All Projects
Project |
Office |
Budget |
Progress |
Action |
---|---|---|---|---|
Lohandra Khola Bridge Construction work Katari 5 Siswani 7, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 6,31,47,391 |
0.00% |
|
Jaruwapani Holi Culvert Construction Work Rajghat 7 and 8 Road morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 30,00,875 |
0.00% |
|
Installation works of monument at demarcation line of RoW at Madan Bhandari Highway Basaha to Bhiman site |
योजना तथा अनुगमन महाशाखा (योजना अनुगमन तथा मुल्यांकन शाखा) |
Rs. 8,52,796 |
100.00% |
|
Improvement of Campuschowk-Beabasthitnagar-Thapapur Road, Kailali |
सडक डिभिजन, कञ्चनपुर |
Rs. 53,63,380 |
100.00% |
|
Hume Pipe Supply & Delivery Works on Rautahat District |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 8,58,082 |
0.00% |
|
Gravelling works along Imadolwochutole-Alpine tole-Shikhar school-Morepati |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 14,05,694 |
0.00% |
|
Gangate Arantuda matela kachali suyada panchaala Juni Hudai Jumla Road surkhet |
सडक डिभिजन, सुर्खेत |
Rs. 11,51,000 |
100.00% |
|
Fencing, Roof and Grill Works |
गाईघाट दिक्तेल सडक योजना, उदयपुर |
Rs. 6,94,469 |
0.00% |
|
Emergency Specific maintenance of champi Tikabhairav Road |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 14,99,940 |
0.00% |
|
Detailed engineering survey, soil investigation, detailed design of Khanche Bhachok river bridge including approach roads, river-training and bridge protection works, and preparation of working drawings and other necessary documents. |
डुम्रे बेसीशहर चामे सडक योजना, बेसीशहर लमजुङ |
Rs. 9,60,000 |
0.00% |
|
Design and Build of Mawa Betini River Bridge Damak Awade Jhapa |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 22,77,50,000 |
100.00% |
|
D & B of Tinau Nadi Bridge Connecting Shankharnagar,Jogikuti and Motipur, Rupandehi |
पुल योजना पश्चिम क्षेत्र सेक्टर नंः ४, पाल्पा |
Rs. 19,12,69,908 |
0.00% |
|
Cross Drainage and Retaining Structure Works at Ratanpur of Harkapur-Ratanpur Road, Nawalpur |
योजना तथा अनुगमन महाशाखा (योजना अनुगमन तथा मुल्यांकन शाखा) |
Rs. 35,20,400 |
100.00% |
|
Construction of Single Span Pre stressed Concrete Bridge over Tarakhola at Sanhgughat,Baglung |
Road Division, Baglung |
Rs. 4,72,83,449 |
100.00% |
|
Construction of Roadway of RCC Pavement Structural works in Those Falamkhani Approach Road |
डिभिजन सडक कार्यालय, खुर्कोट |
Rs. 6,85,380 |
0.00% |
|
Construction of Masonry Structure, Gabion Works & Pipe Culverts upto Gravel Standards along Marin 5 Badiman Pramanipur Section, Sindhuli |
मध्यमाञ्चल क्षेत्रिय सडक निर्देशनालय, काठमाण्डौ |
Rs. 46,93,189 |
100.00% |
|
Construction of Kerung Tole to Mahendra Adarsha Secondary School, Mahalaxmi na.pa.,ward no.04 |
हेभिईक्युपमेन्ट डिभिजन, काठमाण्डौ |
Rs. 32,93,737 |
0.00% |
|
Construction of Gabion works in Umathirtha Kashitar Lahacheur Kau Bauddhagumba Road |
डिभिजन सडक कार्यालय, खुर्कोट |
Rs. 2,99,468 |
0.00% |
|
Construction of Drain and Road Structures on Khahare-Dhaule-Pekarnas Road Section, Ramechhap |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 51,28,077 |
100.00% |
|
Construction of Demarcation Wall at Kusunti |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 8,09,915 |
100.00% |
|
Construction of Causeway Works at Jingadwa Tejapakad Bhediyahi Narakatiya Sadak, Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 17,42,306 |
0.00% |
|
Construction of Blacktopped road Including Drainage Structures along Jahada-2 Harinagar Muslim Tole Hudai birpur Sadak, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 1,45,38,636 |
100.00% |
|
CONSTRUCTION OF ROADWAY AND STRUCTURE WORK IN MADHYA PAHADI LOKMARGA KO SULIBHANJYANG DHAPCHOWKI TINPATAN BHIMAN SADAK |
डिभिजन सडक कार्यालय, खुर्कोट |
Rs. 66,80,743 |
0.00% |
|
Bridge Structural Steel Painting works of Steel Truss Bridge over Rapti River along Lamahi-Koilabas Road, Dang |
सडक विभाग, काठमाण्डौ |
Rs. 1,29,79,898 |
100.00% |
|
Bridge Construction Works over Sikarwaha (Pranaha) Khola Bridge along Kalakate Gadhwa Road in Dang District |
सडक डिभिजन, दाङ्ग |
Rs. 7,87,76,412 |
0.00% |
|
Blacktop work at Tamghas Simaltari Road section of Madan Bhandari Road Project, Tamghas |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 27,45,636 |
0.00% |
|
Banepa Rabiopi Panchkhal Road (2+550 to 3+360 |
सडक डिभिजन, भक्तपुर |
Rs. 97,73,270 |
100.00% |
|
Aarubari-Atterkhel-Gothatar-Jorpati -Gokarna Road |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 12,70,704 |
0.00% |
|
1 |
Unknown |
Rs. 100 |
100.00% |
|
(Road Improvement Works Of Pimaphat Majhigau Arghale sadak.) |
यान्त्रिक कार्यालय, झापा |
Rs. 24,65,875 |
100.00% |
|
कुईरेपानी-तुलसीपुर सडक दाङ |
सडक डिभिजन, दाङ्ग |
Rs. 48,55,129 |
0.00% |
|
roadway structural drain maintenance and pavement construction works in milti manthali road |
डिभिजन सडक कार्यालय, खुर्कोट |
Rs. 1,29,37,281 |
0.00% |
|
roadway ,structure,drain and pavement construction works in milti khimti (38) road |
डिभिजन सडक कार्यालय, खुर्कोट |
Rs. 41,24,036 |
0.00% |
|
construction of roadway structural and blacktop works in manthali salu saghutar road(ch.2+800-3+550,0+000 @pipal chowk) |
डिभिजन सडक कार्यालय, खुर्कोट |
Rs. 1,15,84,499 |
0.00% |
|
construction of roadway and structural works in khairenighat rakathum galwa doramba road |
डिभिजन सडक कार्यालय, खुर्कोट |
Rs. 48,36,078 |
0.00% |
|
Road Widening and upgrading works on Nyachopauwa ward no 4 khoriya road |
सडक डिभिजन, भक्तपुर |
Rs. 14,43,690 |
0.00% |
|
Road Widening and upgrading works on Chareli Balmiki School Muni Lama Basti Sadak, Changunarayan Na. Pa - 2, Bhaktapur |
सडक डिभिजन, भक्तपुर |
Rs. 30,46,819 |
0.00% |
|
Rehabation and Improvement Works at Mahalaxmi Campus Chowk Khahare Culvert Lalit Ghumti Road. |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 59,16,152 |
100.00% |
|
Recurrent Maintenance Work along Mahendra Rajmarg and Bhalubang Pyuthan Road in Dang District |
सडक डिभिजन, दाङ्ग |
Rs. 32,23,058 |
0.00% |
|
Reactive Maintenance works on Araniko Rajmarg (Lamidanda Dolalghat Bandeu) |
सडक डिभिजन, भक्तपुर |
Rs. 7,65,552 |
0.00% |