All Projects
Project |
Office |
Budget |
Progress |
Action |
---|---|---|---|---|
Upgrading of road with Bituminous Asphalt with Structural Works (Pokhari to Barpak) on Ghyampesal-Takukot-Hudaikhola-Sawara-Saurpani-Ranchowk-Pokhari-Barpak Road |
गाेरखा सडक योजना, गोरखा |
Rs. 25,80,03,588 |
14.00% |
|
Upgrading of Road to double lane Balcktop (DBST) standard of Madi Marshyangdi Corridor (Sisneri-Birta-Tuhurepasal-Ramgha-Mantehatiya Section) |
सडक डिभिजन, तनहुं |
Rs. 21,72,65,087 |
14.00% |
|
Bridge Construction Works (PSC Girder of One Span) Over Kerunga River along Madi Thori Jagatpur, Chitwan |
डिभिजन सडक कार्यालय, चितवन |
Rs. 35,11,07,582 |
94.27% |
|
Design and Build of Bridge over Mohana Nadi, connecting Krishnapur Municipality-7 Shantipur to Kailali Geta, Kailali |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 12,01,92,000 |
10.00% |
|
Construction of Simply Supported RCC Bridge(4*15.5=62m) Over Manahara Khola along Mohanapul-Attariya Road,Kailali |
मोहनापुल अत्तरीया सडक योजना कार्यालय, कैलाली |
Rs. 6,18,79,824 |
0.00% |
|
Vimpokhara-Achhete-Salam-Multhana-Sim-09, Myagdi Jodne Paryatakiya Sadak, Kathekhola Ga.Pa. Sadak, Baglung. |
Road Division, Baglung |
Rs. 1,21,27,396 |
10.00% |
|
Upgrading Roadway Excavation & Structural Works at Dailekh Bazar--Mahabulekh-Bhattadi-Ratada-Nagma-Gamgadi-Nakchelagna Road(Ch:25+700 to 36+000),Dailekh |
Unknown |
Rs. 2,22,84,297 |
10.00% |
|
भालुबाङ -गढवा -कोईलाबास जोडने दामोदर सडक |
सडक डिभिजन, दाङ्ग |
Rs. 3,66,20,049 |
30.00% |
|
Sallaghari Chamalek Dakale Road, Dadeldhura |
डिभिजन सडक कार्यालय, चितवन |
Rs. 9,51,50,757 |
11.00% |
|
Road Construction (Earthwork and Gravelling) Works on Basbariya Kachaurwa Paterwa Road, Bara |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 61,32,557 |
0.00% |
|
Road Construction and Upgrading Works along Gumba (Bhojpur) Kot Gogane Lekharkha Pandhare Sadak |
डिभिजन सडक कार्यालय, तुम्लीङटार, संखुवासभा |
Rs. 4,00,20,050 |
0.00% |
|
Upgrading/Improvement of Simaltari-Sautamare-Machhi Road Section, Gulmi/Pyuthan 31.8 Km of Madan Bhandari Highwa to Blacktop Standarsd |
Unknown |
Rs. 1,28,61,06,113 |
12.00% |
|
Highway Upgrading and Rehabilitation Works along Shitalpati Salyan Kupinde Baluwa sangrahi Road in Salyan District. |
सडक डिभिजन, दाङ्ग |
Rs. 94,72,842 |
20.00% |
|
Road Construction (Gravelling & Hume pipe Culvert) Works on Biruwachowk dekhi mahadevpatti samma Tharuhat sadak, Parsa |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 3,24,13,866 |
0.00% |
|
Roadway Excavation and Structural Work along Mahakali Corridor Giregada to Batta And Kasani Khola approach (CH:150+000-153+500 and 179+500-179+700) Baitadi (Kalpabrichhya-Aajiwan-Shahi Chandani JV) |
योजना तथा अनुगमन महाशाखा (HMIS तथा ICT शाखा) |
Rs. 5,22,33,353 |
8.71% |
|
Upgrading & Rehabilitation works along Lubhu- Lakuribhanjyang -Manedovan Road |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 2,23,18,509 |
0.00% |
|
Upgrading of Rani Biratnagar Itahari Dharan Road (Rani Custom Office Sector Ch:0+000 to 0+180) to Six Lane. |
व्यापारिक मार्ग विस्तार आयोजना (रानी-बिराटनगर-इटहरी-धरान मार्ग), सुनसरी |
Rs. 3,00,24,769 |
0.00% |
|
Construction of Pavement & Drain works along Chandranigahpur Gaur Road, Rautahat |
सडक डिभिजन, बैतडी |
Rs. 1,19,79,245 |
15.00% |
|
Construction of RCC Four Lane Bridge over Kutmeshwari Khola Bridge, Mahottari |
योजना तथा अनुगमन महाशाखा (भूवातावरण तथा सामाजिक शाखा) |
Rs. 18,21,08,409 |
8.49% |
|
Pavement Work including Cross Drainage and retaining Structures along Sunaulomarg Drain with Blacktop, Sunsari |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 1,72,04,230 |
0.00% |
|
Structure works for Road Upgrading and Rehabilitation Works along Serighat - Manma Road (Karnali Highway) ( Ch 142+000-155+000) |
डिभिजन सडक कार्यालय, जुम्ला |
Rs. 99,69,829 |
0.00% |
|
Roadway Excavation, Landslide Protection, Culvert, Rigid Pavement and Retaining Wall Construction in Dumre Besisahar Chame Road (Ch 19+100 to ch 31+950), Lamjung |
डुम्रे बेसीशहर चामे सडक योजना, बेसीशहर लमजुङ |
Rs. 5,75,64,645 |
9.00% |
|
Construction of RCC Bridge Over Ghatte Khola Bridge marbu Chankhu Road |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 1,95,47,605 |
0.00% |
|
Road improvement works along Nayagaun- Belbariya- Krishnagunj Road in Rupandehi District. |
सडक डिभिजन, वांके |
Rs. 2,03,24,080 |
7.86% |
|
Road construction and upgrading works of Ranitar(Aamchowk Ga.Pa) Dudhkoshi Kinar Hasanpur Chuharbesi Arun NAdi Kinar Thulo Dumma Sano Dumma LEguwaghat JAubari Solu road,Bhojpur |
डिभिजन सडक कार्यालय, धनकुटा |
Rs. 23,83,67,533 |
8.00% |
|
mprovement of Araniko Highway Dhulikhel Dolalghat Road Section NH34, Dhulikhel Khawa Section (ch. 30+000-34+155.47Km) |
सडक डिभिजन, भक्तपुर |
Rs. 17,87,13,717 |
10.00% |
|
Roadway Improvement and Structure Works of Pili Pakha Chhapre Dar Chhedana Khallaban Nagma Sadak (Shahid Smriti Marg,Kalikot) |
सडक डिभिजन, कपिलवस्तु |
Rs. 16,14,65,334 |
6.00% |
|
Reactive (Recurrent) Maintenance of Road surface. in Anarkholi-Khodpe-Patan Section of Midhill Highway, Ch: 0+000 to 89+000 (NH-03) |
सडक डिभिजन, बैतडी |
Rs. 62,13,920 |
0.00% |
|
Construction of 1*35 m prestressed Concrete Bridge over Pitibang Khola, Rukum(west) |
डिभिजन सडक कार्यालय, चौरजहारी |
Rs. 4,94,11,456 |
0.00% |
|
Biratnagar Maha na.pa. 14 Dekhi Jahada Ga.pa. ward no.3 Bhatigachi Hudai wada no.2 and, 6 jahada sadak, Morang and Jahada Ga. pa. Katahari Tarigama Sadak Blacktopped Jahada Khand Sadak, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 63,24,303 |
7.00% |
|
Construction of 3-Cell RCC Box Culvert at Sabaila Bazaar, Dhanusha |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 2,69,22,815 |
0.00% |
|
M/S Elite-YSS JV |
चैनपुर खादवारी सडक योजना, तुम्लीङटार, संखुवासभा |
Rs. 17,52,87,566 |
76.81% |
|
Upgrading of Existing Earthen Road To Blacktop Standard along Ghorghas (Sixlane) Devdiha Bahuarwa Bhadariya Dhanauji Lakhauri Gordaha Deuri Kanakpati Tetariya Thumhauna Kumhrauda(Sixlane) Road Dhanusha. |
सडक डिभिजन, वुटवल |
Rs. 11,36,14,658 |
4.00% |
|
Road widening and upgrading works at Sallaghari -Duwakot -Khadkadil - Bir Hospital- Mulpani Road (Package-II), Sallaghari Hanumante Bridge-Duwakot Mode Section and Khadkadil-Manohara Bridge Section, Bhaktapur |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 24,24,19,225 |
15.00% |
|
Upgrading of the Mirchaiya Katari Road (Chure Section) |
Unknown |
Rs. 16,38,18,462 |
10.50% |
|
Pavement Works Including Cross Drainage Structures along Belbari-Fadani-Lokhara-Sagma dada Sadak, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 10,01,79,275 |
6.84% |
|
Upgradation of Mugling Anbhukhaireni Pokhara Road (Section 2) Km 49+700 to Km 88+583 |
सडक विभाग, काठमाण्डौ |
Rs. 5,79,82,60,862 |
7.00% |
|
Periodic Maintenance of Mahakali Highway NH 66. CH 123+000 to 131+000 |
सडक डिभिजन, डोटी |
Rs. 1,14,97,481 |
10.00% |
|
Retaining structures, Cross drainage and Gravelling Works at Madhyapaschim Lokmarg, Jajarkot - Panchkatiya section. |
डिभिजन सडक कार्यालय, चौरजहारी |
Rs. 39,58,470 |
0.00% |
|
periodic Maintenance of East West Highway (Chainage 979+000 to 1018+410) Kailali and Kanchanpur |
सडक डिभिजन, कञ्चनपुर |
Rs. 8,50,70,358 |
7.00% |