All Projects

Project
Office
Budget
Progress
Action
Default Image

Construction of RCC Drain along Sunbarsi napako simana sukrabare hudai pa. bhotubabu chowk sadak,morang

डिभिजन सडक कार्यालय, मोरङ

Rs. 52,40,960

0.00%

Default Image

Construction of RCC Bridge over mahadev khola....

डिभिजन सडक कार्यालय, काठमाण्डौ

Rs. 3,33,27,974

0.00%

Default Image

Construction of RCC Bridge over mahadev khola

डिभिजन सडक कार्यालय, काठमाण्डौ

Rs. 3,33,85,496

0.00%

Default Image

Construction of RCC Bridge over Tultule Nala Bridge (1X25 m), Krishnapur, Kanchanpur

सडक डिभिजन, कञ्चनपुर

Rs. 2,57,20,484

0.00%

Default Image

Construction of RCC Bridge over Maleriya Nala, Dodhara Chandani-02, Kanchanpur

सडक डिभिजन, कञ्चनपुर

Rs. 3,41,50,658

100.00%

Default Image

Construction of RCC Bridge over Lukum River

शहीद मार्ग सडक योजना, रोल्पा

Rs. 2,94,14,771

0.00%

Default Image

Construction of RCC Bridge over Khura Khola Along Surkhet Jumla Road at Dailekh District

काठमाण्डौ भक्तपुर सडक विस्तार योजना, काठमाण्डौ

Rs. 5,59,16,921

0.00%

Default Image

Construction of RCC Bridge over Gyamirekhola , Budhanilkhantha,1,4

डिभिजन सडक कार्यालय, काठमाण्डौ

Rs. 1,84,55,548

0.00%

Default Image

Construction of RCC Bridge over Ghatte Khola, Shakharapur

डिभिजन सडक कार्यालय, काठमाण्डौ

Rs. 2,12,29,915

0.00%

Default Image

Construction of RCC Bridge over Chawang River

शहीद मार्ग सडक योजना, रोल्पा

Rs. 1,44,80,455

0.00%

Default Image

Construction of RCC Bridge for Harkakathawa River, Naya Road Madhuwani Road, Sarlahi

हुलाकी राजमार्ग आयोजना, योजना कार्यालय, जनकपुर​, धनुषा

Rs. 1,90,76,520

0.00%

Default Image

Construction of RCC Bridge for Dhankaul, along Naya Road Madhuwani Road, Sarlahi

हुलाकी राजमार्ग आयोजना, योजना कार्यालय, जनकपुर​, धनुषा

Rs. 1,00,68,598

0.00%

Default Image

Construction of RCC Bridge [1x25m] over Bahubali Jharana, Rasuwa

योजना तथा अनुगमन महाशाखा (योजना अनुगमन तथा मुल्यांकन शाखा)

Rs. 3,38,94,801

0.00%

Default Image

Construction of RCC Bridge [1x20m] over Sano Bharkhu Khola, Rasuwa

योजना तथा अनुगमन महाशाखा (भूवातावरण तथा सामाजिक शाखा)

Rs. 4,09,22,652

0.00%

Default Image

Construction of RCC Bridge [1x15m] overTrishuli 3A Dam-3 (Ghatte Khola), Rasuwa

Unknown

Rs. 4,19,01,980

0.00%

Default Image

Construction of RCC Bridge Over Thiwa Khola along Dovan Olangchunggola Road, Taplejung

उत्तर दक्षिण (मुलघाट दोभान ओलाङ्चुङगोला खण्ड​) सडक योजना, ताप्लेजुङ्ग

Rs. 3,55,66,605

0.00%

Default Image

Construction of RCC Bridge Over Seuti Khola Along Koshi Highway, Sunsari District

डिभिजन सडक कार्यालय, मोरङ

Rs. 4,86,46,706

0.00%

Default Image

Construction of R.C.C. Drain works along Chandranigahpur Gaur Road, Rautahat

सडक डिभिजन, पोखरा

Rs. 56,33,116

0.00%

Default Image

Construction of Prestressed RCC bridge over Bijaypur Khola at Kafalghari, Kaski

सडक डिभिजन, पोखरा

Rs. 5,58,12,508

0.00%

Default Image

Construction of Prestressed RCC bridge over Bheri between Ragda jajarkot and Syalakhadi Rukum districts.

डिभिजन सडक कार्यालय, चौरजहारी

Rs. 9,11,87,462

0.00%

Default Image

Construction of Prestressed RCC bridge over Belauti Nadi, Parwaha Station dekhi Bharariya Border ma parne, Dhanusha

डिभिजन सडक कार्यालय, धनुषा

Rs. 5,42,30,634

0.00%

Default Image

Construction of Prestressed Concrete (PSC) Post-tensioned 2 webbed slab Bridge on Ghyampe Khola

सूर्यविनायक-धुलिखेल​, धुलिखेल-सिन्धुली-बर्दिवास सडक आयोजना, काठमाण्डौ

Rs. 4,52,12,938

0.00%

Default Image

Construction of Prestressed Concrete (PSC) Post-tensioned 2 webbed slab Bridge on Bhyakure Khola

सूर्यविनायक-धुलिखेल​, धुलिखेल-सिन्धुली-बर्दिवास सडक आयोजना, काठमाण्डौ

Rs. 4,60,71,036

0.00%

Default Image

Construction of Prestressed Concrete Bridge over Mechi Khola (1 6 No*35 m Span, Total Length 2565 m), along Mechi - Ratuwa Sadak, Jhapa

हुलाकी राजमार्ग आयोजना, योजना कार्यालय, सुनसरी

Rs. 33,06,95,188

0.00%

Default Image

Construction of Prestressed Bridge (40m x 2span) over Churling River Bridge, Sarikhet in Makawanpur District

डिभिजन सडक कार्यालय, मकवानपुर

Rs. 5,74,23,355

0.00%

Default Image

Construction of Prestressed (1*35) Bridge over Nawa Khola alonng Arubote-Limba Road, Panchthar

डिभिजन सडक कार्यालय, ईलाम

Rs. 4,39,53,380

0.00%

Default Image

Construction of Plumb and Gabion Works on Khalanga-Panchkatiya Road, Jajarkot

डिभिजन सडक कार्यालय, चौरजहारी

Rs. 1,65,51,816

0.00%

Default Image

Construction of Pipe culvert & Gabion wall Structures along Rajgang Sinbari 1 Sitaram chaudhary ko ghar hudai satarjhoda Sadak, Sunsari

डिभिजन सडक कार्यालय, मोरङ

Rs. 43,23,196

0.00%

Default Image

Construction of Pipe Culvert and Pavement work along Jhakan Jhora Madhesh Pakali Road, Sunsari

डिभिजन सडक कार्यालय, मोरङ

Rs. 56,67,211

0.00%

Default Image

Construction of Patihalno-Chipurkabae Nanigad Bridge Ajaymeru Ga. Pa.-4, Dadeldhura

सडक डिभिजन, डोटी

Rs. 4,03,16,362

0.00%

Default Image

Construction of Pati khola RCC Bridge (Span Length=1x15m) along Rudrabeni Wamitaksar Road Gulmi

तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी

Rs. 2,27,82,966

0.00%

Default Image

Construction of Pathroda Khola Bridge along Ghatal Chirkitte Road, Dadeldhura

सडक डिभिजन, डोटी

Rs. 3,61,85,846

0.00%

Default Image

Construction of PanchkhalPalanchowkBhagawati Road (F071), Kavre

सडक डिभिजन, भक्तपुर

Rs. 69,62,210

0.00%

Default Image

Construction of PSC Bridge [1x40m] over Bimali Khola, Rasuwa

योजना तथा अनुगमन महाशाखा (भूवातावरण तथा सामाजिक शाखा)

Rs. 3,77,81,138

0.00%

Default Image

Construction of PSC Bridge [1x35m] over Haku Khola, Rasuwa

योजना तथा अनुगमन महाशाखा (सडक सुरक्षा तथा ट्राफिक शाखा)

Rs. 3,82,32,771

0.00%

Default Image

Construction of PSC Bridge (3*30m span) over Chhinchu Khola, Bheriganga-2, Surkhet

डिभिजन सडक कार्यालय, काठमाण्डौ

Rs. 15,64,23,860

0.00%

Default Image

Construction of Overhead Traffic Sign (Gantry ) along East West Highway From west of Butwal and all SRN Roads

योजना तथा अनुगमन महाशाखा (सडक सुरक्षा तथा ट्राफिक शाखा)

Rs. 1,07,89,950

0.00%

Default Image

Construction of Overhead Traffic Sign (Gantry ) along East West Highway

योजना तथा अनुगमन महाशाखा (सडक सुरक्षा तथा ट्राफिक शाखा)

Rs. 1,43,07,862

0.00%

Default Image

Construction of Office Quarter building at Road Division Palpa, Tansen

डिभिजन सडक कार्यालय, धनुषा

Rs. 73,20,854

0.00%

Default Image

Construction of Multicell Bridge at Sano Bhuwari connecting Surahawa & Khaira Village

सडक डिभिजन, वुटवल

Rs. 4,35,02,029

0.00%