सडक आयोजना, काठमाण्डौ |
Rs. 54,94,590 |
0.00% |
|
Upgrading works of Jamune Kaseri Khare Chessa Gaurishankar Ga.Pa Chakrath |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 58,64,300 |
97.00% |
|
Construction of PSC Bridge over Dhogahi River along Bawaratara-Bishrampur Road, Parsa |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 7,37,71,204 |
0.00% |