All Projects
Project |
Office |
Budget |
Progress |
Action |
|---|---|---|---|---|
|
Construction of Black Topped Road including Gabion Works along Hulaki Rajmarga dekhi Jhungi Tole Janata Ma.Bi -Sombare Chowk Dhanpatti Bharatiya Sima Sadak, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 1,07,67,267 |
33.47% |
|
|
Improvement of Masuriya-Hasuliya Road,Kailali (0+000 To 1+300 From Surminala Bridge Hulaki Sadak) |
सडक डिभिजन, कञ्चनपुर |
Rs. 88,88,181 |
40.00% |
|
|
Rehabilitation and upgrading of Road works along chackchake-Liwang-Darbot (Jimurpata to Bhingri) Road in Pyuthan |
सडक डिभिजन, तनहुं |
Rs. 15,10,645 |
33.45% |
|
|
Road Upgrading Works on Molpha hudai Chuli Mandir Samma paryatak Sadak nirman Khadachakra-6, kalikot |
डिभिजन सडक कार्यालय, धनकुटा |
Rs. 44,35,750 |
33.43% |
|
|
Design &Build of Kamalamai Na pa .10 Dovan ma parne Chadaha Kholama pul:Sindhuli |
पुल योजना, मध्य क्षेत्र सेक्टर नं. २, काठमाण्डौ |
Rs. 11,49,12,920 |
34.00% |
|
|
DILLIAY DILLAY DEKHI BAJHGAUN ROAD BAJHANG |
सेती राजमार्ग (उत्तर खण्ड) चैनपुर ताक्लाकोट सडक योजना, बझाङ्ग |
Rs. 60,09,618 |
0.00% |
|
|
Recurrent Maintenance works at Charikot-Tamakoshi-Jiri Road NH-23, Tamakoshi-Milti Road NH-28 and Charikot-Dolakha-Singati Road NH-28, Dolakha |
सडक विभाग, काठमाण्डौ |
Rs. 55,87,135 |
56.00% |
|
|
Prestressed RCC Bridge Construction Works over Patre Khola along Lamahi-Tulsipur Road in Dang District |
सडक डिभिजन, दाङ्ग |
Rs. 3,80,65,441 |
0.00% |
|
|
Periodic Maintenance (Surface Dressing,SBSD) works on siddhicharan Rajmarg |
डिभिजन सडक कार्यालय, हर्कपुर, ओखलढुङगा |
Rs. 12,19,49,914 |
70.00% |
|
|
Road Upgrading and Rehabilitation of Biblyate-Maipokhari-Sandakpur Road |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 4,26,51,938 |
0.00% |
|
|
Construction of motorable Steel Truss Bridge over Marsyandi River along Chame-Manang Road |
सडक डिभिजन, तनहुं |
Rs. 9,00,79,324 |
35.00% |
|
|
Construction of Daram Khola Moterable Bridge Connecting Malma 3 & Kandabas 3, Baglung |
Road Division, Baglung |
Rs. 5,46,46,209 |
35.00% |
|
|
कुपिण्डे दह वरिपरि सडक र जयतपानी पाखापानी दारिमेचौर संग्रही मदनपोखरा सडक र देवस्थल सल्लीबजार सहरी सडक |
सडक डिभिजन, दाङ्ग |
Rs. 10,29,093 |
0.00% |
|
|
Road Upgrading and Rehabilitation of Mechi Highway along Kabeli Sukera Section |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 4,28,85,950 |
0.00% |
|
|
Beni Darbang Takam ,Muna,Jaljala to Rukum sadhak, Myagdi |
Road Division, Baglung |
Rs. 91,27,165 |
35.00% |
|
|
Improvement of Parasan India Border- Tribhuwanbasti- Vakunda-Chandev- Naya Basti Road, Kanchanpur |
सडक डिभिजन, कञ्चनपुर |
Rs. 47,16,192 |
100.00% |
|
|
: Roadway Excavation and Structure Work along Bhattadi-Thinke Section (ch 13+000 to 23+600, 2nd pck.)Kalikot of Surkhet -Dailekh Bazaar -Mahabulek-Galje -Bhattadi -Ratada-Nagma -Gamgadhi-Nakchalagna Road |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 3,71,73,180 |
18.00% |
|
|
Upgrading of Kathawa-Triveni Road, Nawalparasi |
हुलाकी राजमार्ग योजना कार्यालय, कपिलवस्तु |
Rs. 24,09,78,525 |
40.00% |
|
|
Construction of Cast-in-situ 2-webbed Prestressed Concrete slab-deck Bridge with pile foundation over Budhi khola Bridge,Taltalaiya ra Morang Dularima parne Hasina simsar jane bato,Sunsari |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 16,49,27,014 |
0.00% |
|
|
D & B of kaligandaki Bridge,Gadgadighat,Tanahun |
पुल योजना पश्चिम क्षेत्र सेक्टर नंः ४, पाल्पा |
Rs. 23,74,21,620 |
0.00% |
|
|
Emergency maintenance works at Dolakha- Singati road NH-28, Dolakha |
यान्त्रिक कार्यालय, सिराहा |
Rs. 36,20,218 |
29.00% |
|
|
Upgrading of Dhangadhi Campus Chouk Katani Khola Road (CH: 19+000-31+000), Kailali |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, धनगढी, कैलाली |
Rs. 24,65,15,477 |
28.88% |
|
|
MIDHLPD/337011144/076/77 |
Puspalal (Midhill) Road Project, Dailekh |
Rs. 40,00,04,036 |
35.00% |
|
|
Construction of PSC bridge over Jhimruk river along Jhiwang Dhuiwang Raspurkot Road, Pyuthan |
Road Division, Pyuthaan |
Rs. 10,83,71,481 |
0.00% |
|
|
Periodic Maintenance of Sunwal-Parasi Maheshpur (KM 0.000 to KM 18.950 of F009_01,_02, Belhaiya-Siddharthanagar, Butwal Mun. Boundary Rajmarga Chauraha( KM 0.750 to KM 4.800, KM 22.110 to KM 24.04 |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 17,84,66,015 |
34.00% |
|
|
-Construction of RCC Drain work along Mithileshwor mauwahi ward no 1 ko highway ko Pratikshalay dekhi purano Bazar hudai purandaha samma sadak, dhanusha . |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 48,01,881 |
0.00% |
|
|
Reacative Maintenance along Loharpati to Dhanushadham Matahi section along Janakpur Parikarma Road Dhanusha |
Unknown |
Rs. 41,64,892 |
33.00% |
|
|
Construction of Myagdi khola Motorable pakki Bridge at Arman-6, Mashanghat ( 2* 40 m) |
Road Division, Baglung |
Rs. 9,94,76,241 |
35.00% |
|
|
Construction Of Bureni River Bridge (1*25m) along Baddichaur-Gutu-Karnali Section of Madan Bhandari Highway, Surkhet.MBHPD/337011084/078/79-05 |
मदन भण्डारी राजमार्ग योजना कार्यालय, सुर्खेत |
Rs. 3,16,44,419 |
33.00% |
|
|
Blacktopped Road Construction Works including Drainage Structures along Laxminiya - Sohal Jahada 4-Rajbansi tole hudai-Kadmaha hudai-Nocha sima Sdak Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 59,46,413 |
0.00% |
|
|
Construction of RCC Bridges along Surkhet-Jumla Road over Cheddna Bridge & Sinja Khola Bridge,RSDPAFII-DOR-W-BNC-NCB-03 |
सडक डिभिजन, सुर्खेत |
Rs. 10,00,89,427 |
32.71% |
|
|
Construction of Drain Works along Dhansar Katahariya Karkach Sadak, Rautahat at Jangalsahiya and Gonahi Section |
यान्त्रिक कार्यालय, झापा |
Rs. 78,62,470 |
35.00% |
|
|
Structure works for Road Upgrading and Rehabilitation Works along Manma - Nagma Road (Karnali Highway) ( Ch 155+000-205+000) |
डिभिजन सडक कार्यालय, जुम्ला |
Rs. 1,05,64,028 |
0.00% |
|
|
Upgrading of Road to Gravel Standard with Roadway Excavation,Structural and Drainage Works in Mahakali Corridor [CH:215+500 to CH: 218+000], Shakti Rojina JV |
योजना तथा अनुगमन महाशाखा (सडक सुरक्षा तथा ट्राफिक शाखा) |
Rs. 5,56,20,298 |
32.55% |
|
|
Road Improvement works along Baudhimai Na.Pa.-2 Inarwa Bazar dekhi bakaiya Bandh Samma, Aruwa khola dekhi Sitalpur math samm ra Sitalpur pahini dekhi Mewa Gaun Samm Sadak, Rautahat |
सडक डिभिजन, भक्तपुर |
Rs. 51,60,938 |
35.00% |
|
|
Roadway Improvement works ( ch.14+000 to 24+000) Lashi to syalagadi gaun section of jumla bazar -syalagadi gaun- chotra -Dolpa Sadak |
डिभिजन सडक कार्यालय, जुम्ला |
Rs. 71,99,564 |
0.00% |
|
|
Design and Build of Bridge over Rapti River, Connecting Badidamar and Shantipur, Dang/ Arghakhanchi |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 13,10,76,000 |
35.00% |
|
|
Improvement of Pchchisghar Foolbari -Gadariya- Rajipur Road (1+010 To 1+382 ) |
सडक डिभिजन, कञ्चनपुर |
Rs. 70,66,384 |
100.00% |
|
|
Blacktopped Road Construction Works including Drainage Structures along Puspla Lal Gachhiya Sadak Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 60,50,051 |
32.00% |
|
|
Road Construction works at Sindupalchok Dulasawara- puchartol-8 Kilo road, Sindhupalchowk |
यान्त्रिक कार्यालय, पोखरा |
Rs. 38,06,302 |
28.00% |