Construction Of Drain works along Morang Biratnagar 11 Alka Tole Deurali Marg Drain Sahit Kalopatre, Biratnagar 5 Radharaman Marg Tatha Budhihari Chowk Barju Simana Keshaliya Nadi Duhabi Sunsari Sadak, Morang and Ban Karyalaya Aasan Tole Prabesh Marg Hudai Rani Biratnagar 6 lane Jodne Sadak, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 91,96,834 |
89.17% |
|
|
Construction of Raghughat Bridge (PSC Girder, 1x40 m) over Raghughat Khola along Beni Jomsom Koralla Road |
कालिगण्डकी कोरिडोर (बेनी जोमसोम कोरोला सडक योजना), जोमसोम, मुस्ताङ |
Rs. 5,53,39,667 |
85.00% |
|
|
Daramkhola Pul Arlangkota1 ra Righa 6 jodhne |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 5,85,95,487 |
0.00% |
|
|
Construction of Motorable Prestress Concrete Bridge at Dhungre Khola (Chainage 25+000) |
सालझण्डी सन्धिखर्क ढोरपाटन सडक योजना, अर्घाखांची |
Rs. 3,41,52,078 |
0.00% |
|
|
Specific Maintenance of East West Highway (Ch 982+000 - Ch 1027+000) Kanchanpur |
सडक डिभिजन, कञ्चनपुर |
Rs. 30,17,234 |
100.00% |
|
|
Upgrading/Widening of Roads to six lane standards chainage 6+200 to 9+000. |
ब्यापारिक मार्ग बिस्तार आयोजन, बेलहिया बुटवल सडक , रुपन्देही |
Rs. 43,19,85,670 |
0.00% |
|
|
Maintenance of Hatiya Burti bang Road Section (Turture,Gargare) |
Puspalal (Midhill) Road Project, Parbat |
Rs. 2,19,13,522 |
90.00% |
|
|
म.रा.मा. (भालुबाङ्ग - सिसहनिया सडक) दाङ्ग । |
सडक डिभिजन, दाङ्ग |
Rs. 2,27,01,884 |
90.00% |
|
|
Periodic Maintenance Works on Surkhet-Ranimatta- Dailekh Road Ch.(22+000 to 25+000) & Ch.(64+000 to 65+000) |
सडक डिभिजन, सुर्खेत |
Rs. 2,45,29,420 |
88.67% |
|
|
Gaudikhola Bridge Construction |
Road Division, Baglung |
Rs. 3,07,61,416 |
90.00% |
|
|
Recurrent Maintenance Work along Rapti Rajmarg (Chordanda, Boarder of Dang and Salyan District-Khulapass Section Ch.km 46+600 to km 135+00) in Salyan District |
सडक डिभिजन, दाङ्ग |
Rs. 61,93,437 |
60.00% |
|
|
Bridge construction works over Hapurkhola along Ghorahi-Ankha hospital Road in Dang district. |
सडक डिभिजन, दाङ्ग |
Rs. 5,61,18,119 |
0.00% |
|
|
Upgrading/Improvement of Gaindakot -Rampur-Pipaldanda Road (CH 0+000 to 131+700) of Kaligandaki Corridor |
उत्तर दक्षिण (कालिगण्डकी करिडोर) लोकमार्ग योजना, पाल्पा |
Rs. 4,88,54,61,714 |
90.00% |
|
|
Construction of Prestressed RCC Bridge over Sarju khola along Bhurigaun Gulariya Murtiya Road |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, वाके |
Rs. 6,05,54,596 |
0.00% |
|
|
Reactive Maintenance works along Madichaur DB (Rolpa-Pyuthan border) to liwang NH 53-004 Road(CH65+510 to 103+920) |
Road Division, Pyuthaan |
Rs. 82,54,750 |
80.00% |
|
|
Road Widening, Gabion wall Hume Pipe Culvert, Masonry Drain and DBST Construction works |
सालझण्डी सन्धिखर्क ढोरपाटन सडक योजना, अर्घाखांची |
Rs. 6,40,11,119 |
0.00% |
|
|
Periodic Maintenance of Dhulikhel- Sindhuli-Bardibas Highway(H13), Nepalthok- Khurkot Section (Km 76+000-89+500) & (Km 94+000-100+500 |
सूर्यविनायक-धुलिखेल, धुलिखेल-सिन्धुली-बर्दिवास सडक आयोजना, काठमाण्डौ |
Rs. 10,33,81,345 |
100.00% |
|
|
Road Upgrading Works along Chame Khansar Road, Manang |
सडक डिभिजन, तनहुं |
Rs. 1,53,98,080 |
0.00% |
|
|
मान खोला पुल, नेपालगंज-गुलरिया सडक, 2. भादा खोला पुल, नेपालगंज-गुलरिया सडक |
पुल योजना, पश्चिम क्षेत्र सेक्टर नं. ३, वांके |
Rs. 12,55,60,177 |
100.00% |
|
|
शितलपाटी खौलापास सडक |
सडक डिभिजन, दाङ्ग |
Rs. 21,03,093 |
0.00% |
|
|
Construction of Road Structures,Cross Drainage and Earthworks from Bohang(Ch.180+000)to Dhorpatan(Ch.195+000)section along Saljhandi-Sandhikharka-Dhorpatan Road |
सालझण्डी सन्धिखर्क ढोरपाटन सडक योजना, अर्घाखांची |
Rs. 92,96,887 |
0.00% |
|
|
Upgrading and Improvement works on Dharedhunga-Aarubutta-Ghormare-Thamu-Rabesi-Supa Deurali Road, Arghakhanchi |
सडक डिभिजन, कपिलवस्तु |
Rs. 1,01,55,733 |
0.00% |
|
|
Construction of Prestressed RCC Bridge over Kodhiya Khola along Nasara Dang. |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, वाके |
Rs. 13,13,78,582 |
0.00% |
|
|
Road Construction Works on Basai Fatai Matiya Bandtal Khiriya Butabari Belauri Daiji Road, Kanchanpur |
सडक डिभिजन, कञ्चनपुर |
Rs. 1,87,29,028 |
100.00% |
|
|
Roadway Improvement work along NagmaGadi Road (ch 72+000-93+000) in mugu District |
डिभिजन सडक कार्यालय, जुम्ला |
Rs. 4,92,47,244 |
19.03% |
|
|
Upgrading of Suvitar-Aarubastar section, Dhading |
डिभिजन सडक कार्यालय, चितवन |
Rs. 47,35,542 |
0.00% |
|
|
Ghamaha-parsawalPaschimGanganagar Road and SainamainaNa.ParaSuddhodanGaupalikaJodneRanibagiya-Parauta-FarsatikarSadak,Rupandehi |
सडक डिभिजन, वुटवल |
Rs. 91,55,942 |
100.00% |
|
|
Recurrent maintenance (Drain construction works) at Bhumah iParasi Bhairahawa Road |
सडक डिभिजन, पाल्पा |
Rs. 1,11,37,297 |
100.00% |
|
|
Construction of Bire Khola Bridge (RCC1X20m), Nuwakot |
गल्छी त्रिशुली मैलुङ्ग स्याफ्रुवेशी रसुवागढी सडक योजना, विदुर नुवाकोट |
Rs. 2,96,83,274 |
57.00% |
|
|
Galeswor-piple-Mowaphat-dagnam-Chimkhola-Kuene-Mangale Road,Myagdi |
Road Division, Baglung |
Rs. 67,99,294 |
90.00% |
|
|
Construction of Patthardanda(Siddhartha Rajmarga) - Amuwa Road in Rupandehi |
सडक डिभिजन, वुटवल |
Rs. 87,52,129 |
88.00% |
|
|
Road Upgrading Works on Banepa Panauti Khopasi Road |
सडक डिभिजन, भक्तपुर |
Rs. 3,32,19,371 |
100.00% |
|
|
Design & Build of Two Bridges along Madan Bhandari Highway (Dharan-Kerabari Section), Morang. |
मदन भण्डारी राजमार्ग योजना कार्यालय, दमक |
Rs. 15,91,09,026 |
100.00% |
|
|
Improvement Works of Baraghat Paldanda Triveni Road (0+000~12+500) |
सडक डिभिजन, वुटवल |
Rs. 17,55,46,496 |
0.00% |
|
|
Haleshi Diktel Road Project, Package 1 (HD-1) |
आयोजना निर्देशनालय, ए.डि.वि., विशालनगर, काठमाण्डौ |
Rs. 13,73,90,882 |
100.00% |
|
|
Upgrading of Naya Road Barathwa Madhuwani Road, (Naya Road to Hirapur Bazaar section) Ch: 0+000 to 21+000 |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, जनकपुर, धनुषा |
Rs. 35,46,78,163 |
0.00% |
|
|
Construction of Guigad Steel Truss Bridge at Bajura |
डिभिजन सडक कार्यालय, साँफेवगर, अछाम |
Rs. 5,27,54,097 |
95.00% |
|
|
राप्ती राजमार्ग अमिलिया तुलसीपुर सडक |
सडक डिभिजन, दाङ्ग |
Rs. 12,00,418 |
0.00% |
|
|
Reactive Maintenance Works Along Lamahi- Ghorahi-Tulsipur (Lamahi-Kuirepani Section) Road in Dang District |
सडक डिभिजन, दाङ्ग |
Rs. 63,84,363 |
85.00% |
|
|
Road Improvement Works at Resunga (Patauti-Durgaphat-Simichour-Resunga Road) |
सडक डिभिजन, भक्तपुर |
Rs. 69,66,704 |
60.00% |