All Projects
Project |
Office |
Budget |
Progress |
Action |
|---|---|---|---|---|
|
Design & Build of Trishuli River Bridge at Buddhasingh, Nuwakot (PCU-DB-3371574-071/72-15) |
पुल योजना, मध्य क्षेत्र सेक्टर नं. २, काठमाण्डौ |
Rs. 13,85,79,911 |
50.35% |
|
|
Construction of Prestressed Concrete Bridge (4x35m)r over Moranga Khola along North South Lokmarg (Agaiya-Baijapur section), Banke |
सडक डिभिजन, वांके |
Rs. 8,20,35,950 |
0.00% |
|
|
Earthwork for Track opening with structure works from Handak khola (122+000) to Chumsur (143+600) |
उत्तर दक्षिण, कोशी सडक योजना, संखुवासभा |
Rs. 50,92,26,275 |
70.00% |
|
|
Road Improvement Works along Parsa Ga.Pa Boarder ward no. 5,6 hudai Bramhapuri Ga.Pa. no. 6,7 Mohanganj hudai Chaulikha Bazar hudai Bishnu Ga.Pa. ward no. 6 Phenhara hudai Kaudena Ga.Pa. ward no. 2,1 sukchaina Sundarpur Bazar Samm Sadak, sarlahi |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 12,49,99,652 |
85.00% |
|
|
Construction of R.C.C Bridge Over Dudhmati River, Dhanusha |
Janakpur Parikrama, Byparik Margha Bistaar Yojana (Jatahi-Janakpur), Mahottari |
Rs. 14,20,71,857 |
0.00% |
|
|
Construction of Two Webbed RCC bridge in Singhya River Bridge,Gokwaghat Milanchowk Lakhantari Hatimuda Road,Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 6,05,70,893 |
83.07% |
|
|
Recurrent Maintenance & Supply of Construction Materials Works along Chapur Gaur Road, M.R.M. Banke Dhansar Road and Division Yard, Sarlahi, Rautahat |
Unknown |
Rs. 22,44,000 |
85.00% |
|
|
Construction of RCC Bridge over Jadepani River on Vamka-jadepani Road,Kanchanpur |
सडक डिभिजन, कञ्चनपुर |
Rs. 3,39,34,229 |
100.00% |
|
|
Road Construction(Gravelling) Works on Hattisar-Fatepur-Innerwa-Bhaluhi Road, Bara |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 2,74,96,925 |
0.00% |
|
|
Rapti Highway Shitalpati-Khaula Section (Ch 117+000 to 123+000) in Salyan District |
सडक डिभिजन, दाङ्ग |
Rs. 3,63,72,710 |
92.00% |
|
|
Road upgrading works of Bansgadhi-Mainapokhar Road, Bardiya |
सडक डिभिजन, वांके |
Rs. 2,65,77,321 |
0.00% |
|
|
Nainawar-Bhaisapatra-Gehendrra Dangi Ko Ghar Joddai Dangigaun Sammako Dhal Sahitko Sadak |
सडक डिभिजन, दाङ्ग |
Rs. 1,52,12,553 |
85.00% |
|
|
Rigid Pavement Works along Karnali highway at chainage 142+500 to 153+000 (Serighat-Manma Road Section) (RDJML/33701132/077/78-05) |
डिभिजन सडक कार्यालय, जुम्ला |
Rs. 17,66,550 |
0.00% |
|
|
Road Improvement works, TRP, CH 32+000-37+000 |
डिभिजन सडक कार्यालय, चितवन |
Rs. 16,77,585 |
0.00% |
|
|
Danav River, Manmateriya - Naudihawa - Belawa Road |
सडक डिभिजन, वुटवल |
Rs. 8,49,96,688 |
79.00% |
|
|
Andheri Khola bridge Construction work Dharan Panbari Kerabari Sadak Dharan Sunsari |
पुल योजना पूर्वी क्षेत्र सेक्टर नं. १, धरान, सुनसरी |
Rs. 5,48,98,406 |
100.00% |
|
|
Recurrent maintenanace works (Ch 132+000-205+000) |
डिभिजन सडक कार्यालय, जुम्ला |
Rs. 29,20,500 |
0.00% |
|
|
Specific Maintenance Works on Ramche -Grang section of Balaju Trishuli -Dhunche -Syaphrubesi Road(NH18) |
डिभिजन सडक कार्यालय, नुवाकोट |
Rs. 53,22,731 |
0.00% |
|
|
Periodic Maintenance Works (Asphalt concrete overlay) works in East West Highway Mahendra Rajmarga Butwal Kothi section (Chainage 594+000 to 596+185) |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 1,21,74,521 |
85.00% |
|
|
Rehabilitation of Tokha Gurjebhanjyang Road (Chainage 6+600Malung) |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 1,10,15,666 |
0.00% |
|
|
महादेश/राजेश्वरी/पि.टि.आर/अधिकारी जे.भि. |
उत्तर दक्षिण (कालिगण्डकी करिडोर) लोकमार्ग योजना, पाल्पा |
Rs. 3,85,54,890 |
90.00% |
|
|
Approach Road Upgrading (Rock cutting and Structures) Work along Karnali River Bridge Left Side Approach Road, Khulalu, Kalikot |
सडक डिभिजन, प्युठान |
Rs. 4,15,59,644 |
28.61% |
|
|
Earthwork excavation and Structure works along Thori-Bhandara-Malekhu Road, Dhading Section |
डिभिजन सडक कार्यालय, चितवन |
Rs. 59,44,434 |
0.00% |
|
|
Road improvement works on Hile Khalsa Chhintang Pipal Danda Hudai Bhojpur Newar Gaun Sadak Dhankuta |
डिभिजन सडक कार्यालय, धनकुटा |
Rs. 61,73,000 |
0.00% |
|
|
onstruction of Bailey Bridge over Tandrang Khola, Bhimsenthapa Gorkha along Benighat-Aarughat Larkebhanjhyang Road. |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 3,29,06,100 |
83.00% |
|
|
Periodic Maintenance of Mahakali Highway (Attariya-Godawari Section) ch 14+550 to Ch 20+175, Kailali |
सडक डिभिजन, कञ्चनपुर |
Rs. 78,50,113 |
100.00% |
|
|
Design & Build of Three Bridges along Madan Bhandari Highway (Kerabari-Letang Section), Morang. |
मदन भण्डारी राजमार्ग योजना कार्यालय, दमक |
Rs. 38,64,73,451 |
91.00% |
|
|
Upgrading of Gaighat Diktel Roadf Sector,DBST |
गाईघाट दिक्तेल सडक योजना, उदयपुर |
Rs. 27,79,55,446 |
85.00% |
|
|
Construction of Humepipe Culvert, Side Drain and Gravelling works on Masina Cheppang Barahataal-10, Surkhet |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 27,93,009 |
82.58% |
|
|
swarna sagarmatha ring road (Ch. 0+000 - Ch 22+000) |
डिभिजन सडक कार्यालय, हर्कपुर, ओखलढुङगा |
Rs. 12,06,41,819 |
85.00% |
|
|
Rehabilitation Works at Rapti Lokmarg, Khaula-Salle Section Package 8, (Ch 136+000~138+000) |
डिभिजन सडक कार्यालय, चौरजहारी |
Rs. 95,15,918 |
0.00% |
|
|
Construction of Slab Culvert, Retaining, River Training and Pavement Works at Gurba Khola and Pavement Works along Tamghas - Simaltari Road |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 97,02,541 |
83.00% |
|
|
Roadway excavation, retaining structures, side drain, hume pipe culverts, RCC Pavement and Traffic safety works on Beshisahar - Chame Road (Ch: 0+000 to 35+000Km) |
सडक डिभिजन, तनहुं |
Rs. 1,20,57,771 |
0.00% |
|
|
Earthwork,structure works,cross drainage and pavement work |
Puspalal (Midhill) Road Project, Panchthar |
Rs. 30,63,80,172 |
83.29% |
|
|
Reactive maintenance by drain & Patch repair works in Faltude-Budar-Gaira-Syaule-Anarkholi Section of Mahakali Highway. |
सडक डिभिजन, डोटी |
Rs. 49,96,612 |
90.00% |
|
|
Road Protection works at Ganeshthan Mandir, Hetauda-Bhainse Section (TRP) |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 48,36,120 |
0.00% |
|
|
Road Construction works Deurali - Phalate- Janaki ma.vi.-Ektappa-Gajumukhidham-mahamai-Palase-Domukha Road ,Ilam |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 2,56,80,405 |
0.00% |
|
|
Roadway Improvement(Blacktop and structure) Works |
Unknown |
Rs. 1,81,79,500 |
83.00% |
|
|
Roadway Protection works along karnali Highway Behani Khola to Shimle Ghat Section (Ch 163+000 to 173+500) Kalikot |
सडक डिभिजन, डोटी |
Rs. 8,44,23,245 |
11.75% |
|
|
Construction of Basdiluwa - Amuwa Road in Rupandehi |
सडक डिभिजन, वुटवल |
Rs. 62,44,073 |
0.00% |