Project |
Office |
Budget |
Progress |
Action |
|---|---|---|---|---|
|
Construction of 15 meter, 2-Webbed RCC slab-Deck cast in situ bridge over Patalkhet Khola Along Dipayal-Channukanda Road, Doti. Chainage 53+000 |
सडक डिभिजन, डोटी |
Rs. 3,24,16,094 |
50.00% |
|
|
Kusma-Durlung Sadak, Parbat. |
Road Division, Baglung |
Rs. 1,11,92,897 |
55.00% |
|
|
Construction of Retaining structures, Drain works and Pavement maintenance works along Dumre-Besisahar Road |
सडक डिभिजन, तनहुं |
Rs. 30,42,886 |
0.00% |
|
|
construction of service track at various locations of ring road |
काठमाडौं चक्रपथ सुधार योजना, ललितपुर |
Rs. 3,27,19,104 |
0.00% |
|
|
Road Improvement works of Dharedhunga-Aarubuta-Ghormare-Thamu-Rabesi-Supadeurali Sadak and Arghakhanchi jilla Daredhunga-Aarubuta-Ghormare-chahara-Mathurabesi-Supadeurali Motorbato bahuwarsiya yojana |
डिभिजन सडक कार्यालय, सिराहा |
Rs. 90,02,041 |
50.00% |
|
|
Road Improvement works on BogatitarBanuwaKarmidandaSadak, Rasuwa |
डिभिजन सडक कार्यालय, नुवाकोट |
Rs. 87,89,471 |
100.00% |
|
|
Recurrent Maintenace work along MRM Ithari to Inarwa Section (CH.092+000 to 109+000) |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 14,66,885 |
97.45% |
|
|
Maintenance of Slab Culvert at Pachira along Duhabi Inaruwa Kaptangunj Road, Sunsari |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 8,52,627 |
97.00% |
|
|
Rehabilitation Work along Dharan- Bhedetar Road section(KRM) |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 97,27,163 |
97.32% |
|
|
Road Construction works along Ilam Na.Pa-5, Bhanjyang-Rakase-Belase-Danabari-Jhapa Road, Ilam |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 2,96,24,620 |
0.00% |
|
|
Road Upgrading with gravelling and Structural works on Bimalnagar Mahuwatar Thatipokhari Dudhpokhari Sadak . |
गाेरखा सडक योजना, गोरखा |
Rs. 93,83,307 |
97.00% |
|
|
Construction of Blacktop Road along Sanischare Bajar Singari Mahadeva Sadak, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 55,83,108 |
0.00% |
|
|
Upgrading of roads (E/W highway) including construction of blacktop roads, causeway etc. Pushpalpur Dhalke(Ch.252+000 to 257+075) Dhanusha |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 2,15,94,159 |
0.00% |
|
|
Janakpur(Mujeliya) Dhanushadham - Dharapani Ramayan sarkit sadak , Dhanusha at Mujeliya-Bengadabar section. RDJKR/33701138/077-078/44 |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 80,67,783 |
98.00% |
|
|
Improvement of Indraban Samudaya Pipalchautara (Chadani-5) -Devistan India Border, Kanchanpur |
सडक डिभिजन, कञ्चनपुर |
Rs. 15,71,173 |
55.00% |
|
|
Construction of Blacktopped Road including Drain works in Janta Marg Biratnagar Mahanagarpalika wada no 1, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 54,12,579 |
96.89% |
|
|
Construction of gravel Road Construction work including Drainage Structures along Sunsari Xetra no 4- Sahebgunj(Bharat border)-Ra. Shi. Ga. Bi. Sa. Thakurbadi chowk hudai Ra.Shi. 6,5,4,3,2 hudai Gautampur Ga.Bi. Sa. Itabhatta hudai Hatiya chowk Jalpapur Ga. Bi Sa. Babiya Ga.Bi.Sa hudai Shastra sima Prahari hudai- Hanuman chowk bat Rajmarg 20km |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 1,27,25,550 |
0.00% |
|
|
Construction of Pavement work along City Route antargat Biratnagar 5 ko wada Karyalaya dekhi santi chowk samma Blacktopped, Biratnagar-5, Morang, Sagarmatha Eklavya Marga Blacktopped, Biratnagar 4,Morang, Babakuti Sanjibni Marg hudai Bhagwati Marg Samma Blacktopped , Biratnagar-4, Morang and Aayurbedic Marga Blacktopped , Biratnagar-4, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 92,21,778 |
96.47% |
|
|
Supplying and Fixing of Highway Street Light |
ब्यापारिक मार्ग बिस्तार आयोजन, बेलहिया बुटवल सडक , रुपन्देही |
Rs. 3,76,03,283 |
0.00% |
|
|
Construction of BlackTop Road along Rangeli Na.Pa. Jodne Sadak 6 & 7,Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 31,93,993 |
0.00% |
|
|
Construction of Causeway,Rcc drain, gabion, stone masonary,Box culvert Works along Godar(Dhanusa) chisapani-mainabati -kalapani-dudhauli-sindhuli NH79 (from Shiv Mandir to Crusher Rakheko Samm) |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 1,64,40,547 |
0.00% |
|
|
Road Maintenance (Upgrading and Rehabiliation) in Anarkholi-Khodpe-Patan-Satbajh Section of Pushpalal (Mid Hill) Highway (NH03) |
सडक डिभिजन, बैतडी |
Rs. 50,85,782 |
46.17% |
|
|
Miscellaneous Maintenance work at Bardibas-Nepalthok road Section of Dhulikhel-Sindhuli Bardibas Road |
सूर्यविनायक-धुलिखेल, धुलिखेल-सिन्धुली-बर्दिवास सडक आयोजना, काठमाण्डौ |
Rs. 1,65,50,750 |
0.00% |
|
|
Blacktop work at Sahorba dekhi matihani Bazaar Road (Krishna path), Mahottari |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 49,11,702 |
0.00% |
|
|
Roadway Excavation with Retaining Structure, Pipe Culverts and Graveling works at Pokharabeshi- Falamkhani-Baniyagaun-Madikilo Nursery simpani Darmichaur hudai Harmibhanjyang Road |
गाेरखा सडक योजना, गोरखा |
Rs. 1,70,85,633 |
21.00% |
|
|
Maintenance of Black topped Road along Dhangadhi - Bhajani - Satti Road (0+000 ~ 15+000) |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, धनगढी, कैलाली |
Rs. 12,62,913 |
0.00% |
|
|
Upgrading to Gravel Road Standard of Chatara-Mulghat-Majhitar-Dovan-Olangchunggola (Tamor Corridor) Road, Shuvang-Limbunipul Section (Chainage 95+000 to 115+000 Km) |
उत्तर दक्षिण (मुलघाट दोभान ओलाङ्चुङगोला खण्ड) सडक योजना, ताप्लेजुङ्ग |
Rs. 20,56,19,151 |
49.15% |
|
|
Shoulder Maintenance by Gravel at Lamki - Tikapur - Khakraula Road, Kailali |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, धनगढी, कैलाली |
Rs. 5,59,670 |
0.00% |
|
|
Shoulder Maintenance by Gravel at Lamki - Tikapur - Khakraula Road, Kailali |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, धनगढी, कैलाली |
Rs. 5,59,670 |
0.00% |
|
|
Construction of Bridge over Leuti River, Simsuwa, Dhankuta along Simsuwa-Budhikmorang-khuwaphok-kurule-Tenupa-Madhyachaubise Road |
डिभिजन सडक कार्यालय, धनकुटा |
Rs. 6,69,62,451 |
0.00% |
|
|
Inguriya River along Sainamaina 11, Palpa Laugha Pani Road |
सडक डिभिजन, वुटवल |
Rs. 5,13,52,448 |
0.00% |
|
|
Roadway Excavation and Structural Works on Jayramghat Mulghat Khuwa Solu Dudhkoshi Ekbar Road, Okhaldhunga |
सुदुरपच्चिमाञ्चल क्षेत्रिय सडक निर्देशनालय, डोटी |
Rs. 76,36,529 |
100.00% |
|
|
Construction of Blacktop Road in Kirinci Ratamato Lamjung |
Puspalal (Midhill) Road Project, Gorkha |
Rs. 31,75,25,169 |
0.00% |
|
|
Roadway Excavation, Structural and Cross Drainage Works on Ch 0+000 to 47+000 of Aryabhanjyang-Rampur Road, Palpa. |
सडक डिभिजन, पाल्पा |
Rs. 1,01,07,839 |
40.00% |
|
|
Trishakti construction Dhangadhi kailali |
धनगढी-खुटिया-दिपायल-चैनपुर-उरैभन्ज्याङ्ग सडक योजना, बि.पी. नगर, डाेटी |
Rs. 1,25,70,000 |
50.00% |
|
|
Road Upgrading works of Thankot Chitlang Road (8+700 to 15+500) |
थानाकोट चितलाङ सडक योजना कलंकी, काठमाडौं |
Rs. 4,12,72,106 |
50.00% |
|
|
Pavement Work including Cross Drainage and Retaning Structures Along Sombare Madangram- Satpidi hudai Bhauda Sadak,Ratuwamai, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 1,39,86,011 |
76.30% |
|
|
a) Upgrading of Seugha Barbot Purkotdaha Malagiri Pyuthan Road b) Upgrading of Seugha Simaghat Purkotdaha Hadhade Pipaldhara Nayagaun Tamghas Road, Gulmi |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 40,63,540 |
0.00% |
|
|
pecific Maintenance Work of Mahendra Rajmarg (Ch.236+620-258+000) along Mahendra Rajmarg |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 83,98,771 |
0.00% |
|
|
Periodic Maintenance of Parasi-Bhairahawa Road |
पुल महाशाखा, आयोजना कार्यान्वयन शाखा (PCU), बबरमहल, काठमाडौं |
Rs. 25,49,87,666 |
73.37% |