Upgrading of Existing Earthen road to blacktop standard along Inarwa Malhaniya Phulbariya Banarjhulla Sagharachouk Tariya Lakkar Sakhuwa Maran Naraha Nathpatti Taratole Yadukuha |
सडक डिभिजन, पोखरा |
Rs. 12,15,00,322 |
7.00% |
|
Upgrading to Gravel Road Standard of Chatara-Mulghat-Majhitar-Dovan-Olangchunggola (Tamor Corridor) Road, Limbunipul-Dagurne Section (Chainage 115+000 to 135+000 Km) |
उत्तर दक्षिण (मुलघाट दोभान ओलाङ्चुङगोला खण्ड) सडक योजना, ताप्लेजुङ्ग |
Rs. 20,21,80,597 |
6.53% |
|
Ratchaur-Taltung-ujundada-Harpukot-Ishma Maidan-Neta-Kotkateri-Bhimghitte Road, Gulmi |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 40,89,799 |
0.00% |
|
Blacktop and Humepipe Culvert Works along Mahottari-4 Sansi Ga.Pa. Ward no.-06 dekhi Wada no .-04 Bhetpur Hundai Laxmipur Gothbanauli Parsa Sonama sammako Sadak Mahottari. |
सडक डिभिजन, भक्तपुर |
Rs. 60,80,316 |
7.00% |
|
Widening of Suryabinayak-Sangha Road Section of Suryabinayak Dhulikhel Road, Chainage 0+000- 7+500 |
मध्यमाञ्चल क्षेत्रिय सडक निर्देशनालय, काठमाण्डौ |
Rs. 3,44,19,43,557 |
7.50% |
|
Roadway Improvement Works on Dailekh Bazar-Mahabulekh-Galje-Bhattadi-Ratada-Nagma-Gamgadhi-Nakchelagna-Road(Unipata-Mahabulekh Section),Dailekh(Ch:36+000 to 40+000) |
सडक डिभिजन, तनहुं |
Rs. 7,05,09,380 |
7.00% |
|
Upgrading to Blacktop Road Standard of Suketar-Deurali-Kaphlepati-Pathibhara Road & Link Road (Ch 0+000 Km to Ch 10+996 Km ) |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 36,07,49,708 |
5.95% |
|
Construction of Blacktop Road and RCC Drain Works along Jamunibas- Bateshwar-Shantipur-Kurtha Sadak ( From Kurtha Bhan chauk towards Arerwa),Dhanusha . RDJKR/33701138/077-78/41 |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 85,89,240 |
0.00% |
|
D & B of kaligandaki River Bridge Connecting Krishnagandaki VDC- 4 Bastari,Syangja &Yamgha VDC-6 Mandran |
पुल योजना पश्चिम क्षेत्र सेक्टर नंः ४, पाल्पा |
Rs. 22,65,64,862 |
7.00% |
|
Excavation of Roadway and Structural works on Dumre- Bhaisikatta- Sardewa road section |
सडक डिभिजन, पाल्पा |
Rs. 58,94,800 |
60.00% |
|
Sangta -Dolpa Chharka Sadak, Mustang |
Road Division, Baglung |
Rs. 1,24,12,947 |
10.00% |
|
Blacktopped Road Construction along Ghinaghat Biratchowk Sadak, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 63,77,219 |
0.60% |
|
Improvement of Khutiya Pul Kanari - Urma - Behedababa- Sadak (1+200 To 2+200) |
सडक डिभिजन, कञ्चनपुर |
Rs. 69,37,655 |
10.00% |
|
Upgrading of Balephi Jalbire Katike Tembuthan Road, Balephi Naubise section, Sindhupalchwok |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 15,57,25,318 |
11.00% |
|
Upgrading/Improvement of Mate-Bhadar, Arghakhanchi and Purkotdaha-Arkhabang, Gulmi Road Section of Saljhandi-Sandhikharka-Dhorpatan Road to Blacktopped Standard |
डिभिजन सडक कार्यालय, सिराहा |
Rs. 91,47,28,977 |
10.00% |
|
Design and Build of Dudhkoshi River Bridge : Dudhkhosi Barkhughat, Solukhumbu |
मध्यमाञ्चल क्षेत्रिय सडक निर्देशनालय, काठमाण्डौ |
Rs. 10,16,60,000 |
0.00% |
|
Periodic Maintenance works at Mid Hill Highway NH 03 (Seti Highway) CH 32+000 to 50+000 |
सडक डिभिजन, तनहुं |
Rs. 2,89,38,506 |
15.00% |
|
Design and Build of Khajura Khola Bridge, Baruwa Nahar Crossing, Bardaghat Ambar-Triveni Road, Buddha Circuit, Nawalparasi |
सडक डिभिजन, तनहुं |
Rs. 8,02,55,000 |
15.00% |
|
Upgrading of Chhinchu Bazar Road (Pradesh Rajdhani Jodne Rajmarga ) into Four Lane Standard at Ratna Rajmarga (Chhinchu Bazar ),Surkhet |
यान्त्रिक कार्यालय, झापा |
Rs. 24,28,71,486 |
4.75% |
|
Periodic Maintenance Works on Palung Tistung Section ( CH 56+000 to 64+800 ) of TRP, Makwanpur |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 1,55,54,876 |
0.00% |
|
Rehabilitation Works Along Mechi Highway(Phidim-Suketar Section) |
सडक डिभिजन, सुर्खेत |
Rs. 2,50,28,747 |
0.00% |
|
Road Construction works along Bhalukhop-Khudnabari Road, Ilam |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 2,85,25,065 |
0.00% |
|
Road Upgrading Works Including Cross Drainage and Retaining Structure along Ji.Pi. Marg Itahari- Kaseni Leti Road, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 1,87,14,379 |
5.00% |
|
C-001 |
Unknown |
Rs. 10,000 |
25.00% |
|
Upgrading of Durgauli (CH: 00+000) to Partaappur (CH: 10+000) Road Section of Seti Highway, Kailali |
Unknown |
Rs. 27,51,30,920 |
4.49% |
|
Rehabilitation Works with Asphalt Concrete Structure Works from Piluwa to Chainpur Section, Sankhuwasabha. |
डिभिजन सडक कार्यालय, तुम्लीङटार, संखुवासभा |
Rs. 1,57,95,363 |
0.00% |
|
Roadway upgrading works, Construction of Cross-drainage Structure, Retaining Structure works on Chame Khansar Road (Swargadwaripul-Humde-Munche Section) |
सडक डिभिजन, तनहुं |
Rs. 32,40,42,311 |
10.00% |
|
Road Improvement Works on Bharatpur Hakim Chowk-Gitanagar-Pakaudi Road ( Madi Thori Sadak,Hulaki Rajmarg),Chitwan |
Unknown |
Rs. 25,28,47,699 |
3.39% |
|
Construction of road along Tinau River Corridor-India Boarder Road(Danav Section), Rupandehi (Chainage-0+000 to 2+480, 4+290 to 9+500 at right bank and 4+290 to 5+500 at left bank of Danav River) |
हेभिईक्युपमेन्ट डिभिजन, सुनसरी |
Rs. 44,63,88,034 |
5.00% |
|
Narayanghat Butwal Road Project Section 2 (Western part) |
आयोजना निर्देशनालय, ए.डि.वि., विशालनगर, काठमाण्डौ |
Rs. 6,87,32,73,725 |
8.07% |
|
Construction of road along Tinau Danav River Corridor-India Border Road (Tinau Section), Rupandehi (Chainage: 4+305 to 15+500 at left and 4+305 to 12+500 at right side of Tinau River) |
सडक डिभिजन, बैतडी |
Rs. 78,24,74,760 |
5.00% |
|
Reactive Maintenance Works on Gorusinge-Sandhikharka Road at Bhuwanpata-Dahakhola (CH 43+000-58+000), Arghakhanchi |
सडक डिभिजन, कपिलवस्तु |
Rs. 73,08,848 |
0.00% |
|
Upgrading of Basantapur-Myanglung road of (Ch 0+000 to 10+500 km) to Black Top Standard, Terhathum |
Puspalal (Midhill) Road Project, Panchthar |
Rs. 53,51,03,194 |
0.00% |
|
T.D.R. Construction Pvt. Ltd. |
धनगढी-खुटिया-दिपायल-चैनपुर-उरैभन्ज्याङ्ग सडक योजना, बि.पी. नगर, डाेटी |
Rs. 3,58,42,631 |
15.00% |
|
Roadway Upgrading Works on Aabukhaireni-Gorkha Road (Chainage 0+000 to 24+000), Gorkha |
सडक विभाग, काठमाण्डौ |
Rs. 77,63,305 |
5.00% |
|
Road improvement works along Sainamaina Na.Pa Basgadhi dekhi Kanchan Ga.Pa Gajedi Lausa Chaupari bata Bakullaghat - Ramapur Lumbini Sadak, Rupandehi |
सडक डिभिजन, दाङ्ग |
Rs. 1,10,44,805 |
4.00% |
|
Construction of Steel Truss Bridge over Kaligandaki River at Ridi in Gulmi (Ridi)-Syangja (Chandibhagyang) District |
हेभिईक्युपमेन्ट डिभिजन, कैलाली |
Rs. 17,95,75,814 |
45.00% |
|
Design and Build of Bridge over Deumai Khola, Fulungi, Illam |
Unknown |
Rs. 11,62,40,000 |
3.96% |
|
Presstressed RCC Bridge Construction Over Bheri River Purtim Kanda and Garayalaya VDC along Devesthal Chaurjahari Radijyula Dolpa Road (Near Githakot, Madhyapahadi Lokmarg) |
डिभिजन सडक कार्यालय, चौरजहारी |
Rs. 13,04,80,274 |
0.00% |
|
Widening and Upgrading of Rani Biratnagar Itahari Dharan Road to Six Lane.(Ch: km 18+125 to Ch: km 20+000, Duhabi Section) |
Unknown |
Rs. 24,41,43,670 |
10.00% |