All Projects
Project |
Office |
Budget |
Progress |
Action |
---|---|---|---|---|
Bridge Protection works at Khahare Bridge and causeway protection works at khani khola |
डिभिजन सडक कार्यालय, खुर्कोट |
Rs. 39,81,902 |
0.00% |
|
Blacktopped Road Construction Works on Sanischare bajar Singari Mahadeva sadak,Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 35,82,443 |
100.00% |
|
River Training and structure works along Belauti Bagumkhi at Itharwa. |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 34,25,868 |
0.00% |
|
Construction of RCC Bridge over Betaha Khola (1 No.*15 m Span, Total Length 16.20 m) along Rajbiraj Balan Road, Saptari |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, सुनसरी |
Rs. 3,68,47,585 |
82.00% |
|
Roadway Excavation and Construction of Drain and Structure on Dandi Khahare-Majin Damar-Panchakanya Chanaute-Pipalmadi Road Sindhuli |
डिभिजन सडक कार्यालय, खुर्कोट |
Rs. 45,55,875 |
100.00% |
|
Periodic Maintenance (Asphalt Concrete overlay) at Chainage 44+400 to 50+000, 61+600 to 63+500 (Section II) of Dhulikhel-Sindhuli-Bardibas Road |
सूर्यविनायक-धुलिखेल, धुलिखेल-सिन्धुली-बर्दिवास सडक आयोजना, काठमाण्डौ |
Rs. 4,31,01,286 |
0.00% |
|
D & B of kaligandaki Bridge Devghat,Nawalparasi |
पुल योजना पश्चिम क्षेत्र सेक्टर नंः ४, पाल्पा |
Rs. 21,72,48,730 |
100.00% |
|
Construction of Blacktop Works, RCC Box Culvert & RCC Drains along Lalgadh-Tulsi-Bahunmara-Ranibas-BP Rajmarg jodne Sadak, Dhanusha |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 2,69,36,691 |
0.00% |
|
Rehabilitation and upgrading of Road along Ganaha-Chachake-Khalanga Road in Pyuthan District. |
योजना तथा अनुगमन महाशाखा (भूवातावरण तथा सामाजिक शाखा) |
Rs. 2,62,12,820 |
100.00% |
|
Road Upgrading Works on Nayabuspark MangaltarSankhuSadak Changunarayan 4 |
सडक डिभिजन, भक्तपुर |
Rs. 51,70,576 |
100.00% |
|
(Rehabilitation works on Betrawoti Dhunche section of Betrawoti Syprubesi Road (Package-2)) |
हेभिईक्युपमेन्ट डिभिजन, कैलाली |
Rs. 1,13,29,454 |
100.00% |
|
Design and Build of Ratuwa River Bridge Damak-Lakhanpur Road,Jhapa |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 33,42,00,000 |
100.00% |
|
Improvement of Road Retaining Structure and Drain Works along Ridi Balkot Hansapur Pyuthan Surkhet Road |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 55,85,376 |
100.00% |
|
Blacktopped Road Construction Works including Drainage Structures along Kisanchauk-Tandi-Ramite-Sadak, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 54,98,383 |
100.00% |
|
Pavement Works Including Retaining Structure along Gramthan-7 Bajarangbali Nahar-Belbari -Bahuni Sadak Road, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 22,34,377 |
100.00% |
|
Road Side Slope Disaster Management of Kharkhare Landslide -II at Ch: 3+030 (Besishahar Chame Road) |
डिभिजन सडक कार्यालय, धनकुटा |
Rs. 2,89,76,416 |
100.00% |
|
Reactive Maintenance works along Godawari to Phulchowki Road |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 30,89,510 |
95.00% |
|
Road Improvement works on Mulkharka Sole Section of Balaju-Trisuli- Dhunche-Shyaphru Road ,Rasuwa (NH18) |
डिभिजन सडक कार्यालय, नुवाकोट |
Rs. 1,54,83,175 |
100.00% |
|
Road improvement works of Badbhanjyang-Naubise Road, Dhading |
सडक डिभिजन, दाङ्ग |
Rs. 31,17,756 |
100.00% |
|
Recurrent (Reactive) Maintenance Works on Milti-Kirnetar, Khimti-Manthali-Khurkot Road (Ch.19+000-55+000) and Manthali-Ramechhap Road (Ch.0+000-12+210) |
Unknown |
Rs. 40,92,028 |
100.00% |
|
Construction of Drain and Road Strucures on Khahare-Dhaule-Pekarnas Road Section, Ramechhap |
Unknown |
Rs. 98,60,722 |
100.00% |
|
Struuctural works on Bannigadhi Ga. Pa. 2-4 Achham, Janalakot-Timilsen Ring Road |
डिभिजन सडक कार्यालय, चितवन |
Rs. 9,73,193 |
96.00% |
|
Specific Maintenance Works on Milti-Manthali-Khurkot Road Section of Tamakoshi-Milti-Manthali-Khurkot Road, Ramechhap; |
सडक डिभिजन, तनहुं |
Rs. 16,78,160 |
100.00% |
|
Road Improvement Works along Koniya gaun to Chorni section of Birgunj 31 Prasotipur Koniya gaun Chorni, Laxmipur Parsawa Solakpur Ramban Road, Parsa |
यान्त्रिक कार्यालय, सुर्खेत |
Rs. 8,91,396 |
100.00% |
|
Road Improvement Works of Banepa-Raviopi-Panchkhal Road from Ch.9+500 to 16+000 |
सडक डिभिजन, भक्तपुर |
Rs. 2,26,41,120 |
100.00% |
|
Traffic Safety Works on TRP(Hetauda-Bhaise-Tistung-Palung-Damechaur), Makwanpur |
हेभिईक्युपमेन्ट डिभिजन, मकवानपुर |
Rs. 27,47,177 |
100.00% |
|
Road Extension Works in Dhungin-Ganeshman Park Road |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 6,01,125 |
0.00% |
|
Structure works along Laxmi Cement industry Acess Road |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 18,44,910 |
0.00% |
|
Arunkhola Tamaspur Baguwan Dumkibas Sadak, Nawalpur |
सडक डिभिजन, वुटवल |
Rs. 34,18,547 |
100.00% |
|
Traffic Safety work on ARM Suryabinayak- Sanga Road, Different SRN/SURN,Bhaktapur Road |
सडक डिभिजन, भक्तपुर |
Rs. 11,90,470 |
100.00% |
|
construction of roadway structural and blacktop works(ch.0+690-1+535) |
डिभिजन सडक कार्यालय, खुर्कोट |
Rs. 1,12,56,914 |
0.00% |
|
Upgrading of Chanepakha Kueekelpakha kabhrobhot Dhara Sadak,Bhaktapur |
पुर्वाञ्चल क्षेत्रिय सडक निर्देशनालय, झापा |
Rs. 25,52,478 |
100.00% |
|
Recurrent Maintenance works in Milti Kirnetar Khimti Manthali Road (Ch. 19+000-55+000) and Manthali Ramechhap Road (Ch.0+000-13+000) |
डिभिजन सडक कार्यालय, खुर्कोट |
Rs. 17,12,126 |
100.00% |
|
Road Widening and upgrading of Araniko Rajmarga Dagacha Jhyaali Paati Bhattarai Tol Doleswor Sadak |
सडक डिभिजन, भक्तपुर |
Rs. 9,85,501 |
100.00% |
|
Specific maintenance of Panauti Khopasi Taldhunga Road , Kavre |
सडक डिभिजन, भक्तपुर |
Rs. 15,04,146 |
100.00% |
|
Enamel Painting works at Dhulikhel-Sindhuli-Bardibas Road, Dhulikhel-Bardibas Section |
सूर्यविनायक-धुलिखेल, धुलिखेल-सिन्धुली-बर्दिवास सडक आयोजना, काठमाण्डौ |
Rs. 12,72,640 |
0.00% |
|
Upgrading of Krishna Chowk dekhi RaautGaaunPhulchokiMargaHudaiKhanchowk Samma Jane sadakKavre |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 34,14,919 |
100.00% |
|
Longitudinal drain Work along Jane marga and Prithvi marga Sadak, Belbari Na. Pa 3 &4, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 18,75,285 |
100.00% |
|
Reactive/Recurrent Maintenance Works along Chainpur-Bohoratar (57+500 to 74+170) |
डिभिजन सडक कार्यालय, तुम्लीङटार, संखुवासभा |
Rs. 25,32,365 |
0.00% |
|
Construction of Rigid Pavement work Along Chainpur Wana Barhabishe Thupur Khandbari Sadak Sankhuwasabha |
डिभिजन सडक कार्यालय, तुम्लीङटार, संखुवासभा |
Rs. 25,68,826 |
0.00% |