Construction of Asphalt Concrete & RCC Box Culvert, along Dharapani-Dhanushadham-Janakpur Sadak, Dhanusha (Kachuri-Tarapatty) |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 3,01,23,529 |
0.00% |
|
|
Sarlahi Jjilla Chandranagar Ga.Pa. Ring Road, Sarlahi |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 53,71,717 |
0.00% |
|
|
Basang Gaupalika ward No 2 -Naurikot-Gurusanbo Cave Road, Mustang |
Road Division, Baglung |
Rs. 64,09,595 |
55.00% |
|
|
Construction Of Drain and Asphalt Pavement works along Inaruwa-Kaptangunj Road (Dewanhunj Bazzar), Sunsari |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 1,13,10,605 |
0.00% |
|
|
Blacktopped road Construction works including Drainage Structures along Sisbani jhada Gaupalika Chakrapath Sadak Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 57,82,143 |
49.82% |
|
|
Construction of RCC T-Beam Bridge in Kandrei (Kamdehi) Khola along Rajpur Tulsi Road, Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 4,45,55,843 |
100.00% |
|
|
Upgrading works of Thulopatala laharemane Mirge Upalmudi Road |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 44,36,736 |
0.00% |
|
|
Road maintenance works including earthworks,drainage and structural works from Deurali to Phasinda Dovan (28+000 to 50+000) |
उत्तर दक्षिण, कोशी सडक योजना, संखुवासभा |
Rs. 1,26,11,008 |
0.00% |
|
|
Traffic Safety Works Including W Beam Metal Crash Barrier along KRM (Dharan to Bhedetar Section |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 22,65,000 |
0.00% |
|
|
Roadway Excavation,Structure and Pavement works on Mathilo Dungeshwor-Baik-Byauli-Nagma-Jodne Sadak(Ch:10+820-13+000) |
सडक डिभिजन, सुर्खेत |
Rs. 1,08,62,050 |
49.73% |
|
|
Roadway excavation, Stucture and pavement works on Mathillo - Ddungeshwor- BAik- Byauli-Nagma Jodne Sadak (Ch: 10+820-13+000)KM (RDSKT/33701138-4/076/77-82) |
सडक डिभिजन, सुर्खेत |
Rs. 1,08,62,050 |
49.73% |
|
|
Patch Work (Recurrent Maintenance) at Various Stations of Khurkotsindhuli-Bardibas road section |
सूर्यविनायक-धुलिखेल, धुलिखेल-सिन्धुली-बर्दिवास सडक आयोजना, काठमाण्डौ |
Rs. 64,11,652 |
0.00% |
|
|
Rehabiliation Works on Gurje Bhanjyang-Thanapati-Chhahare Section of Samakhusi-Tokha-Gurje-Chhahare Road |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 2,46,70,265 |
100.00% |
|
|
Road Upgrading works on Nageshwor marga Mahalaxmi Municipality ward no. 5 Ram Bajar Arun School Salghari Nageshwor Mandir Jitpur Murti Dhunga Sidhuwa Road Dhankuta |
डिभिजन सडक कार्यालय, धनकुटा |
Rs. 88,01,750 |
0.00% |
|
|
Construction of RCC Road along Ma.na.pa.19 Highway mahabir Mandir dekhi Jamuniya hudai Kumraura Bagewa Vangha Baniniya nahar sadak Dhanusha |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 40,08,617 |
0.00% |
|
|
Construction of Blacktop Road Including Drainage Structure along Dadarberiya Chowk Dekhi Kadmaha Nocha hudai Bhartiya sima sadak, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 1,17,30,047 |
49.00% |
|
|
construction of roadway and structural works in khaniyakharka bahuntilpung road |
डिभिजन सडक कार्यालय, खुर्कोट |
Rs. 65,08,010 |
0.00% |
|
|
Blacktopped Road Construction Works including Drainage Structures along Lohendraghat-Judipul - satarbasti hudai Thlha Baudha Sadak Morang. |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 48,57,117 |
98.66% |
|
|
Construction of RCC Bridge over Chirai Khola Along Gugauli-Sivagadhi Road, Kapilvastu |
हुलाकी राजमार्ग योजना कार्यालय, कपिलवस्तु |
Rs. 3,84,01,811 |
100.00% |
|
|
Rehabilitation Works at KRM (Leguwa-Kewabesi) |
योजना तथा अनुगमन महाशाखा (सडक सुरक्षा तथा ट्राफिक शाखा) |
Rs. 2,10,10,090 |
100.00% |
|
|
Recurrent Maintenace work along Sombare Chowk-Urlabari Road, Morang (CH45+000 to 65+000) |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 10,41,220 |
98.00% |
|
|
Roadway Excavation and Construction Of Structure onGoruchaur-Aruchaur-dyam budhu-kaladada- Khamale -baratu-Shreekot Sadak |
डिभिजन सडक कार्यालय, जुम्ला |
Rs. 18,67,750 |
0.00% |
|
|
Construction of Gravel road including Drainage Structures along Sahebgunj Amruwa Amahi Bela Chimdi Simariya Naruwa sadak, Sunsari (Near Sahebgunj School 300m and Barju Chowk jodne 500m) |
Unknown |
Rs. 1,06,27,669 |
48.00% |
|
|
Construction of Simply Supported Span, 2-Webbed RCC Slab Deck Motorable Bridge over Gauda Khola in Patan Pancheshwor Road (Ch. 2+200) |
सडक डिभिजन, बैतडी |
Rs. 2,39,24,009 |
0.00% |
|
|
Road construction works on Puspalal marga, Chanaute-Banjhe-Jhule-Jiri Road |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 1,53,35,297 |
0.00% |
|
|
Construction of Pre-stressed Bridge over Binayi River along Koltadi Road |
सडक डिभिजन, वुटवल |
Rs. 9,54,09,623 |
0.00% |
|
|
Rehabilitation Works of Fungling Bazar Roads,Taplejung |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 1,37,28,706 |
0.00% |
|
|
Road Pavement Works along Dharke-Sitapaila Road, NH21, Dhading |
योजना तथा अनुगमन महाशाखा (सडक सुरक्षा तथा ट्राफिक शाखा) |
Rs. 7,07,45,641 |
50.00% |
|
|
Kaptangunj Pachau Simar(Sima) Nayahatiya-Pachim Devangunj Madhayharsahi, Harinagara thana- Ramnagar- Bhutha Chparahi- Narshing- Janta Chowk MRM Sunsari |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 8,41,01,240 |
0.00% |
|
|
Earthwork and Blacktop Works along RamJanki Path Sadak ( Aabar to Matihani Khand ) |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 2,82,40,373 |
0.00% |
|
|
Road Construction and Upgrading works along Gumba (Bhojpur) Kot Gogane Lekharkha Pandhare Sadak |
डिभिजन सडक कार्यालय, तुम्लीङटार, संखुवासभा |
Rs. 1,58,39,240 |
0.00% |
|
|
DRODMK/3371574/073-74/160 |
डिभिजन सडक कार्यालय, झापा |
Rs. 4,89,86,315 |
86.00% |
|
|
Upgrading of roads (E/W highway) including construction of blacktop roads, retaining walls, causeway etc. Ratu Bhapsi Road sector(Ch 268+282 to Ch 282+600), Mahottari |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 1,36,41,234 |
96.00% |
|
|
Construction of RCC Bridge with Pile Foundation in Kamdehi Khola along Kheshariya-Karuniya Sadak, Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 2,35,33,032 |
0.00% |
|
|
Construction of RCC road & RCC Drain work along Darsaniya School Aspatal bhawan Khanepani karyalay dekhi Chhi. Na., DhanushaConstruction of RCC road & RCC Drain work along Darsaniya School Aspatal bhawan Khanepani karyalay dekhi Chhi. Na., Dhanusha |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 40,02,124 |
0.00% |
|
|
Construction Of Blacktop Road and Drain Construction work along on Biratnagar 1 Pokhriya Budha chowk dekhi Manakamana-Kamakhya Marg Budhmarg Hanuman chowk Sadak, Morang and Biratnagar 8 Nirmal Marg Sadak, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 59,70,370 |
49.50% |
|
|
ad including Drainage Structure along Chaudhary Tole Madhesa School Ba Si Sadak, Sunsari |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 1,23,44,698 |
0.00% |
|
|
Road Construction works at Chanaute- Lapse- Puranagaun- Ichowk- Surkenas- Ghopte Ghyang road, Sindhupalchowk |
सडक डिभिजन, सुर्खेत |
Rs. 11,75,725 |
43.00% |
|
|
Recurrent Maintenance work along Duhabi Inaruwa Sadak, sunsari |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 26,41,458 |
66.14% |
|
|
Construction of Tribeni Dhovan Khahare khola Bridge(1*20)Nuwakot |
Puspalal (Midhill) Road Project, Gorkha |
Rs. 4,03,52,660 |
100.00% |