All Projects

Project
Office
Budget
Progress
Action
Default Image

Construction of Multi-cell Box culvert at Thengaha River along Mirchaiya Katari Road, Udaypur.

सडक विभाग, काठमाण्डौ

Rs. 3,87,13,490

0.00%

Default Image

Construction of Motorable Bailey Bridge with RCC foundation over Timangkhola in Manang District.

सडक डिभिजन, तनहुं

Rs. 2,26,68,830

0.00%

Default Image

Construction of Khanche Bhachok river Bridge, Lamjung (RCC 1*20 m)

डुम्रे बेसीशहर चामे सडक योजना, बेसीशहर लमजुङ

Rs. 3,42,10,907

0.00%

Default Image

Construction of Kajala Khola RCC Bridge, Ratuwamai, Morang

डिभिजन सडक कार्यालय, मोरङ

Rs. 7,49,43,925

0.00%

Default Image

Construction of Janakpur Dhalkebar Irrigation Canal

Janakpur Parikrama, Byparik Margha Bistaar Yojana (Jatahi-Janakpur), Mahottari

Rs. 61,50,84,417

54.13%

Default Image

Construction of HosteKhola Bridge along with Bahunepati-Dolaghat-section of Middle Highway, Sindhupalchock(RCC1*15m)

Puspalal (Midhill) Road Project, Kavrepalanchok

Rs. 3,77,76,912

0.00%

Default Image

Construction of Hoste Khola Bridge (RCC 1*15m) along Bahunepati-Dolalghat Section, Sindhupalchok

Puspalal (Midhill) Road Project, Kavrepalanchok

Rs. 3,73,34,435

0.00%

Default Image

Construction of Gwarko Panauti Dandapari Road, Kavre.

सडक डिभिजन, भक्तपुर

Rs. 60,44,645

0.00%

Default Image

Construction of Gravel and Box Culvert Works along Inaruwa(railway Station) Kathal Banarjhula Sagara Hulaki Jodne Sadak(Railway station to school Section)

डिभिजन सडक कार्यालय, धनुषा

Rs. 18,21,271

0.00%

Default Image

Construction of Gravel Road With Cross Drainage Structure along Jahada-2 Harinagar,Muslim Tole Hudai Birpur sadak,Morang

डिभिजन सडक कार्यालय, मोरङ

Rs. 50,18,624

0.00%

Default Image

Construction of Gadadeu Tngra River RCC Bridge, Gadhi Ga.Pa.-2 Sunsari

डिभिजन सडक कार्यालय, मोरङ

Rs. 7,02,80,776

0.00%

Default Image

Construction of Gabion works in Those Falamkhani Approach Road

डिभिजन सडक कार्यालय, खुर्कोट

Rs. 3,01,000

0.00%

Default Image

Construction of Embankment, Gravel work, RCC Box culvert & Humepipe Culvert along Tarapatti dekhi Uttimpur hudai Laliya Bhatahi sadak(Bhatahi khand), Dhanusha

डिभिजन सडक कार्यालय, धनुषा

Rs. 2,69,24,989

0.00%

Default Image

Construction of Earthwork, Gravel and Rcc Works along Ja.U.M.N.Pa. wada no. 19 highway Mahabir Mandir dekhi Jamuniya hundai Kumhrauda Bagewa Vangaha Baniniya Nahar sadak, Dhanusha (RDJKR/33701143/077-78/52)

डिभिजन सडक कार्यालय, धनुषा

Rs. 88,58,375

0.00%

Default Image

Construction of Earthwork, Blacktop and Structure Works along Sahorwa Dekhi Matihani Bazzar Samma Sadak (Krishnapath),Mahottari.

डिभिजन सडक कार्यालय, धनुषा

Rs. 46,49,304

0.00%

Default Image

Construction of Drain along Duhabi-Inaruwa-Kaptanganj Road (Debanhjang Area)

डिभिजन सडक कार्यालय, मोरङ

Rs. 57,25,571

0.00%

Default Image

Construction of Doleshwor-Ashapuri-Paramhansa Road, Bhaktapur

सडक डिभिजन, भक्तपुर

Rs. 29,24,694

0.00%

Default Image

Construction of Dhobi Khola Bridge (RCC1X15m), Nuwakot

गल्छी त्रिशुली मैलुङ्ग स्याफ्रुवेशी रसुवागढी सडक योजना, विदुर नुवाकोट

Rs. 2,18,65,514

0.00%

Default Image

Construction of Daunte Khola Bridge along Bhojpur-Diktel, Khotang

Puspalal (Midhill) Road Project, Kavrepalanchok

Rs. 2,54,62,640

0.00%

Default Image

Construction of Cross Drainage Works on Tanakpur Link Road

सडक डिभिजन, कञ्चनपुर

Rs. 1,46,93,211

0.00%

Default Image

Construction of Chippe Khola bridge along Bhojpur-Diktel road section of Midhill Highway(RCC1x20m), Khotang

Puspalal (Midhill) Road Project, Kavrepalanchok

Rs. 3,05,80,137

0.00%

Default Image

Construction of Chayamasingh Nala Banepa Road (F097), Kavre

सडक डिभिजन, भक्तपुर

Rs. 64,79,399

0.00%

Default Image

Construction of Bridge over Yangar Khola in Hilsa - Simikot Road Section, Humla

हिल्सा सिमिकोट सडक योजना, हुम्ला

Rs. 4,16,27,213

0.00%

Default Image

Construction of Bridge over Thali Brigde along Bariyapur-Paterwa Road,Bara

हुलाकी राजमार्ग आयोजना, योजना कार्यालय, वीरगंज, पर्सा

Rs. 2,19,25,913

0.00%

Default Image

Construction of Bridge over Bagmati River in Rautahat District

हुलाकी राजमार्ग आयोजना, योजना कार्यालय, वीरगंज, पर्सा

Rs. 31,76,19,003

0.00%

Default Image

Construction of Blacktopped road along Inaruwa Kaptangunj Sadak

डिभिजन सडक कार्यालय, मोरङ

Rs. 5,91,58,589

0.00%

Default Image

Construction of Blacktopped Road including Drainage Structures along Laxminiya-Sohal Jahada 4-Rajbanshi tole hudai Kadmaha hudai Nocha sima Sadak, Morang

डिभिजन सडक कार्यालय, मोरङ

Rs. 59,46,413

0.00%

Default Image

Construction of Blacktopped Road including Drain works in Belbari Na.Pa.1 ko Lohandrakhola-Nakshalbari-Letang Na.pa, 7 Phadani Hudai Rajarani Jodne Belbari-Phadni-Budhabare-Sadak Morang

डिभिजन सडक कार्यालय, मोरङ

Rs. 40,90,632

0.00%

Default Image

Construction of Blacktopped Road at Kohavara Gwaaldubba Mahavara Sadak(Ch 9+947-11+607 Km)

डिभिजन सडक कार्यालय, झापा

Rs. 1,07,25,907

0.00%

Default Image

Construction of Blacktopped Road at Damak Chiyadokan-Jadaha-Setumari-Baalubathan-Gauradaha Road

डिभिजन सडक कार्यालय, झापा

Rs. 1,01,64,308

0.00%

Default Image

Construction of Blacktopped Road at Damak Chiyadokan-Jadaha-Setumari-Baalubathan-Gauradaha Road

डिभिजन सडक कार्यालय, झापा

Rs. 1,02,71,646

0.00%

Default Image

Construction of Blacktop, Msonary drain, Plum wall, Retaining structures and Rigid pavement works at Mirchaiya (Ma.Ra.Ma.) -Katari- Ghurmi Sadak (Katari-Ghurmi Section_Package_3), Betini Bazar, Gahun Bari Bazar, Bansbari Bazar, Lekhani Bazar - 3000 m and Ghurmi Bazar - 204m rigid pavement and Lekhani - Ghurmi : 3500 m Sub Base

ओखलढुङगा हिलेपानी दिक्ततेल सडक योजना,ओखलढुङगा

Rs. 4,43,33,693

0.00%

Default Image

Construction of Blacktop works along Haripurwa Na.Pa.-6 dekhi Ishwarpur Na.Pa. ward no. 15 mirchaiya Bazar Haripurwa Sadak, Sarlahi

योजना तथा अनुगमन महाशाखा (योजना अनुगमन तथा मुल्यांकन शाखा)

Rs. 55,84,267

0.00%

Default Image

Construction of Blacktop works along Barahathwa Nagarpalika Hirapur dekhi Sahidpur hudain Hajariya Rajghat Seema Sammako Sadak, Sarlahi

योजना तथा अनुगमन महाशाखा (HMIS तथा ICT शाखा)

Rs. 51,87,706

0.00%

Default Image

Construction of Blacktop Road Works on Bharatpur Mahanagar Ring Road (Package-3)

डिभिजन सडक कार्यालय, चितवन

Rs. 2,97,87,631

0.00%

Default Image

Construction of Blacktop Road Works on Bharatpur Ma.Na.Pa. 27,28 Telauri chowk - Golaghat Road, Chitwan

डिभिजन सडक कार्यालय, चितवन

Rs. 1,31,55,755

0.00%

Default Image

Construction of Blacktop Road Works Connecting Bharatpur to Madi, Chitwan

डिभिजन सडक कार्यालय, चितवन

Rs. 1,23,03,943

0.00%

Default Image

Construction of Blacktop (Asphalt Concrete) Road & RCC Box Culvert along Jamunibas Ekleshwar sadak, Dhanusha

डिभिजन सडक कार्यालय, धनुषा

Rs. 48,48,553

0.00%

Default Image

Construction of Blacktop (Asphalt Concrete) & RCC Box Culvert along Construction of Blacktop (Asfalt) RCC Box Culvert at Khajuri Ma.Vi. Janaknandani Jhijha Thadi Sadak, Dhanusha

डिभिजन सडक कार्यालय, धनुषा

Rs. 59,96,870

0.00%

Default Image

Construction of Black top Road Works on Jalbire Dhunge Road, Chitwan

डिभिजन सडक कार्यालय, चितवन

Rs. 1,20,56,460

0.00%