All Projects
Project |
Office |
Budget |
Progress |
Action |
|---|---|---|---|---|
|
Asphalt concrete overlay and thermoplastic painting works ( Manohara to Surya binayak Road section ) |
सूर्यविनायक-धुलिखेल, धुलिखेल-सिन्धुली-बर्दिवास सडक आयोजना, काठमाण्डौ |
Rs. 16,99,83,499 |
0.00% |
|
|
Rehabilitation Works on Gurje Chhahare Section of Samakhusi-Tokha-Gurje- Chhahare Road (NH40), Nuwakot (Ch: 11+500 to 17+000) |
डिभिजन सडक कार्यालय, नुवाकोट |
Rs. 1,64,90,833 |
100.00% |
|
|
Dhankuta Leguwa Tumlingtar Sisuwa Budhabare Solu Sadak (Giddhe Chewabesi) Section (Ch. 0+000 to 2+500) |
डिभिजन सडक कार्यालय, तुम्लीङटार, संखुवासभा |
Rs. 42,90,670 |
0.00% |
|
|
Construction of blacktop & Hume pipe Culvert along Jamunibas ko Lav kush Niraspur hudai bhuchkrpur siyaram chowk janpriya ma.bi sadak dhanush |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 45,65,958 |
0.00% |
|
|
Construction of Pre-stressed motorable concrete bridge over Chhartang Khola Pisanga Upper Manang in Manang District |
सडक डिभिजन, तनहुं |
Rs. 3,69,12,778 |
0.00% |
|
|
Upgrading and Improvement Works on Mahendra Rajmarg. (Gorusinghe Bazar (CH-634+000)-Dhan khola (CH-675+000) Section), Kapilvastu |
सडक डिभिजन, कपिलवस्तु |
Rs. 2,29,90,025 |
100.00% |
|
|
Garuda Samanpur Sadak ko Malahi Tole baat Bariyarpur hudai Gamahariya Laxmipur hudai Bagmati Kinar Sadak, Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 39,64,713 |
0.00% |
|
|
Road Protection Works along Hetauda-Bhaise Section of TRP, Makwanpur |
यान्त्रिक कार्यालय, वुडर |
Rs. 11,54,460 |
100.00% |
|
|
Road Upgrading Works Bhutekhahare Corridor Gaudol Jyotilingeswor Pakunepati dakshinkali,Karpati 4 |
सडक डिभिजन, भक्तपुर |
Rs. 6,49,605 |
100.00% |
|
|
गोवार खोला पुल ,घोराही-तुलसीपुर सडक , दांग |
पुल योजना, पश्चिम क्षेत्र सेक्टर नं. ३, वांके |
Rs. 25,11,20,354 |
100.00% |
|
|
Road Improvement works on Kalikasthan Grang Section of Balaju-Trisuli- Dhunche-Shyaphru Road ,Rasuwa(NH18) |
डिभिजन सडक कार्यालय, नुवाकोट |
Rs. 1,00,16,495 |
0.00% |
|
|
Road Upgrading Works along Kuirepani-Jhingani-Rampur-Harnok Sworgadwari Road in Pyuthan District. |
डिभिजन सडक कार्यालय, चितवन |
Rs. 18,24,690 |
98.00% |
|
|
Drain and Gravelling Works on Dailekh-Khatigau-Tirkhat-Paltapani-Raili Road, Dailekh |
सडक डिभिजन, सुर्खेत |
Rs. 69,08,299 |
99.06% |
|
|
Reactive Maintenance: Repair of Pot holes and Side Drain along Gangate - Labdhu- Samundratar- Golphubhanjyang Road |
डिभिजन सडक कार्यालय, नुवाकोट |
Rs. 21,24,741 |
0.00% |
|
|
Road widening & upgrading works at Gelalgaun Jyotilingesor Woda Karyalaya Road |
सडक डिभिजन, भक्तपुर |
Rs. 60,78,156 |
100.00% |
|
|
Upgrading of Road to Blacktop Standard with Roadway Excavation,Structural and Drainage Works in Sadhani Chauraha -Sadhani Bridge Section of Mahakali Corridor [CH:22+550- CH 24+700], Indradhanu Hatairaj JV Baitadi |
Unknown |
Rs. 7,25,43,836 |
98.93% |
|
|
Black top work for Road Upgrading and Rehabilitation Works along Manma - Nagma Road (Karnali Highway) ( Ch 155+000-172+000) |
डिभिजन सडक कार्यालय, जुम्ला |
Rs. 1,67,98,487 |
0.00% |
|
|
Blacktop Work for Road Upgrading and Rehabilitation Works along Seradi – Serighat - Manma Road (Karnali Highway) ( Ch 137+000-142+000) |
डिभिजन सडक कार्यालय, जुम्ला |
Rs. 1,58,75,890 |
0.00% |
|
|
: Roadway Excavation,structure and gravel works on Tallo Dungeshwor-Satkhamb-Dullu-Pipalkot-Khulalu-Manma-Nagma-Jumla sadak,Dailekh(Paduka-Nuwakot section) |
सडक डिभिजन, सुर्खेत |
Rs. 1,08,17,035 |
99.04% |
|
|
Improvement of Bhuda-Sadakghat-Kalkatta-Ratanpur-Beldangi-Daiji Road, Kanchanpur |
सडक डिभिजन, कञ्चनपुर |
Rs. 22,82,427 |
100.00% |
|
|
Bridge maintenance works on Gwarko - panauti- dhalatar (NH15) |
सडक डिभिजन, भक्तपुर |
Rs. 12,13,416 |
100.00% |
|
|
Bridge Protection works at Khahare Khola Bridge, Charikot-Ramechhap Road, Ramechhap |
डिभिजन सडक कार्यालय, खुर्कोट |
Rs. 25,48,167 |
100.00% |
|
|
Road Widening and Upgrading Works on Nala Sadak Sallaghari Bhangal Wada Karyalaya Arniko Rajmarg Jodne Sadak, Bhaktapur |
सडक डिभिजन, भक्तपुर |
Rs. 42,92,049 |
0.00% |
|
|
Road Upgrading works along Bhalukhop-Khudnabari Road |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 39,11,410 |
0.00% |
|
|
Emergency Road Maintenance work on Karnali Highway (Purano Buspark -Section) at Ch.153+500,Kalikot |
डिभिजन सडक कार्यालय, झापा |
Rs. 63,71,900 |
98.55% |
|
|
Balara Chhatauna Sudama Khairwa Chotaul Sisaut Sadak, (Bhagwanpur tole dekhi Balara Bajar Sadak), Sarlahi |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 43,84,650 |
100.00% |
|
|
Construction of Prestress RCC Bridge over Sundari Khola (2no*30 m Span, Total Length 64.10 m) along Kanchanpur - Rajbiraj Hulaki Road, Saptari |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, सुनसरी |
Rs. 5,43,13,476 |
100.00% |
|
|
Recurrent Maintenace work along Mawa to Itahari section of Mahendra Rajmarga, Aambari to Urlabari section of Bardanga Aambari Urlabari Road, MRM Itahari to Koshi Barrage section, KRM Itahari to Bhedrtar section, Duhabi to Inaruwa Road |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 2,58,69,257 |
98.27% |
|
|
Construction of Slab Culvert(Span 6m) and Gabion Works on Ghusradanda Bamekhola Sadak, Surkhet |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 30,23,434 |
100.00% |
|
|
Road Improvement Works on Phedigaun-Chogate-Bohorebhanjyang-Rasuwa Road |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 37,35,864 |
100.00% |
|
|
Traffic Safety works in SRN/SURNs Lalitpur |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 5,54,688 |
98.00% |
|
|
Upgrading & Rehabilitation works along Lubhu- Lakuribhanjyang -Manedovan Road (Package 2) |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 2,25,16,643 |
0.00% |
|
|
Specific Maintenance Works in Chyamasingh- Amadol- Nala Banepa Road |
सडक डिभिजन, भक्तपुर |
Rs. 5,60,624 |
0.00% |
|
|
Construction Of Blacktopped Road along Biratnagar Jogbani 6 lane Sadak-Rajbanshi chowk Purwa Pathibhara Sadak, Morang |
पच्चिमाञ्चल क्षेत्रिय सडक निर्देशनालय, पोखरा |
Rs. 38,25,000 |
99.20% |
|
|
Roadway Improvement Works On Karnali Rajmarga,Siradi Section (Surkhet-Jumla) Dailekh (RDSKT/33701138-4/076/077-29) |
सडक डिभिजन, सुर्खेत |
Rs. 3,81,66,353 |
100.00% |
|
|
Periodic maintenance works on Gangate Labdhu Samundratar Road ,Nuwakot |
डिभिजन सडक कार्यालय, नुवाकोट |
Rs. 3,13,13,954 |
0.00% |
|
|
Construction works of Sunakothi-Chapagaun Sadak. |
डिभिजन सडक कार्यालय, सिराहा |
Rs. 42,64,334 |
0.00% |
|
|
Design & Build of Kamala River Bridge, Dudhauli Na Pa 5 Khiryani and Chhatwangachhi 2 Dudhauli Na Pa 10, Sindhuli |
पुल योजना, मध्य क्षेत्र सेक्टर नं. २, काठमाण्डौ |
Rs. 69,56,94,601 |
99.60% |
|
|
Traffic Safety and Painting Works on Milti-Manthali-Khurkot and Manthali-Ramechhap Road Section of Tamakoshi-Milti-Manthali-Khurkot Road and Manthali-Ramechhap Road, Ramechhap |
पच्चिमाञ्चल क्षेत्रिय सडक निर्देशनालय, पोखरा |
Rs. 25,18,964 |
100.00% |
|
|
Bridge Protection Works at (Manahari Bridge & Rapti Bridge) Makawanpur |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 25,82,560 |
0.00% |