Project |
Office |
Budget |
Progress |
Action |
|---|---|---|---|---|
|
Recurrent Maintenance Work ( Supply of Emulsion, Chips and Base upto kuddu Jajarkot) on Chedda - Jajarkot Section |
डिभिजन सडक कार्यालय, चौरजहारी |
Rs. 19,59,180 |
0.00% |
|
|
Construction of motorable bridge |
Puspalal (Midhill) Road Project, Panchthar |
Rs. 3,46,91,618 |
0.00% |
|
|
मिर्चैया कटारी घुर्मी सडक (मिर्चैया कटारी खण्ड) |
डिभिजन सडक कार्यालय, सिराहा |
Rs. 2,12,59,950 |
0.00% |
|
|
Construction of Amaune Khola Bridge (RCC 1*15m),Mansire Khola Bridge (RCC 1*15m) & Sisne Khola Bridge (RCC 1*15m) along Bahunepati Dolalghat section of Midhill Highway, Sindhupalchok |
Puspalal (Midhill) Road Project, Kavrepalanchok |
Rs. 7,85,77,264 |
0.00% |
|
|
Maintenance of Road along Dhodhari -Rajapur-Sati approach Road,Bardiya |
सडक डिभिजन, कञ्चनपुर |
Rs. 40,24,540 |
35.00% |
|
|
नयाँबाटो/गौचन जे.भि. |
उत्तर दक्षिण (कालिगण्डकी करिडोर) लोकमार्ग योजना, पाल्पा |
Rs. 5,19,82,050 |
45.00% |
|
|
Construction of RCC Bridge over Dhoda Nadi Bridge Kaj Bhakunda Road, Kanchanpur |
सडक डिभिजन, कञ्चनपुर |
Rs. 23,64,50,089 |
75.00% |
|
|
Upgrading of Lamki- Tikapur- Khakraula Road (CH: 8+000-18+000), Kailali |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, धनगढी, कैलाली |
Rs. 36,27,51,931 |
40.04% |
|
|
Road Improvement Works along Chanki Karmaiya Road, Sarlahi |
उत्तर दक्षिण, ताप्लेजुङ ओलाङगोला खण्ड योजना, ताप्लेजुङ |
Rs. 12,10,81,609 |
36.00% |
|
|
Reactive Maintenance works along Leguwaghat-Bhojpur Seciton |
डिभिजन सडक कार्यालय, तुम्लीङटार, संखुवासभा |
Rs. 50,64,050 |
0.00% |
|
|
Recurrent Maintenance Works on Siddhartha Highway (Jhumsa - Bartung Section), Palpa |
सडक डिभिजन, पाल्पा |
Rs. 13,46,778 |
40.00% |
|
|
Rehabilitation Works on Batase Danda Harthok-Jorte,Palpa |
पच्चिमाञ्चल क्षेत्रिय सडक निर्देशनालय, पोखरा |
Rs. 5,47,37,651 |
50.00% |
|
|
Road improvement to blacktop standard with necessary structural work |
Puspalal (Midhill) Road Project, Panchthar |
Rs. 29,83,24,537 |
0.00% |
|
|
Construction of RCC Bridge over Pannesi Khola along Bardibas Sindhuli Section of BP Highway |
सूर्यविनायक-धुलिखेल, धुलिखेल-सिन्धुली-बर्दिवास सडक आयोजना, काठमाण्डौ |
Rs. 4,03,39,335 |
38.00% |
|
|
Construction of Drain and Cross drainage Structural Works on Mechi Bridge-Bhadrapur Jhapa chowk-Rajgadh Road Jhapa (0+000 to 20+300) |
Unknown |
Rs. 5,23,46,757 |
35.00% |
|
|
Construction Of Retaining Structure and Drain Works along on Hulaki Sadak Dekhi Daschin Katahari ga.pa.Aadarsha Nagar hudai Jahada wada no.3 ko Ram Janaki Aadharbhut Bidyalaya sadak, Morang and Katahari 1 Maheshpur Jamtoki Babiya Birta sadak, Morang |
उत्तर दक्षिण, कोशी सडक योजना, संखुवासभा |
Rs. 16,63,135 |
34.00% |
|
|
Construction of Blacktopped Works including structures on Shivasattasi Municipality-2 Mangalbare Bazar Puba Chhetrya Sadak Pragati Chowk Bikash Chowk Baal Sewa Himal Sarsati Pvt.Ltd. Haldaar Chowk Purba Shivgunj Bazar Dharahara Chowk Dakchhin Ilaka Prahari Karyalaya Chakrapath Road Section, Jhapa |
सडक डिभिजन, पोखरा |
Rs. 13,96,20,442 |
35.00% |
|
|
Road Improvement to Blacktop Standard with necessary structural works at Bhojpur Diktel Sector Ch.42+000-52+000 |
Puspalal (Midhill) Road Project, Kavrepalanchok |
Rs. 24,85,30,360 |
0.00% |
|
|
Recurrent Maintenance Works on Narayanghat Mugling Road (0+000 to 36+000), Aaptari-Devghat (0+000 to 4+500), Prithvi Rajmarga (Mugling Bridge �Mauwa Khola Section CH 90+140 to 106+820) |
डिभिजन सडक कार्यालय, चितवन |
Rs. 41,89,428 |
0.00% |
|
|
Road Improvement Works on Kafaldanda waling gairahasur Mandir Road,Syangja |
Unknown |
Rs. 1,40,29,007 |
34.00% |
|
|
Roadway Excavation, Structural, Cross Drainage and pavement works on Tansen - Barangdi - Khanigaun - Dailatung - Tanglehawa Road [Deurali-Dailatung Section], Palpa |
सडक डिभिजन, पाल्पा |
Rs. 1,38,34,535 |
0.00% |
|
|
Construction of Ward no-1 & 2 Jodne Khola Bridge, Om Shanti Tole |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, धनगढी, कैलाली |
Rs. 3,62,21,876 |
35.00% |
|
|
Construction of Pre-stressed Bridge over Manpang Khola, Dhading |
डिभिजन सडक कार्यालय, चितवन |
Rs. 5,47,02,601 |
0.00% |
|
|
Road Construction work along Ramdhuni Baithar Kutipur Barahachettra Aitabare Chakraghati Sadak, Sunsari |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 62,94,311 |
33.00% |
|
|
Roadway Excavation,Gravelling & Structural works on Holesung, Janakraj Marga, Khotang |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 68,75,567 |
35.00% |
|
|
Construction of Bonga Dobhan Motorable Bridge, Baglung District (1*20m) |
हेभिईक्युपमेन्ट डिभिजन, वांके |
Rs. 2,40,07,048 |
35.00% |
|
|
Thalaha Khola Bridge Construction work Sattarjhoda 7 and 9, sunsari |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 4,29,19,272 |
34.00% |
|
|
Construction of Rigid Pavement of Road around Hariharbhawan Lalitpur |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 26,68,739 |
0.00% |
|
|
Roadway Improvement and Rehabilitation Works along Surkhet-Jumla Road(Ch 123+000-132+000) |
ओखलढुङगा हिलेपानी दिक्ततेल सडक योजना,ओखलढुङगा |
Rs. 2,84,64,860 |
34.00% |
|
|
Upgrading of Road to blacktop standard with Roadway Excavation, Structural and Drainage Works in Saleti-Uku-Joljibi-Bet Section of Mahakali Corridor (CH: 257+000 to CH:269+318) Rajendra Nirman Sewa Pvt.ltd (MCRP/33701103/078/79-07 |
दार्चुला टिङकर सडक योजना, दार्चुला |
Rs. 43,45,25,408 |
34.01% |
|
|
Improvement of Gauriganga 4, Khuttikatan-Khurkhurya Road, Kailali |
सडक डिभिजन, कञ्चनपुर |
Rs. 19,81,084 |
40.00% |
|
|
Patch Works and RCC Pavement Works at Banepa Sindhuli Bardibas Road |
सूर्यविनायक-धुलिखेल, धुलिखेल-सिन्धुली-बर्दिवास सडक आयोजना, काठमाण्डौ |
Rs. 98,44,750 |
0.00% |
|
|
Rehabilitation Works of Post Monsoon Damaged Section on Surkhet Dahikhola Section of Karnali Highway(Chainage:75+000 to 115+000) |
हेभिईक्युपमेन्ट डिभिजन, काठमाण्डौ |
Rs. 3,26,16,237 |
33.76% |
|
|
Construction of drain and asphalt concreate for service road work |
काठमाडौं चक्रपथ सुधार योजना, ललितपुर |
Rs. 2,47,17,476 |
0.00% |
|
|
Steel Truss Bridge over the Seti River at rayal ,Bajhang |
सेती राजमार्ग (उत्तर खण्ड) चैनपुर ताक्लाकोट सडक योजना, बझाङ्ग |
Rs. 15,48,90,730 |
29.59% |
|
|
Landslide Protection and Subsurface Drainage Works on Gorkha Ghyampesal Road (Ch 9+800) NH44 |
सडक डिभिजन, प्युठान |
Rs. 3,05,68,051 |
40.00% |
|
|
Pedestrian Overhead Bridge at Thimi, Chardobato, KathmanduSuryabinayak Road, Bhaktapur District |
सूर्यविनायक-धुलिखेल, धुलिखेल-सिन्धुली-बर्दिवास सडक आयोजना, काठमाण्डौ |
Rs. 3,10,23,494 |
0.00% |
|
|
Recurrent Maintenace work along "Mawa Haraincha mod and Itahari Gachiya Section "&" Urlabari-Aambari Road Section " & "Itahari to Koshi Barrage Road Section " & "Koshi Rajmarga, Dharan to Bhedetar Road Section " & " Duhabi - Inaruwa Road Section " & " Jhumka to Chatara Road Section" |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 2,72,15,914 |
40.00% |
|
|
Roadway Excavation (Rock Cutting) and Construction of Road Structures from Chainage 307+400 to 309+200 of Mahakali Corridor, Darchula |
सडक विभाग, काठमाण्डौ |
Rs. 3,54,23,179 |
33.47% |
|
|
Upgrading of Bahuliya- Phulbari- Bhojpur Road (Km 0+000 to 5+500), Kailali |
सडक डिभिजन, कञ्चनपुर |
Rs. 6,06,32,826 |
100.00% |