All Projects
Project |
Office |
Budget |
Progress |
Action |
|---|---|---|---|---|
|
Upgrading of Bhajani Karmadevghat-Gulariyaghat Road (Km 0+000-KM 1+200), Kailali |
सडक डिभिजन, कञ्चनपुर |
Rs. 1,72,89,292 |
100.00% |
|
|
Extension of Chabhil-Jorpati-Sankhu Road (Ch. 6+000 to 9+000) |
काठमाण्डौ उपत्यका सडक विस्तार आयोजना, काठमाण्डौ |
Rs. 40,43,38,113 |
75.00% |
|
|
Construction of RCC Bridge over Lehera Khola (1 No*25 m Span, Total Length 26.2 m), along Mechi - Ratuwa , Hulaki Road, Jhapa |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, सुनसरी |
Rs. 4,10,98,367 |
60.00% |
|
|
Roadway Excavation and Construction Of Structure on Kusemuse -Chakhure-Pere - Dolphu Gau Sadak,Gugu (DROJML/33701137/077/078-08) |
डिभिजन सडक कार्यालय, जुम्ला |
Rs. 6,15,350 |
0.00% |
|
|
Aglung Bajhakateri Simalatari Siladi Arkhabang Bhimghitthe Road, Gulmi |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 48,58,650 |
0.00% |
|
|
Construction and Installation of traffic Safety Structures along Tamghas Simaltari Dwaneta Purkotdah Sautamare Road, Gulmi |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 99,38,281 |
0.00% |
|
|
Road Side Maintenance Works (Road Side drain maintenance works) along Ghodena-Nagma Section, Kalikot |
योजना तथा अनुगमन महाशाखा (योजना अनुगमन तथा मुल्यांकन शाखा) |
Rs. 42,99,834 |
10.33% |
|
|
Upgrading of Thulopatal Laharemane Upalmukhi Road, Dolakha |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 49,94,636 |
91.00% |
|
|
Road Upgrading Works on Leguwa-Kewabeshi Road, Dhankuta (Chainage No. 0+000 to 7+000) |
डिभिजन सडक कार्यालय, धनकुटा |
Rs. 11,99,62,308 |
100.00% |
|
|
Roadway Excavation and structural work in Mahakali Lokmarga (ch 92+000 to 150+000, Baitadi) |
दार्चुला टिङकर सडक योजना, दार्चुला |
Rs. 13,73,02,662 |
58.82% |
|
|
MIDHLDNG3371384/075/076 |
Puspalal (Midhill) Road Project, Dailekh |
Rs. 5,70,35,374 |
62.00% |
|
|
Ghorahi Bazar Extension Works along Lamahi-Tulsipur in Dang District. |
सडक डिभिजन, दाङ्ग |
Rs. 3,32,83,286 |
0.00% |
|
|
नौमुले बालुवाटार द्वारी झरना सडक |
सडक डिभिजन, दाङ्ग |
Rs. 3,18,577 |
0.00% |
|
|
Specific Maintenance Works on Mahendra Rajmarg. (Chandrauta CH. 654+000)-Dhankhola (CH. 675+500) Section), Kapilvastu |
सडक डिभिजन, पाल्पा |
Rs. 41,71,763 |
60.00% |
|
|
Construction of RCC Bridge with Open Foundation over Geuriya Khola Bridge, Keraun- Darbesha, morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 1,18,79,136 |
57.00% |
|
|
Construction of Prestressed bridge over sano mai-2,Rata Khola |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 4,24,34,640 |
0.00% |
|
|
Bhushi Mahuliya Laxamipur Khoriyatole Madhupatti Birnagar Banigama Sadak |
डिभिजन सडक कार्यालय, सिराहा |
Rs. 44,64,740 |
0.00% |
|
|
Specific Maintenance works |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 98,52,016 |
0.00% |
|
|
Construction of Presressed RCCBridge over Singhiya Khola bridge,Biratnagar 01,Belgachhi Tole Rangsala Road,Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 5,79,75,661 |
88.00% |
|
|
Earthwork,structure works,cross drainage and pavement work |
Puspalal (Midhill) Road Project, Panchthar |
Rs. 29,69,46,618 |
0.00% |
|
|
Upgrading of Pushpalal (Midhill) Highway along Bharangbhurung - katunje Road Section - (Chainage: 13+500 - 25+685 km), Dhading. |
मुग्लिन-पोखरा सडक योजना (पूर्वी खण्ड), डुम्रे |
Rs. 36,89,25,150 |
59.12% |
|
|
roadway improvement works (serigath kalikot) |
डिभिजन सडक कार्यालय, जुम्ला |
Rs. 22,03,238 |
0.00% |
|
|
Road Rehabilitation works on Chaukhutte-Sanfe-Mangaslesn Road Section |
डिभिजन सडक कार्यालय, साँफेवगर, अछाम |
Rs. 73,51,465 |
60.00% |
|
|
Construction of RCC Pavement along Tarapatty -Pathara-M.R.M., Pushpalpur NH-30, Dhanusha RDJKR/33701138/077-078/40 |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 2,43,38,345 |
0.00% |
|
|
Construction and Improvement of Seugha Simaghat Purkotdaha Hadhade Pipaldhara Nayagaun Tamghas Road, Gulmi |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 20,27,615 |
0.00% |
|
|
Road Upgrading & Rehabilitation Work (Rehabilitation & Asphalt Overlaying Work) on Mahendra Rajmarga (Khairikhola-Kohalpur Section) |
सडक डिभिजन, वांके |
Rs. 2,91,69,981 |
0.00% |
|
|
Construction of Blacktop works, Masonary Drain and Retaining structures at Mirchaiya (Ma.Ra.Ma.) - Katari - Ghurmi Sadak (Mirchaiya-Katari Section_Package_1) - Chainage 17+100 to 22+100. |
ओखलढुङगा सल्लेरी सडक योजना, सोलुखुम्वु |
Rs. 4,69,65,093 |
60.00% |
|
|
Roadway Excavation with Retaining Structure, Pipe Culverts & Graveling works at Benighat Aarughat Larkebhanjhang Road, Gorkha. |
डिभिजन सडक कार्यालय, सिराहा |
Rs. 6,78,11,870 |
25.00% |
|
|
Roadway Excavation work with Retaining Structure works of Ligligkot Aappipal Bayaapani Sikhradhara Bajredada hudai Jalbiredekhi Lamjung Tinpiplesammako Sadak Gorkha |
गाेरखा सडक योजना, गोरखा |
Rs. 17,31,144 |
0.00% |
|
|
contraction of specific maintenance works on Khaula-Musikot Road section, Rapti lokmarg, (Ch 125+350 to 122+150) |
डिभिजन सडक कार्यालय, चौरजहारी |
Rs. 65,42,000 |
0.00% |
|
|
Road Maintenance in Patan-Satbajh Section of Pushpalal (Mid Hill) Highway (NH03) |
सडक डिभिजन, बैतडी |
Rs. 88,39,922 |
0.00% |
|
|
Construction of 25m Simply Supported Span, Cast-in-situ, 2-Webbed Reinforced Concrete Slab-Deck Bridge Over Kandebhir (Fusre) Khola, Nawalparasi (Chainage 55+900) |
योजना तथा अनुगमन महाशाखा (सडक सुरक्षा तथा ट्राफिक शाखा) |
Rs. 4,06,70,678 |
75.00% |
|
|
Design & Build of Budhigandaki River Bridge, Soti in between Thumi & Manbu, Gorkha |
पुल योजना, मध्य क्षेत्र सेक्टर नं. २, काठमाण्डौ |
Rs. 11,12,07,433 |
37.60% |
|
|
Road Upgrading works along Gyalibhanjyang-Ratnasurung Road, Ilam |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 43,02,527 |
0.00% |
|
|
Upgrading and Construction of Rani-Biratnagar-Itahari-Dharan Road to six lane standards. (Ch: km 26+400 to 29+600) |
व्यापारिक मार्ग विस्तार आयोजना (रानी-बिराटनगर-इटहरी-धरान मार्ग), सुनसरी |
Rs. 56,26,63,055 |
65.00% |
|
|
Construction of Simply supported two span, Cast In-Situ, 2-webbed RCC Slab-deck Bridge (2* 25 m) across Bijayapur river at Siudiko Mukh along Kahukhola-Sikles-Dudhpokhari Road |
सडक डिभिजन, पोखरा |
Rs. 5,00,00,954 |
0.00% |
|
|
Construction of Prestressed RCC Bridge over Kanchaniya Khola along Lalpur - Shitlapur Road, Kapilvastu |
हुलाकी राजमार्ग योजना कार्यालय, कपिलवस्तु |
Rs. 7,94,83,273 |
58.61% |
|
|
Road Construction Works on Rajaiya Lametar Chakari-Makari sadak, Makwanpur |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 2,00,57,220 |
0.00% |
|
|
Reactive Maintenance of Road Surface in Khodpe-Bagthala Section of Khodpe-Bajhang Road(F49) |
सडक डिभिजन, बैतडी |
Rs. 25,88,000 |
0.00% |
|
|
Periodic Maintenance work (premix Ovarlay) at Khulalu to Ghodengaa (Ch 136+000 to 138+000) on Karnali Highway Kalikot |
मध्यमाञ्चल क्षेत्रिय सडक निर्देशनालय, काठमाण्डौ |
Rs. 14,55,720 |
58.49% |