All Projects
Project |
Office |
Budget |
Progress |
Action |
|---|---|---|---|---|
|
Construction of RCC Bridge over Budhi Khola, Morang-Sunsari |
व्यापारिक मार्ग विस्तार आयोजना (रानी-बिराटनगर-इटहरी-धरान मार्ग), सुनसरी |
Rs. 20,51,23,712 |
0.00% |
|
|
Road Side Maintenance Works (Road Side Drain Maintenance Works) along Nagma-Jumla Khalanga Section, Jumla |
योजना तथा अनुगमन महाशाखा (भूवातावरण तथा सामाजिक शाखा) |
Rs. 53,68,064 |
32.33% |
|
|
Pavement Construction work along Panchmukhi chauk Dekhi Dakchhin Mangalbare Hatiya samm Blacktopped, Biratnagar-12, Morang, Pavement Construction work along Janshyog marga Blacktopped, Biratnagar 11, Moranga And Pavement Construction work along aman nagar marga Blacktopped, Biratnagar -6, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 85,61,061 |
104.85% |
|
|
घोराही सिमेण्ट उद्योग सडक |
सडक डिभिजन, दाङ्ग |
Rs. 6,54,30,429 |
0.00% |
|
|
Rehabilitation and Reconstruction ( Rigid Pavement ) works on Surkhet- Jumla Road, Dailekh ( Ch 100+000-132+000) |
सडक डिभिजन, सुर्खेत |
Rs. 98,38,422 |
32.18% |
|
|
Construction of Marpha and Chussang Khola Bridge. |
योजना तथा अनुगमन महाशाखा (भूवातावरण तथा सामाजिक शाखा) |
Rs. 18,96,91,650 |
58.00% |
|
|
Road Construction and Upgrading Works on Mirdi Jagat Bhanjyang Kyakmi Bhimad Road, Syangja( Ch 0+000-7+000) |
सडक डिभिजन, पोखरा |
Rs. 12,26,23,085 |
0.00% |
|
|
Specific Maintenande works on Sanfe-Rakse-Martadi Road Section |
सुदुरपच्चिमाञ्चल क्षेत्रिय सडक निर्देशनालय, डोटी |
Rs. 60,13,806 |
32.00% |
|
|
Road infrastructure development Works on Tarukaghat-Kaule-dhading-Nilkantha Road |
डिभिजन सडक कार्यालय, नुवाकोट |
Rs. 46,24,685 |
0.00% |
|
|
Road Maintenance Works On Araniko Highway ( Chalnedhunga -Khawa - Lamidanda -Dolalghat) |
सडक डिभिजन, भक्तपुर |
Rs. 3,23,29,960 |
0.00% |
|
|
Construction and Improvement of Patauti Kharjyang Ghumti Gaudakot Majhuwa Shantipur Road |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 1,36,07,072 |
0.00% |
|
|
Rehabilitation and upgrading of road along Khalanga-chunjathati-sandhikharka Road in Pyuthan District |
पच्चिमाञ्चल क्षेत्रिय सडक निर्देशनालय, पोखरा |
Rs. 76,35,762 |
31.85% |
|
|
Reactive maintenance Works (Pavement and Shoulder Maintenance) Gahana-Chakchake-Liwang -Darbot & Chakchake-Khalanga- Road in Rolpa & Pyuthan District. |
योजना तथा अनुगमन महाशाखा (सडक सुरक्षा तथा ट्राफिक शाखा) |
Rs. 1,48,78,892 |
45.00% |
|
|
Road Upgrading works on Ranikuwa Thulakhet Road, Lamjung |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 36,29,704 |
35.00% |
|
|
Morang Chhetra no.2 Sunbarshi na.pa. Amardah chowk bat Birdoliya hudai Kechna Bazar samma Niskane sadak Blacktop karib 9 km, Morang and Belchauk Dohmana Bazar Darvesa Ratuwamai 6 Mangalbare Bazar sadak, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 60,73,925 |
31.68% |
|
|
Road Construction works at Pushpalal Marga-Chaute-Banjhe-Jhule-Jiri Road, Dolakha |
मध्यमाञ्चल क्षेत्रिय सडक निर्देशनालय, काठमाण्डौ |
Rs. 52,22,742 |
29.00% |
|
|
Blacktop Works along Bardibas Ma Ra Ma bata Nepali Sena Camp Jane Sadak, Bardibas |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 16,84,750 |
0.00% |
|
|
Road Upgrading works along Bansbari-Healthpost-Wada Karyalaya, Gundu-7 |
सडक डिभिजन, भक्तपुर |
Rs. 17,97,716 |
0.00% |
|
|
Mustang Kagbeni-Dolpa Sadak, Mustang |
Road Division, Baglung |
Rs. 37,87,800 |
35.00% |
|
|
Structural Works and Cross Drainage Works on Hongshi - Shivam Cement Quarry Site Access Road, Palpa |
सडक डिभिजन, पाल्पा |
Rs. 2,77,66,383 |
0.00% |
|
|
Slope Stabilization and Road Upgrading |
सडक डिभिजन, बैतडी |
Rs. 4,51,55,224 |
0.00% |
|
|
Construction Of PSC 2-webbed RCC Bridge Over Jalad River Along Bakchauda Katarait Dakshinbari Tole Sadak, Dhanusha |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 9,69,15,683 |
65.00% |
|
|
Road Upgrading woks of Dhawa Koyabhanjayang Bhimsen Thapa 4 Ra 2 Jodne Sadak with Gravelling and Rigid Pavement |
गाेरखा सडक योजना, गोरखा |
Rs. 70,73,344 |
32.00% |
|
|
Gourahadaha Baigundhura Korobari Road, Jhapa |
डिभिजन सडक कार्यालय, झापा |
Rs. 7,56,14,099 |
49.00% |
|
|
Road Upgrading works along langadi Kamal Singh Chaudhary ko Ghar Dekhi Ganeshman Chaudhary ko Ghar Samma Road in Dang District. |
सडक डिभिजन, दाङ्ग |
Rs. 26,19,889 |
30.00% |
|
|
(Rehabilitation works on Betrawoti Dhunche section of Betrawoti Syprubesi Road (Package-1).) |
हेभिईक्युपमेन्ट डिभिजन, वांके |
Rs. 1,39,34,385 |
33.00% |
|
|
Upgrading Of Kharendrapur-Shitalpur-Vilmi Road ( CH: 0+000-17+000), Kapilvastu |
हुलाकी राजमार्ग योजना कार्यालय, कपिलवस्तु |
Rs. 68,56,65,982 |
40.00% |
|
|
Construction of Blacktopped road Including Drainage Structures along Gramthan Ga.Pa-1 Dekhi milanchowk Hudai lakhantari, Gidhaniya, Dhobiyare hudai Haraincha sam, morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 3,85,72,568 |
38.16% |
|
|
Pavement Works along Dewangunj Sahebgunj Ittabhata Hanuman Mandir Sadak Harinagara ga.pa, Sunsari |
यान्त्रिक कार्यालय, भक्तपुर |
Rs. 30,48,550 |
31.17% |
|
|
Upgrading of Bharatpur-Madi-Thori (Hulaki)Sadak(Debendrapur dekhi-Bagai Bus Park section)Chitwan |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, वीरगंज, पर्सा |
Rs. 33,91,66,137 |
32.00% |
|
|
Construction of road protecting & side Drain Works along Chaurikhola-Lubhughat Bazaar section(ch 78+117-97+020), Ramechaap |
Puspalal (Midhill) Road Project, Kavrepalanchok |
Rs. 3,33,25,535 |
30.96% |
|
|
Rehabilitaion Reconstruction works on Surkhet- Jumla Road , Dailekh( ch 100+000-132+000) |
सडक डिभिजन, सुर्खेत |
Rs. 1,35,34,161 |
31.00% |
|
|
Road Upgrading works at Fulabri Byasi NEC Sadak, Bhaktapur |
सडक डिभिजन, भक्तपुर |
Rs. 52,12,467 |
35.00% |
|
|
Construction of RCC Bridge Works over Lamaha Khola Bridge (2x25m) along Balchanpur Jungalsahiya Road, Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 6,58,43,802 |
33.00% |
|
|
Roadway Excavation, Construction of Retaining structures on Marim -Tinje- Dho -Dunai Road, Dolpa |
डिभिजन सडक कार्यालय, चौरजहारी |
Rs. 4,89,99,920 |
0.00% |
|
|
Road Improvement works of Panchkhal Palanchok Road (Ch.0+000 to ch.10+000) |
सडक डिभिजन, भक्तपुर |
Rs. 1,29,32,340 |
35.00% |
|
|
Reactive Maintenance of Road Surface in Anarkholi-Khodpe-Patan-Satbajh-Jhulaghaat Section of Pushpalal (Mid Hill) Highway (NH03) |
सडक डिभिजन, बैतडी |
Rs. 34,44,600 |
0.00% |
|
|
Pavement Works including Cross drainage and Retaining Structures along Morang District Sunbarsi Na Pa Sikti dekhi Pathari Sanibare 5,6 Sadak, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 12,09,55,503 |
30.78% |
|
|
Upgrading of Existing Earthen road to blacktop standard along Bardibas Na.pa.06 Susling Tole Dekhi Dakshin Premnagar Hudai Ramnagar-Birta Sitapur Rajpur Tikuliya Mahuwa Hudai Bhimgarh Parikrma jodane sadak. |
सडक डिभिजन, पाल्पा |
Rs. 10,60,35,739 |
30.50% |
|
|
Prestressed RCC Bridge Construction Works along Duisota Gidhaniya Khola in Dang District |
सडक डिभिजन, दाङ्ग |
Rs. 5,92,37,963 |
0.00% |