All Projects
Project |
Office |
Budget |
Progress |
Action |
---|---|---|---|---|
Roadway Excavation,Earthwork, Plum Wall and R.C.C.Pavement Works e.t.c. along Bukeni-Manakamana-Dihidada-Gaidaphat-Simswara-Bodechaur Sadak,Baglung |
Road Division, Baglung |
Rs. 21,46,852 |
4.00% |
|
Design and Build of Bridges over Hewa Khola, Loripa Khola, Lakhuwa Khola, Nawa Khola, Ganesh Chowk-Mulghat Road, Tamor Corridor Dhankuta/Panchthar |
डिभिजन सडक कार्यालय, नुवाकोट |
Rs. 32,44,28,000 |
10.00% |
|
Dil Bdr Marg Amlehan Tinpiple Arukharka Damkada Aryabhanjynag Road,Palpa |
Unknown |
Rs. 22,63,28,442 |
10.00% |
|
Roadway Excavation, Construction of Drain and Structure, Hume Pipe Culverts upto Blacktop standard along Kamalamai Na. Pa. Ring Road, Sindhuli |
डिभिजन सडक कार्यालय, खुर्कोट |
Rs. 17,10,96,586 |
5.00% |
|
Periodic Maintenance (Resealing) Works on Aanbu Khaireni -Munglin Section of Prithvi Highway and Byas Marga (Damauli-Jyamiretar-Neupanibesi section) |
सडक डिभिजन, तनहुं |
Rs. 5,90,50,699 |
0.00% |
|
Bhatkanda Badal Rel Uchhakot Road, Dadeldhura |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 8,47,48,182 |
4.00% |
|
Construction Road Track Open, Cross Drainage and Retaining Structure works of Arun Corridor Road (27+000 to 52+000) |
योजना तथा अनुगमन महाशाखा (HMIS तथा ICT शाखा) |
Rs. 44,68,96,451 |
3.00% |
|
Asphalt Concrete Works on TRP Tistung - Damechaur Section (CH43+000 to 56+000) of Makwanpur |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 6,66,04,888 |
10.00% |
|
Design & Build of Bridges over Budhi Ganga Bridge, Triveni Na. Pa & Gadkhet Baulikhola Bridge, Bajura |
सडक डिभिजन, कपिलवस्तु |
Rs. 14,16,62,000 |
10.00% |
|
Design & Build of Karnali River Bridge Wai-Badhu, Bajura, ठेक्का नम्बर BBPCU-DB-337011224-077/78-02 |
सडक विभाग, काठमाण्डौ |
Rs. 11,00,20,000 |
10.00% |
|
Upgrading I Improvement works of Jomsom Kagbeni Road (ch 0+000 to 13+000) way to Kagbeni Pindadaan,Mustang |
सडक विभाग, काठमाण्डौ |
Rs. 24,90,41,673 |
3.00% |
|
Design and Build of Kamala River Bridge, Kanchanban - Janaki Medical - Mithileswor Sabaila, NH 29, Siraha |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 97,39,60,000 |
3.00% |
|
Upgrading of Remaining part of Manmat-Kalaiya-Matirarwa Road, Bara(Kalaiya Bazaar, Sheetalpur and Matiarwa Section) |
योजना तथा अनुगमन महाशाखा (सडक सुरक्षा तथा ट्राफिक शाखा) |
Rs. 19,30,85,238 |
3.00% |
|
Rigid Pavement Works along Khanikhola- Toplang Road, CH 0+700 to 4+000, Dhading |
डिभिजन सडक कार्यालय, चितवन |
Rs. 1,23,62,561 |
0.00% |
|
Rehabilitation Work of Blacktop Road (Premix Overlaying and Rehabilitation Work) -3rd Package in Karnali Highway Road, (Balighat-Nagma Section) ch 185+000 to 195+000, Kalikot ( RDJML/337310113/077/78-21) |
डिभिजन सडक कार्यालय, जुम्ला |
Rs. 2,79,77,500 |
0.00% |
|
Design and Build of Banshilaghat Bridge, Udaypur-Khotang District |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 16,77,80,000 |
2.00% |
|
Upgrading to Blacktop Road Standard of Sukepokhari-Chhatedunga-Ewa-Hyaku-Chokpur-Dungesanghu Road, Niguradin-Hangpang Section (Chainage 8+420 to 16+420 Km) |
उत्तर दक्षिण (मुलघाट दोभान ओलाङ्चुङगोला खण्ड) सडक योजना, ताप्लेजुङ्ग |
Rs. 32,46,15,595 |
0.00% |
|
Construction Road Track Open, Cross Drainage and Retaining Structure works of Arun Corridor Road |
योजना तथा अनुगमन महाशाखा (भूवातावरण तथा सामाजिक शाखा) |
Rs. 7,24,88,051 |
2.00% |
|
Slope Stabilization and Protection for Road Slope Disaster Management of Tirtire Bhir Landslide, Nuwakot (Ch. 32+200) |
गल्छी त्रिशुली मैलुङ्ग स्याफ्रुवेशी रसुवागढी सडक योजना, विदुर नुवाकोट |
Rs. 13,87,78,732 |
0.00% |
|
Roadway Excavation Works and Maintenance Works along Khulalu Salli Salla Road(Chaingage 100+000 to 122+750), Humla (HSRP/337011184/078/79-13) |
हिल्सा सिमिकोट सडक योजना, हुम्ला |
Rs. 1,30,90,974 |
0.00% |
|
Upgrading of Inaruwa-Kaptangunj Road Sunsari |
योजना तथा अनुगमन महाशाखा (योजना अनुगमन तथा मुल्यांकन शाखा) |
Rs. 50,27,87,285 |
5.00% |
|
Construction of Earthwork in Excavation, Cross Drainage and Retaining Structure works of Arun Corridor 52+000 to 65+500 Km |
योजना तथा अनुगमन महाशाखा (योजना अनुगमन तथा मुल्यांकन शाखा) |
Rs. 5,17,71,944 |
2.00% |
|
Bridge Construction Works (RCC Girder) Over Hanumante Khola in Ma. Thi. Na. Pa and Su. Na. Pa 2 Gatthaghar- Balkot Road,Bhaktpur |
सडक डिभिजन, भक्तपुर |
Rs. 6,35,10,203 |
2.00% |
|
Upgrading to Blacktop Road Standard of Suketar-Deurali-Kaphlepati-Pathibhara Road & Link Road (Chainage 0+000 to 10+996 Km) |
उत्तर दक्षिण (मुलघाट दोभान ओलाङ्चुङगोला खण्ड) सडक योजना, ताप्लेजुङ्ग |
Rs. 37,07,49,708 |
0.00% |
|
Roadway cutting & structural works on Martadi-Ghatmuna-Seyadhunga-Dahakot Road Section Connecting Bajhang Border |
डिभिजन सडक कार्यालय, साँफेवगर, अछाम |
Rs. 17,28,47,818 |
1.70% |
|
Design and Build of Doda River Bridge on Postal Highway (Dokebazar - Belauri - Road Section) Ch. 6+500 |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 29,41,00,000 |
5.00% |
|
Road Construction Works ( Asphalt concrete ) on Bhaise Lamidada Section of TRP, Makwanpur |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 3,65,32,516 |
0.00% |
|
Narayanghat Butwal Road Project Section 1 (Eastern part) |
आयोजना निर्देशनालय, ए.डि.वि., विशालनगर, काठमाण्डौ |
Rs. 8,08,13,23,571 |
1.18% |
|
Construction of Lalbakaiya River Bridge (6*36m PSC) along Nijgadh Pataura Tikuliya Bankul Gaur Sadak, Rautahat |
यान्त्रिक कार्यालय, भक्तपुर |
Rs. 24,45,64,758 |
15.00% |
|
Roadway Excavation and Structural Work in Mahakali Corridor at(CH:38+000 to 65+000),Simalta to Surnaya Khola,Dadeldhura(KS/Mitra j.v) |
दार्चुला टिङकर सडक योजना, दार्चुला |
Rs. 21,52,59,811 |
0.90% |
|
Design and Build of Bridge over Karnali River,Sankarighat pul (pradesh no 5 ra 7 jodne) Tikapur ward no. 2, Kailali,Kailali/Bardiya |
सडक डिभिजन, डोटी |
Rs. 1,04,02,50,000 |
5.00% |
|
स्याबुन गा.वि.स.आइतबारे नागेश्वोर गुफा रोड |
डिभिजन सडक कार्यालय, तुम्लीङटार, संखुवासभा |
Rs. 6,73,350 |
0.00% |
|
सरस्वती खोला पुल, सितापुर ९ र खुरुकियाही ९ दुमुहान, सिराहा, सिराहा |
डिभिजन सडक कार्यालय, सिराहा |
Rs. 4,07,10,133 |
0.00% |
|
सम्राट सिमेण्ट उद्योग सडक |
सडक डिभिजन, दाङ्ग |
Rs. 1,88,63,999 |
0.00% |
|
लमहि-बबई पुल कुईरेपानी सडक । |
सडक डिभिजन, दाङ्ग |
Rs. 19,59,670 |
0.00% |
|
राप्ती हाईवे अमेलिया- तुलसीपुर - चोरखोला सडक खण्ड । |
सडक डिभिजन, दाङ्ग |
Rs. 25,56,411 |
0.00% |
|
राप्ती राजमार्ग सितलपाटी - मुसीकोट सडक खण्ड । |
सडक डिभिजन, दाङ्ग |
Rs. 1,91,73,512 |
0.00% |
|
राप्ती राजमार्ग अमेलिया - तुलसीपुर - सितलपाटी सडक खण्ड । |
सडक डिभिजन, दाङ्ग |
Rs. 1,20,00,534 |
0.00% |
|
राप्ती राजमार्ग अमेलिया - तुलसीपुर - सितलपाटी सडक (चोरखोला-कपुरकोट) । |
सडक डिभिजन, दाङ्ग |
Rs. 2,31,97,896 |
0.00% |
|
राप्ती गा.पा. ७ स्थित छोट्की सिसहनियाको माझी कुलो देखी करङ्गेकोट सम्मको सडक |
सडक डिभिजन, दाङ्ग |
Rs. 19,95,407 |
0.00% |