Blacktop road Construction Works on Ward No.2 to Ward No.13 Road of Bhimdatt Municipality, Kanchanpur (Ward no 18 to Ward no 15) |
सडक डिभिजन, कञ्चनपुर |
Rs. 94,90,579 |
65.00% |
|
|
Construction of Aurahi pul Mahendranagar – Paper mills – Shantinagar Road , Dhanusha |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 10,87,81,286 |
105.00% |
|
|
बबई नदी मोटर पुल, घुईयावारी काप्रेचौर, सल्यान |
पुल योजना, पश्चिम क्षेत्र सेक्टर नं. ३, वांके |
Rs. 19,70,89,380 |
50.00% |
|
|
Transportation, Fixing and Calibration of Lab Equipment |
डिभिजन सडक कार्यालय, तुम्लीङटार, संखुवासभा |
Rs. 12,84,565 |
0.00% |
|
|
Upgrading and Improvement Works on Jitpur-Taulihwa Sadak. (Bhawani Bhixu-Bahadurgung, Bazar adda Chauk), Kapilvastu |
सडक डिभिजन, कपिलवस्तु |
Rs. 1,66,17,357 |
70.00% |
|
|
Structural, Drainage, and Bituminous work on Chidya khola- Bartumg Road section |
सडक डिभिजन, पाल्पा |
Rs. 89,55,102 |
60.00% |
|
|
Construction RCC Road & RCC Drain Work along Bisharvhora Nathpatti Mangraha Machi Khajuri Balhagoth sadak |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 3,23,54,001 |
0.00% |
|
|
Upgrading of panchkhal-Melamchi Timbu Road (Panchkhal - Melamchi Section) |
पाँचखाल-मेलम्ची-टिम्वु सडक योजना, बिशालनगर, काठमाण्डौं |
Rs. 86,79,62,429 |
0.00% |
|
|
Construction of RCC Bridge (1*25m) over Hile Khola, Sabik Shanti Arjun-09, Jhapa |
डिभिजन सडक कार्यालय, झापा |
Rs. 3,08,63,610 |
59.00% |
|
|
Damak Chakrapath |
डिभिजन सडक कार्यालय, झापा |
Rs. 25,96,25,763 |
60.00% |
|
|
Construction of Blacktop and Hume pipe Culvert along Bateshwor Bazar Sitapur Chowk Kartik Kuwar Nirashpur LuvKush Laxmi Nibash Ma. Bi. Wada Karyalaya Sadak Dhanusha. |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 51,90,987 |
67.00% |
|
|
ja. Up. Ma.Na.pa. Pulchowk Shivpur Thera sadak, Dhanusha. |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 46,70,241 |
0.00% |
|
|
Cross Drainage on Chhinchu-Ghariban-Kalche-Salyan-Dang Road Surkhet |
सडक डिभिजन, सुर्खेत |
Rs. 50,67,437 |
60.00% |
|
|
Design & Build of Likhhu Bridge :In between Ramechhap Preeti -5 Simle and Okhaldhunga Raabdolu -9 Shraba (Ramechhap/Okhaldhunga) |
पुल योजना, मध्य क्षेत्र सेक्टर नं. २, काठमाण्डौ |
Rs. 8,51,39,203 |
59.00% |
|
|
Construction of Prestressed RCC Bridge over Ghaghar khola (3 no *40 m spna,Total length 127.10 m ) along madi thori road,Chitwan |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, वीरगंज, पर्सा |
Rs. 8,42,05,883 |
63.00% |
|
|
Upgrading/ Improvement Works of Jaleshwor-Loharpatti Section of Janakpur Parikrama Road |
Janakpur Parikrama, Byparik Margha Bistaar Yojana (Jatahi-Janakpur), Mahottari |
Rs. 28,69,52,462 |
0.00% |
|
|
Tinau River along Naya bazar |
सडक डिभिजन, वुटवल |
Rs. 5,95,10,972 |
100.00% |
|
|
Upgrading and widening of Belhiya-Butwal Road to six lane standard (CH.24+000 TO CH.27+500) |
योजना तथा अनुगमन महाशाखा (योजना अनुगमन तथा मुल्यांकन शाखा) |
Rs. 41,83,25,918 |
52.00% |
|
|
Earth works Gravel Work along Kanchanban Janki Medical Mithileshwor sabaila Road (From Rajdevi Mandir towards Kanchanban). RDJKR/33701138/077-78/42 |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 64,54,383 |
50.00% |
|
|
Construction of Pre-Stressed RCC Bridge Over Lamaha River Bridge along Harsaha Chowk on Chandranigahpur-Gaur Road (Simara Bhawanipur VDC ward no. 4 Partapur Paltuwa VDC Ward no 9) Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 6,12,77,724 |
48.00% |
|
|
Construction of RCC Bridge over Sunwara River, Kanchanpur |
सडक डिभिजन, कञ्चनपुर |
Rs. 8,29,75,987 |
90.00% |
|
|
Mariya Khola Bridge along Dhanibani VDC Koriyadangi sadak,Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 1,55,07,396 |
0.00% |
|
|
Construction of Blacktopped Road at Damak-Krishna Mandir-Pingdanda-Dharanetole-Satomara-Aambari hudai Itahara Road |
डिभिजन सडक कार्यालय, झापा |
Rs. 93,58,212 |
0.00% |
|
|
Rigid Pavement work along Wana Virkuna Section Chainpur Khandbari Road Package Chainage: 0+600 to 0+89500 |
डिभिजन सडक कार्यालय, तुम्लीङटार, संखुवासभा |
Rs. 88,43,280 |
0.00% |
|
|
Drain & Structure Works on Tanakpur Link Road |
सडक डिभिजन, कञ्चनपुर |
Rs. 92,38,985 |
100.00% |
|
|
Reactive Recurrent Maintenance of Road Surface in Satbajh-Gokuleshwor-Khalanga Section of Mahakali Highway (NH66) CH0+000-126+000 |
डिभिजन सडक कार्यालय, चितवन |
Rs. 98,92,050 |
29.34% |
|
|
Roadway Excavation,Hume pipe,Culvert,Gabion,Masonry wall and Gravelling works along khanadaha Arghakhachi(156+000)to Ratanmare,Arghakhachi(165+000) |
सालझण्डी सन्धिखर्क ढोरपाटन सडक योजना, अर्घाखांची |
Rs. 1,64,54,601 |
0.00% |
|
|
Upgrading of Besisahar Chame Road (Ch 0+100 to 7+800), Lamjung |
डुम्रे बेसीशहर चामे सडक योजना, बेसीशहर लमजुङ |
Rs. 22,46,57,695 |
98.00% |
|
|
Extension of Peslicola-Sallaghari Road (Manohara Pul dekhi Bahakha Bazzar hundai Nikoshera Khasyang Khusung Pul Road) Ch. Ch.: 0+000 to 4+500 |
काठमाण्डौ उपत्यका सडक विस्तार आयोजना, काठमाण्डौ |
Rs. 44,22,78,201 |
40.00% |
|
|
Improvement of Khutiya Pul Kanari - Urma - Behedababa Road, Kailali |
सडक डिभिजन, कञ्चनपुर |
Rs. 44,90,862 |
65.00% |
|
|
Road Improvement & extension works along Imadol Police station-Wochu sitapakha-1 number dhara-Morepati - koji home Kamalpokhari |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 61,16,605 |
0.00% |
|
|
Construction of Bhuji Khola Bridge |
Road Division, Baglung |
Rs. 2,95,65,992 |
60.00% |
|
|
Construction of multiple cell box culvert in gandak canal along Parwanipur- dryport Road. |
व्यापारिक मर्ग विस्तार योजना / विरगंज-पथलैया खण्ड, पथलैया |
Rs. 9,16,58,415 |
0.00% |
|
|
Construction of Box Culverts [ch 36+150, ch 40+300] and Rigid pavements [ch 29+000, ch 40+800, ch 40+900] on Dumre Besisahar Road, Lamjung |
डुम्रे बेसीशहर चामे सडक योजना, बेसीशहर लमजुङ |
Rs. 1,00,25,381 |
59.29% |
|
|
Construction of pre-stressed RCC bridge over Girighat Khola along Kuinet Bheri Nadi Hariharpur-5 and Birendranagar-25, Surkhet |
सडक डिभिजन, सुर्खेत |
Rs. 3,80,42,141 |
100.00% |
|
|
Road impovement work with Drainage, Humepipe culvert along Laundihawa Jogada Masina Mohsar Bharat sima Rupandehi (Chainage from Odawaliya to sukrauli sector election area no.4 ) |
सडक डिभिजन, वुटवल |
Rs. 1,41,46,052 |
61.00% |
|
|
Construction Works in Udayapurko Baraha Chaudandi Ranitar Amchok Ga.Pa.Sadarmukam Balankha Lekharka Panchdhare hudai Chakhewa diktel Sadak |
डिभिजन सडक कार्यालय, तुम्लीङटार, संखुवासभा |
Rs. 42,41,523 |
0.00% |
|
|
Highway Upgrading and Rehabilitation works along MRM (Kalakante - Bhalubang Section) Road in Dang District. |
सडक डिभिजन, दाङ्ग |
Rs. 1,11,61,692 |
50.00% |
|
|
Construction of RCC Box Culverts ,E/W & RCC Works along Nagarain-Lagma-Devdiha-Bahuwarba-Lohana Sadak,Dhanusha |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 47,88,796 |
0.00% |
|
|
Construction of Slab Culvert and river training works on Charikot Dolakha Road |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 67,24,263 |
0.00% |