All Projects
Project |
Office |
Budget |
Progress |
Action |
|---|---|---|---|---|
|
Road Upgrading Works at Jhyalbas Gurung Ghat section of Chormara Bhimad Road, Nawalpur (Package 2) |
डिभिजन सडक कार्यालय, चितवन |
Rs. 64,41,545 |
99.00% |
|
|
Chandranigahpur Gaur Sadak, Rautahat (From Chapur chainage 32+440 to 45+440) |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 2,81,02,786 |
0.00% |
|
|
Gaur-Chandranigahpur Marg, Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 47,37,157 |
0.00% |
|
|
Upgrading of Roadway with Blacktop Surface and Structural works(CH 98+400 to 107+800) |
धनगढी-खुटिया-दिपायल-चैनपुर-उरैभन्ज्याङ्ग सडक योजना, बि.पी. नगर, डाेटी |
Rs. 14,22,71,884 |
99.50% |
|
|
Maryadpur-Sitalpur-Mewa Sadak, Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 46,25,166 |
0.00% |
|
|
Road Upgrading Works of Kothiya-Thakurdwara-Amreni Road, Bardiya |
सडक डिभिजन, वांके |
Rs. 7,36,79,374 |
0.00% |
|
|
supply of sub base at DRO yad |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 6,48,000 |
0.00% |
|
|
supply of construction materials at division yard(package2) |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 6,25,000 |
0.00% |
|
|
supply of construction materials at division yard(package1) |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 6,42,500 |
0.00% |
|
|
supply of construction materials at DRO yard |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 6,82,500 |
0.00% |
|
|
maintenance of road furniture on SRN/SURN roads(package 7) |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 6,10,830 |
0.00% |
|
|
maintenance of road furniture on SRN/SURN roads(package 6) |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 12,78,487 |
0.00% |
|
|
maintenance of road furniture on SRN/SURN roads(package 5) |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 13,63,108 |
0.00% |
|
|
maintenance of road furniture on SRN/SURN roads(package 3) |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 12,05,885 |
0.00% |
|
|
Thermoplastic panting on various SRN/SURN roads(package 8) |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 7,97,130 |
0.00% |
|
|
Thermoplastic panting on various SRN/SURN roads(package 6) |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 6,47,212 |
0.00% |
|
|
Thermoplastic panting on various SRN/SURN roads(package 5) |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 7,36,312 |
0.00% |
|
|
Thermoplastic panting on various SRN/SURN roads(package 4) |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 6,19,683 |
0.00% |
|
|
Thermoplastic panting on various SRN/SURN roads(package 3) |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 7,98,255 |
0.00% |
|
|
Thermoplastic panting on various SRN/SURN roads(package 2) |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 6,16,122 |
0.00% |
|
|
Thermoplastic panting on various SRN/SURN roads(package 1) |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 7,12,260 |
0.00% |
|
|
Specific Repair of Road in Patan-Satbajh Section of Mahakali Highway(H14) and Satbajh-Jhulaghat Section of Dashrath Chand Marg(F50 |
सडक डिभिजन, बैतडी |
Rs. 3,41,24,729 |
0.00% |
|
|
Roadway excavation , structure works on Rupakhet-Khari-Gaidabaj Na. Na. Pa. 1- Mahabu-2 Road |
सडक डिभिजन, सुर्खेत |
Rs. 43,32,148 |
100.00% |
|
|
Roadway Infrastructure Development Works on Sahidpark Kalika Road, Rasuwa |
डिभिजन सडक कार्यालय, नुवाकोट |
Rs. 19,59,031 |
0.00% |
|
|
Roadway Excavation And Structure Works along Satbanjh-Srivabar Road,Baitadi(From Srivabar Side) |
सडक डिभिजन, बैतडी |
Rs. 77,19,242 |
0.00% |
|
|
Road Upgrading Works on Kamalbinayak(Bhetkekopati) Omkareshwor Mandir Dekhi Pipeline Road,Bhaktapur |
सडक डिभिजन, भक्तपुर |
Rs. 53,10,534 |
0.00% |
|
|
Road Construction works on Kalaiya Na.Pa. 17 Bramhapuri Matiyariya Red Cross Tole Road, Bara |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 1,03,76,621 |
0.00% |
|
|
Rehabilitation Works on Rapti Lokmarga ( Khaula Musikot Section Ch. 106+500 to Ch. 138+000) |
डिभिजन सडक कार्यालय, चौरजहारी |
Rs. 5,00,64,434 |
100.00% |
|
|
Recurrent maintenance of SRN/SURN road(sector 6) |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 14,68,688 |
0.00% |
|
|
Recurrent maintenance of SRN/SURN road(sector 3) |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 12,05,885 |
0.00% |
|
|
P.R. Construction Pvt. Ltd., Changu Narayan, Bhaktpur. |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 23,69,461 |
0.00% |
|
|
Name of the Work : Road Way Upgrading,Excavation & Structure Works along Dethala-Khar-Khalanga Road,Darchula. (Ch.19+000 Km-21+500 Km) |
सडक डिभिजन, बैतडी |
Rs. 1,00,28,032 |
0.00% |
|
|
Construction and Improvement of Rakse Kalyara Phulbari Lahura Dadakharka Ward Karyalaya Pyuthan Road |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 24,71,691 |
0.00% |
|
|
Construction and Improvement of Gulmi Chhatrakot Ga.Pa. Huga Chorkate Satyabati Ga Pa-7 Road, Gulmi |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 4,68,258 |
0.00% |
|
|
Road Safety works in Banepa Panauti Khopasi Road & Lakurebhanjyan Panauti Namobudha Road |
सडक डिभिजन, भक्तपुर |
Rs. 5,25,007 |
0.00% |
|
|
Construction of RCC Bridge (1x25m) over Saiyapur Khola along Nepalgunj Baghauda Road, Banke |
सडक डिभिजन, वांके |
Rs. 2,87,41,740 |
0.00% |
|
|
Construction of Blacktop Road On Jhapa Chowk Bhadrapur Birtamod Road Jhapa |
डिभिजन सडक कार्यालय, झापा |
Rs. 22,43,09,819 |
63.00% |
|
|
Supply of CRM Sub-base Materils, Crushed Chip (13.2mm to 0.09mm) Materials, Semi-Grouting aggregates (37.5 mm to 13.2 mm), Stone Dust, Bitumen Emulsion m/s 65%(Medium Setting) as per Direction of Engineer at Instructed Camp of Road Division Biratnagar |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 16,61,364 |
0.00% |
|
|
Black top work for Road Upgrading and Rehabilitation Works along Seradi – Serighat - Manma Road (Karnali Highway) ( Ch 132+000-137+000) |
डिभिजन सडक कार्यालय, जुम्ला |
Rs. 1,58,91,580 |
0.00% |
|
|
Reactive Maintenance works of Banepa - Panauti Khopasi Road |
सडक डिभिजन, भक्तपुर |
Rs. 12,96,026 |
0.00% |