All Projects
Project |
Office |
Budget |
Progress |
Action |
|---|---|---|---|---|
|
राप्ती नदीमा पक्की पुल, सतविरया र कालिपरुवा बीच |
पुल योजना, पश्चिम क्षेत्र सेक्टर नं. ३, वांके |
Rs. 58,84,57,168 |
100.00% |
|
|
Road Improvement Works of Betrawati-Dhunche-Syaprubesi Road, NH18,Rasuwa |
मध्यमाञ्चल क्षेत्रिय सडक निर्देशनालय, काठमाण्डौ |
Rs. 4,46,12,452 |
100.00% |
|
|
Road Widening and upgrading of Nayabuspark mangaltar saakhu sadak bhaktapur |
सडक डिभिजन, भक्तपुर |
Rs. 11,59,719 |
0.00% |
|
|
Road Improvement Works along Bharatiya Sima Sunauli dekhi Basantapur Butwal Dhago Karkhana Road, Rupandehi |
सडक डिभिजन, वुटवल |
Rs. 1,33,24,625 |
100.00% |
|
|
Road Rehabilitation works on Chaukhutte-Sanfe-Mangalsen Road Section |
डिभिजन सडक कार्यालय, साँफेवगर, अछाम |
Rs. 3,21,44,708 |
98.58% |
|
|
Road Upgrading Works On Gaighat Galyang Road, Tanahun |
सडक डिभिजन, तनहुं |
Rs. 93,59,200 |
0.00% |
|
|
Potholes Maintenance Works with loose gravel on earthen road along Bheri Corridor-Rimna to Tallubagar, (Ch:36+000 to 40+000) |
डिभिजन सडक कार्यालय, चौरजहारी |
Rs. 5,72,572 |
0.00% |
|
|
Upgrading of Barabise 5 Jambu sigarche khadadevi Mandir Kaseri Bugam Sotang BagJi Tengthhali Gaati Bayeuli Kunda Sadak, Sindhupalchok |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 46,84,061 |
0.00% |
|
|
Construction of Structures on Sanfebagar Rakse Martadi Kolit Road Section (NH63) |
डिभिजन सडक कार्यालय, साँफेवगर, अछाम |
Rs. 2,13,37,370 |
98.00% |
|
|
तु.उ.म.न.पा. ८ कृष्णमन्दिर देखी शहिद स्मृती प्रा.ली. टिकरी हुदै वडा नं १० राईखल्यान जोड्ने सडक |
सडक डिभिजन, दाङ्ग |
Rs. 19,91,955 |
0.00% |
|
|
Improvement of side track at Nakhu dobato |
काठमाडौं चक्रपथ सुधार योजना, ललितपुर |
Rs. 1,21,00,951 |
0.00% |
|
|
(Traffic safety works At Gurje Chhahare Road ,Nuwakot.) |
यान्त्रिक कार्यालय, सिराहा |
Rs. 20,90,050 |
97.15% |
|
|
Chandranigahpur Ring Road, Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 44,10,250 |
0.00% |
|
|
Roadway Excavtion And Structural Works on saulibazar -Bardakot -Mityal road Palpa. |
सडक डिभिजन, पाल्पा |
Rs. 42,79,851 |
0.00% |
|
|
Recurrent Maintenance Works on Vyas Marga (Damauli-Jyamiretar-Neupanibesi-Bhorletar Section) (Ch 0+000 to 28+800) |
Unknown |
Rs. 32,40,374 |
98.00% |
|
|
Construction Of Pre-Stress RCC Girder Bridge Over Rangunkhola along laldhunga-Katal Road,Dadeldhura |
सडक डिभिजन, डोटी |
Rs. 10,88,36,488 |
100.00% |
|
|
Road Construction Works on sahid Basudev Marg, Makwanpur |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 2,36,31,363 |
0.00% |
|
|
Road Upgrading Works on Bhutekhahare Corridor Gaudol Jyotilingeswor Pakunepati dakshinkali,Karpati 4 Bhaktapur |
सडक डिभिजन, भक्तपुर |
Rs. 39,15,025 |
100.00% |
|
|
Drainage works with structural steel grates along Siddhartha Highway. |
सडक डिभिजन, पाल्पा |
Rs. 11,96,320 |
100.00% |
|
|
Rehabilitation works on Surkhet- Jumla Road, Dailekh |
सडक डिभिजन, सुर्खेत |
Rs. 1,06,13,750 |
100.00% |
|
|
Road Improvement works of Finamtar Jaubhari Bhachhek Road (Ch 7+000 to 16+000) |
गाेरखा सडक योजना, गोरखा |
Rs. 1,00,39,854 |
0.00% |
|
|
Roadway Upgrading and Blacktop Works on Besisahar Bakhrejagat Nalma Rambazar Hasid Harikala Road , Lamjung (2+500 to 2+757 ). |
सडक डिभिजन, तनहुं |
Rs. 36,90,550 |
0.00% |
|
|
Upgrading of road with roadway excavation including Back cutting and grade cutting and Structural works in Dhaulakot and Korktya Bhir, |
दार्चुला टिङकर सडक योजना, दार्चुला |
Rs. 81,40,205 |
0.00% |
|
|
Construction of Black Top Road with Cross Drainage Structures on Gorusinghe- Sandhikharka Road (11+000 to 13+700) |
सडक डिभिजन, कपिलवस्तु |
Rs. 5,47,99,455 |
100.00% |
|
|
Maintenance Works along Mahendra Rajmarg (Ch. 236+620-252+000) |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 63,23,966 |
0.00% |
|
|
Assembling and Disassembling of 50m span, single lane Balley Bridge. |
गाईघाट दिक्तेल सडक योजना, उदयपुर |
Rs. 69,37,852 |
100.00% |
|
|
Road Saftey Works in Jay Prithivi Bahadur Singh Marg (NH-64) . |
सडक डिभिजन, बैतडी |
Rs. 14,33,500 |
0.00% |
|
|
Recurrent Maintenance works on Chhinchu Jajarkot Road Ch. (30+000-45+000) |
सडक डिभिजन, सुर्खेत |
Rs. 21,77,500 |
97.20% |
|
|
Construction and Maintenance of Drain and Retaining Structures on Byas Marga, Tanahun |
सडक डिभिजन, तनहुं |
Rs. 58,42,510 |
97.00% |
|
|
Pavement Work including Cross drainage and retaining Structures along Barmaniya Chowk dekhi Gherabani Chowk samma jane Sadak, Sundar Haraincha, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 1,76,48,017 |
98.00% |
|
|
Taulihawa-08, Dohoni Pachera Road, Kapilvastu |
योजना तथा अनुगमन महाशाखा (भूवातावरण तथा सामाजिक शाखा) |
Rs. 63,81,985 |
100.00% |
|
|
Blacktop & Cross Drainage Works at Damak-9 Kaatheline Baat Dipeni Marga Hundai Damak-4 & 10 Jodne Road, Jhapa |
डिभिजन सडक कार्यालय, झापा |
Rs. 58,60,464 |
82.00% |
|
|
Upgrading of Bhardaha Kanchanpur Rajbiraj Balan Road, Saptari, 20+000 to 46+580 |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, सुनसरी |
Rs. 1,09,81,21,251 |
92.00% |
|
|
Construction of RCC pavement, Retaining structures and slab culvert in Manang district (Tal link road) |
डुम्रे बेसीशहर चामे सडक योजना, बेसीशहर लमजुङ |
Rs. 83,54,687 |
0.00% |
|
|
Road Upgrading Works on ARM (Dhulikhel Section) |
सडक डिभिजन, भक्तपुर |
Rs. 90,97,465 |
100.00% |
|
|
Reactive Maintenance Works on Pipra-Pakadi-Chakar Chauda Road & Hulaki Rajmarga (NH-05) Section |
सडक डिभिजन, कञ्चनपुर |
Rs. 33,60,005 |
100.00% |
|
|
Rehabilitation Works (Rigid pavement (RCC) along Hetauda-Chure-Pathalaiya Section of MRM |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 1,11,34,999 |
0.00% |
|
|
Construction of Pre-stressed RCC Bridge over Baniyani Khola (2 No*40 m Span, Total Length 84.1 m), along Mechi - Ratuwa, Hulaki Road |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, सुनसरी |
Rs. 6,14,83,329 |
100.00% |
|
|
Upgrading of Roadway with Blacktop Surface and Structural works(CH 0+000 to 13+400) |
धनगढी-खुटिया-दिपायल-चैनपुर-उरैभन्ज्याङ्ग सडक योजना, बि.पी. नगर, डाेटी |
Rs. 16,38,85,397 |
97.77% |
|
|
Periodic Maintenance Works along Karnali Highway ( Ch. 205+000 to 236+000), in Jumla |
डिभिजन सडक कार्यालय, जुम्ला |
Rs. 2,79,59,840 |
0.00% |