All Projects
Project |
Office |
Budget |
Progress |
Action |
---|---|---|---|---|
Road Upgrading Works Including Cross Drainage and Retaining Structure along Bhadra chowk Sijuwa- Satmedi Road Section |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 2,21,95,859 |
24.54% |
|
Upgrading of Existing Earthen road to blacktop standard along Hanspur Kathpulla daha tole Ma.Ra.Ma. Road Dhanusha |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 11,71,18,204 |
24.00% |
|
Pavement Works Including Cross Drainage and Retaining Structures along Barahachetra Na Pa ward no 3 Bange Hudai Bharaul Nadaha Hudai Dharan-17 Jodne Sadak |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 11,85,44,120 |
82.00% |
|
Road Construction Works on Dhangadhi Ring Road, Kailali |
सडक डिभिजन, कञ्चनपुर |
Rs. 18,86,600 |
25.00% |
|
Road Improvement Works along United Cement Access Road, Dhading |
डिभिजन सडक कार्यालय, चितवन |
Rs. 98,87,337 |
0.00% |
|
Upgrading of Gandhi Manmohan Marga ( Pathari Bazzar-Sanischare-Gandhiashram-Rangeli-India Border Road) (Ch 0+000-15+000) |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, सुनसरी |
Rs. 71,30,63,004 |
25.00% |
|
Galuwa - Dhwara - Bhakunde - Dothe Tal Sadak, Ba.Na.Pa.-10, Baglung |
Road Division, Baglung |
Rs. 54,97,795 |
25.00% |
|
Road Improvement Works of Betrawati Kalikasthan Syuabaari Laukil Betang Aarukharka Lyangbu Simbandi Gosaikunda Road, Rasuwa |
ओखलढुङगा सल्लेरी सडक योजना, सोलुखुम्वु |
Rs. 33,38,97,758 |
25.00% |
|
Road construction works |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 40,80,542 |
0.00% |
|
Periodic Maintenance works along Magargaun Avas Chowk Bhaisepati Road |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 90,41,721 |
0.00% |
|
Rehabilitation works of Post Monsoon Damaged Section on Ratna Rajmarga (Beureni Section Ch 98+200),Surkhet |
सडक डिभिजन, डोटी |
Rs. 81,63,100 |
23.59% |
|
Construction of blacktop along Ma.Ra. Ma. Shasastra Prahari Bal No:2 Chhinamasta Bahini Sadak Mahottari |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 17,81,833 |
0.00% |
|
Upgrading of Kandra Thekipur Satibajar Karnali Bridge Road (CH: 0+000-13+00), Kailali |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, धनगढी, कैलाली |
Rs. 28,87,07,644 |
17.70% |
|
M/S DRAIPL-SMNS JV, Satdobato Lalitpur Nepal |
बसतपुर कटहरीया कवागोठ पीप्रादी, गण्डक नहर सडक, मलंगवा शहरी सडक योजना निजगढ, बारा |
Rs. 81,68,86,305 |
30.88% |
|
Road Improvement Works along MRM of Banke Dhansar Section, Sarlahi, Rautahat |
यान्त्रिक कार्यालय, धनुषा |
Rs. 10,61,201 |
25.00% |
|
Harsha Chhedi Chowk Bhasedwa Dhansar Sadak, Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 37,22,500 |
0.00% |
|
Highway Upgrading and Rehabilitation Works along Shitalpati Khalanga Kupinde Baluwasangrahi Road in Salyan District. |
वनेपा सिन्धुली वर्दिवास सडक योजना, काठमाण्डौ |
Rs. 80,39,040 |
10.00% |
|
Road upgrading works at Gwarko -lakuri bhanjyang -panauti dahaltar section NH15 |
सडक डिभिजन, भक्तपुर |
Rs. 4,59,32,158 |
35.00% |
|
Maryadpur Sitalpur Mewa Sadak, Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 46,93,790 |
0.00% |
|
Track Opening ,Widening and Upgrading works along Huxain Cement Factory Access Road and Lime Stone quarry site Access Road,Dhading |
डिभिजन सडक कार्यालय, चितवन |
Rs. 1,23,49,663 |
0.00% |
|
Construction of Bailey Bridge over Tallubagar Bheri Khola along Bheri Corridor |
डिभिजन सडक कार्यालय, चौरजहारी |
Rs. 3,40,67,752 |
0.00% |
|
Reactive Maintenance Works along Lamahi - Ghorahi Road in Dang District |
सडक डिभिजन, दाङ्ग |
Rs. 17,80,235 |
30.00% |
|
Upgrading works in ward no.08 Dukuchap ward no.9 Champi -ward no.05 Lele ward no.4 Badhikhel ward no.3 Linking Road Lalitpur. |
पच्चिमाञ्चल क्षेत्रिय सडक निर्देशनालय, पोखरा |
Rs. 13,64,91,094 |
0.00% |
|
Upgrading works in Bungmati Frsidol Dukuchhap - Devi chaur Road. |
मध्यमाञ्चल क्षेत्रिय सडक निर्देशनालय, काठमाण्डौ |
Rs. 13,97,15,409 |
0.00% |
|
Construction of Jallad khola multicell box culvert along janakpur yadukoha road |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 5,30,66,594 |
44.62% |
|
Roadway upgrading works including Roadyway Excavation works, Structural works and Pavement works on Kunaghat (Bichaour) Bhumlichowk Fulanggiri Gaudabhanjyang Road (Saam Ghaderi to Fullanggiri Section) |
सडक डिभिजन, तनहुं |
Rs. 25,35,39,823 |
25.00% |
|
M/S Gejha Kalika Construction,Walling |
सडक विभाग, काठमाण्डौ |
Rs. 1,01,23,519 |
23.00% |
|
Road Construction and Improvement Works on Parsa Border Bahuari Bara Border Gamhariya Benauli Chowk Rautahat Bordere Road (F207) |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 57,93,454 |
0.00% |
|
Roadway Excavation and Structural works along Arunthan-Dhandebhir-Shitalpati-Sadak Sankhuwasabha |
डिभिजन सडक कार्यालय, तुम्लीङटार, संखुवासभा |
Rs. 20,38,160 |
0.00% |
|
Construction of Kabeli Khola Bridge |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 7,59,00,544 |
85.00% |
|
Construction of PSC 2-Webbed RCC Bridge Over Bigahi Nadi along Mukhiyapatti- Musharnia-Brahampuri Sadak, Dhanusha |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 11,18,98,581 |
45.50% |
|
Rehabilitation and Maintenance of Flood Damaged Road by Roadway Excavation,Construction of Roadway Structures (Gabion,Plum Concrete wall), Cross-Drainage Structures, Bioengineering and Gravel Works in Burtibang(Ch.168+000)-Phalleghar(Ch. 190+000) section along Saljhandi -Sandhikharka - Dhorpatan Road (NH-52) |
डिभिजन सडक कार्यालय, नुवाकोट |
Rs. 22,68,94,837 |
26.00% |
|
Upgrading of Yadukuha - Khajuri-Mahuwa Road Dhanusha,HRP/3372244/075-076/UR-010 |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, जनकपुर, धनुषा |
Rs. 32,69,12,227 |
42.94% |
|
Construction of 3*3 Cell RCC Box culvert along Kanchanban Janki Medical College Mithleswar Sabila Road |
सडक डिभिजन, पोखरा |
Rs. 77,34,103 |
22.00% |
|
Construction of Project Directorate Office Building with necessary accessories at Bishalnagar, Kathmandu |
Unknown |
Rs. 24,96,99,425 |
27.00% |
|
Rigid Pavement work along Wana Virkuna Section Chainpur Khandbari Road Package Chainage: 0+000 to 0+300 |
डिभिजन सडक कार्यालय, तुम्लीङटार, संखुवासभा |
Rs. 87,40,515 |
0.00% |
|
Periodic Maintenance works in Mahakali Highway(Gira-Hagulte Section) |
सडक डिभिजन, डोटी |
Rs. 1,33,29,788 |
30.00% |
|
Data Server Support |
सडक विभाग, काठमाण्डौ |
Rs. 4,00,000 |
0.00% |
|
Construction of 2 webbed (2*25m ) RC-Slab-Deck Bridge over Tuhisota River, Goltakuri VDC,Dang. |
धरान चतरा कटारी गाईघाट सिन्धुली हेटौंडा सडक योजना, मकवानपुर |
Rs. 8,94,16,311 |
22.00% |
|
Upgrading works of Khawa Laharemane Chipchipe Road |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 49,10,190 |
99.00% |