All Projects
Project |
Office |
Budget |
Progress |
Action |
|---|---|---|---|---|
|
Specific Maintenance Work of Mahendra Rajmarg (Ch.258+000-282+600) |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 74,96,065 |
0.00% |
|
|
Construction of Rcc rigid pavement,Retaining Structure and box culvert work (Mithleshwar Settlement area) along Janaki Medical College Dekhi Ramdaiya Mithileshowr Mauwahi Inarwa Sabaila Paterwa Kamla Chikna Sirha sadak, Dhanusha |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 1,76,82,257 |
97.00% |
|
|
श्री मनकामना कन्स्ट्रक्सन प्रा.लि. |
पुर्वाञ्चल क्षेत्रिय सडक निर्देशनालय, झापा |
Rs. 49,11,972 |
48.93% |
|
|
Construction of RCC Bridge over Baniyani Khola near Mate School Dharampur-4 and 5, Basnet Tole, Jhapa. |
डिभिजन सडक कार्यालय, झापा |
Rs. 3,60,72,798 |
100.00% |
|
|
Construction of RCC Prestressed Bridge over Jallad River Janakpur Sub Metropolitian city-20 along Nocha-Deopura Road, Dhanusha |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 5,78,85,100 |
0.00% |
|
|
Construction of 6m Span Slab Culvert at Chhatauna-Mirjapur Sadak, Sarlahi |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 24,54,404 |
100.00% |
|
|
Specific maintenance at Banepa-Sindhuli-Bardibas Road Section |
सूर्यविनायक-धुलिखेल, धुलिखेल-सिन्धुली-बर्दिवास सडक आयोजना, काठमाण्डौ |
Rs. 70,86,362 |
0.00% |
|
|
Blacktopped Road Construction Works including Drainage Structures along Belbari Na. pa. 1 ko- Lohendrakhola-Naksalbari-Letang Na.Pa. 7- Phadani hudai Rajarani jodne-Belbari-Phadni-Budhabare-Sadak Morang. |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 53,79,078 |
95.00% |
|
|
Blacktopped Road Construction work along Sundar Haraicha 1,8 & 11 Jodne Bhulke Marg Salakpur bata Harich Jodne Sadak, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 19,75,545 |
0.00% |
|
|
Pavement and Structural work along Jagriti Marga Hudai Jubeli Chowk Sadak Sundar Haraincha -6, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 1,07,41,132 |
0.00% |
|
|
Design and Build of Tinau River Bridge, Tilottama-6, Paschim Pahuni to Suddhodhan Ga. Pa.-5, Rupandehi |
सडक डिभिजन, पाल्पा |
Rs. 18,45,50,000 |
55.00% |
|
|
Construction of Blacktopped Works on Birtamode Sainikmode Sainik Bajar Goldhap Road, Jhapa |
डिभिजन सडक कार्यालय, झापा |
Rs. 4,59,65,836 |
49.00% |
|
|
Road Maintenance works including earthworks,drainage and structural works from Loving Hill to Chichila section (0+000 to 22+000 |
उत्तर दक्षिण, कोशी सडक योजना, संखुवासभा |
Rs. 78,68,260 |
0.00% |
|
|
Road construction works |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 26,85,850 |
0.00% |
|
|
Roadway Excavation and Strucutral Works on Swarna Sagarmatha Brihat Chakrapath Road (Panchan - Barkhughat), Solukhumbu |
डिभिजन सडक कार्यालय, हर्कपुर, ओखलढुङगा |
Rs. 2,99,32,561 |
99.85% |
|
|
Construction of Pavement work along Munal Marga hudai Sombare marga samma Blacktopped, Biratnagar-2, Morang, Sangam marga hudai Balgopal marga Blacktopped, Biratnagar-8, Morang, And Himalayan marga Blacktopped, Biratnagar -17, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 72,24,022 |
100.00% |
|
|
Road Improvement works on Dhadingbesi Sangkosh Tippling Road, Dhading (Package-1 |
डिभिजन सडक कार्यालय, नुवाकोट |
Rs. 2,95,88,309 |
0.00% |
|
|
Upgrading works on Dailekh Naumule-Salkot-Siladi-1+300,Dailekh DistrictJajarkot Jodne Sadak,(Ch:0+000 to 1+300) |
सडक डिभिजन, सुर्खेत |
Rs. 1,64,93,507 |
99.93% |
|
|
Harshaha Chhedichowk Bhasedwa Dhansar Sadak, Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 22,59,606 |
0.00% |
|
|
Solu Du.Na.Pa.11-Tingla-Salyan-Necha-Bihibare-Furkey-Tuintar Road, Solukhumbhu |
डिभिजन सडक कार्यालय, हर्कपुर, ओखलढुङगा |
Rs. 1,85,76,470 |
100.00% |
|
|
Bridge Protection works on Koshi Highway |
डिभिजन सडक कार्यालय, धनकुटा |
Rs. 87,77,167 |
100.00% |
|
|
Recurrent Maintainance works at Koshi Highway (Dhankuta-Tute Deurali) |
डिभिजन सडक कार्यालय, धनकुटा |
Rs. 1,20,44,861 |
100.00% |
|
|
Road Improvements Works of Ghasa-Jomsom Section ( Ch. 0+000-20+000), Beni Jomsom Koralla Road |
कालिगण्डकी कोरिडोर (बेनी जोमसोम कोरोला सडक योजना), जोमसोम, मुस्ताङ |
Rs. 48,10,47,601 |
99.00% |
|
|
Road Improvement with retaining structure, RCC Pavement (ch 0+000 to 10+000) of Benighat Aarughat Sirdibaas Samagaun Ruilanaka,Gorkha |
गाेरखा सडक योजना, गोरखा |
Rs. 35,47,700 |
0.00% |
|
|
Road Furniture works (Specific Maintenance) at Banepa-Sindhuli -Bardibas Road Section |
सूर्यविनायक-धुलिखेल, धुलिखेल-सिन्धुली-बर्दिवास सडक आयोजना, काठमाण्डौ |
Rs. 31,17,340 |
0.00% |
|
|
Roadway Excavation and Construction of Retaining Structures on Lubhu-Bethan-Sachet Chautara-Doramba Road, Ramechhap |
डिभिजन सडक कार्यालय, खुर्कोट |
Rs. 77,57,202 |
50.00% |
|
|
Rigid Pavement Works along Janakpur Basahiya Matihani Sadak Ramjanakipath Dhanusha |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 46,78,922 |
0.00% |
|
|
Construction of Black Topped Road at Hatiya-Burtibang Sector (From Ch 45+190 to Ch 60+700) |
Puspalal (Midhill) Road Project, Parbat |
Rs. 28,15,07,511 |
0.00% |
|
|
Construction of Rupse Khola Bridge (PSC Girder 1 X 35m) Along Beni Jomsom Road, Myagdi |
कालिगण्डकी कोरिडोर (बेनी जोमसोम कोरोला सडक योजना), जोमसोम, मुस्ताङ |
Rs. 5,40,43,570 |
0.00% |
|
|
TRIP/PB/3373124/072/073-03 |
व्यापारिक मर्ग विस्तार योजना / विरगंज-पथलैया खण्ड, पथलैया |
Rs. 42,69,51,735 |
0.00% |
|
|
Bio - Engineering & Structural Works On Koshi Highway ( Bhedetar to Basantapur Section) |
डिभिजन सडक कार्यालय, धनकुटा |
Rs. 29,05,375 |
100.00% |
|
|
Upgrading-Improvement of Sindhulibazar (Sindhuli) - Hetauda (Makawanpur) Road of Dharan Chatara Gaighat Katari Sindhuli Hetauda Road. |
धरान चतरा कटारी गाईघाट सिन्धुली हेटौंडा सडक योजना, मकवानपुर |
Rs. 6,28,53,88,186 |
0.00% |
|
|
(Reactive Maintenanceworks on MalekhuDhadingbesiRoad(NH43) and DhadingbesiSalyamtarArughat Road (NH43)) |
डिभिजन सडक कार्यालय, नुवाकोट |
Rs. 46,44,138 |
0.00% |
|
|
Maintenance Works of Bridge and Related Structure On Prithivi Lokmarg, Byas Marga and Khaireni Bhimad Roads |
सडक डिभिजन, तनहुं |
Rs. 15,01,123 |
0.00% |
|
|
Construction of 6m Span Slab Culvert at Balara-Kharaiyatole Sadak, Sarlahi |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 23,16,889 |
100.00% |
|
|
Earthwork,Rigid Pavement and Structure Works along Deurali School Hudai Panche Danda Hudai Checkmaiesthan Hudai Khayarmara Jane Sadak, Mahottari |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 50,56,337 |
0.00% |
|
|
Reactive Maintenance on Siddartha Highway(Galyang- Ramdi Secion ) |
पुर्वाञ्चल क्षेत्रिय सडक निर्देशनालय, झापा |
Rs. 46,65,898 |
48.00% |
|
|
Mahinathpur-7 Harkathwa-6 Hanuman Chok-Sisautiya Sadak, Sarlahi |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 1,84,94,463 |
100.00% |
|
|
Roadway Excavation,Construction of Gabion/Masonry Wall,Side Drain,HumePipe Cuvert and Gravelling Works in Deurali(Thanti)(chainage 146+000) to Khanadaha(Chainage 156+000) section of Ridi-Balkot-Hanspur-Pyuthan-Surkhet Road |
सालझण्डी सन्धिखर्क ढोरपाटन सडक योजना, अर्घाखांची |
Rs. 99,63,776 |
29.00% |
|
|
Mitra Builders Pvt. Ltd. |
धनगढी-खुटिया-दिपायल-चैनपुर-उरैभन्ज्याङ्ग सडक योजना, बि.पी. नगर, डाेटी |
Rs. 2,88,63,315 |
49.00% |