All Projects
Project |
Office |
Budget |
Progress |
Action |
|---|---|---|---|---|
|
Road Maintenance Works on Chyamasing Nala Banepa Road |
सडक डिभिजन, भक्तपुर |
Rs. 14,69,830 |
0.00% |
|
|
Construction of Road Structures,Cross drainage and Earthworks from Sautamare(Ch.97+000)to Purkotdaha(Ch.102+000)and Myalpokhari(Ch.104+000)to Malikathan(Ch.107+125) |
सालझण्डी सन्धिखर्क ढोरपाटन सडक योजना, अर्घाखांची |
Rs. 92,93,882 |
0.00% |
|
|
Thande-Ragane-Falante rawadolu sadak (Khiji Timba Ga.Pa) |
डिभिजन सडक कार्यालय, हर्कपुर, ओखलढुङगा |
Rs. 44,31,548 |
100.00% |
|
|
Road Upgrading Works, Devisadh-Tinpane Section (Ch. 64+000 to 71+000Km) |
कान्ती लोकपथ सडक योजना, ललितपुर |
Rs. 15,79,88,513 |
100.00% |
|
|
Black top works along BalmikiChakrapath, Nawalpur contract no. 63 |
सडक डिभिजन, वुटवल |
Rs. 1,23,61,901 |
0.00% |
|
|
Road Upgrading Works on Kalimati Laudari Bhanjyang Ratanpur Chandrawati Sadak, Tanahun |
सडक डिभिजन, तनहुं |
Rs. 1,25,70,324 |
0.00% |
|
|
ग्वार खोला पुल, रिहार सिमल सोता फुलबारी रनियापुर कुटेडाडा, टरीगाउ एअरपोर्ट सडक, दाङ्ग |
पुल योजना, पश्चिम क्षेत्र सेक्टर नं. ३, वांके |
Rs. 22,81,54,867 |
100.00% |
|
|
Road upgrading works along Srijana Chowk (ARM) - DRO-Katunje VDC |
सडक डिभिजन, कञ्चनपुर |
Rs. 1,08,45,070 |
100.00% |
|
|
Construction work at Bungmati Farsidol Road Lalitpur. |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 28,39,896 |
0.00% |
|
|
Earthwork Excavation, Roadway Excavation, Structural Masonry Works, on Bartung-Tansen-Ridi - Tamghas Road. |
सडक डिभिजन, पाल्पा |
Rs. 2,14,01,687 |
100.00% |
|
|
Design & build of three bridges along Madan Bhandari Highway(Jhatare-Mechidangi Chowk section) |
मदन भण्डारी राजमार्ग योजना कार्यालय, दमक |
Rs. 48,14,48,672 |
100.00% |
|
|
Roadway improvement works Tharmare Chaurjahari Jajarkot Khalanga JumlaKudari Mugu Rara Road (Tribeni-Tamti section) in jumla |
सडक विभाग, काठमाण्डौ |
Rs. 3,32,67,950 |
40.10% |
|
|
Package No 1 |
मोहनापुल अत्तरीया सडक योजना कार्यालय, कैलाली |
Rs. 51,47,92,980 |
93.00% |
|
|
Ms Durga Construction and Supplyer-07 |
धनगढी-खुटिया-दिपायल-चैनपुर-उरैभन्ज्याङ्ग सडक योजना, बि.पी. नगर, डाेटी |
Rs. 93,26,769 |
0.00% |
|
|
Road Upgrading & Blacktop Works on Damauli Buldhi khola Shivalaya Vyas Marga Jodnay Sadak |
सडक डिभिजन, तनहुं |
Rs. 66,48,560 |
0.00% |
|
|
Kaligandaki Corridor, Maldhunga- Beni Road, Baglung Section. |
Road Division, Baglung |
Rs. 55,72,199 |
100.00% |
|
|
Bio Engineering works at Gwarko Lakuri Bhanjyang Road Lalitpur. |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 8,56,036 |
0.00% |
|
|
Construction of Prestressed RCC Bridge over Sapaha Khola (2 no*30 m span, total length 64.40 m) along Sakhuwa Hardi Malangwa Road, Sarlahi. |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, जनकपुर, धनुषा |
Rs. 5,17,17,140 |
0.00% |
|
|
Periodic Maintenece of Kupondle Hanumansthan chowk Guisingal Kalopul Sanepa Road |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 51,28,564 |
0.00% |
|
|
Upgrading / Widening of Bharatiyasima Sunaulidekhi Basantpurhudai Butwal Dhago Karkhana Road, Rupandehi |
सडक डिभिजन, वुटवल |
Rs. 7,68,16,844 |
0.00% |
|
|
Construction of Blacked top road and Pipe Culvert in Laxmimarg Dekhi Dakshin Dangihat Karsiya Hudai Aamahi(Bharat Sima)Sadak ,Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 9,61,56,936 |
92.86% |
|
|
Dhanewa River along Rampur Khadouna |
सडक डिभिजन, वुटवल |
Rs. 3,65,88,747 |
0.00% |
|
|
Road Upgrading work in Milanchowk-1 hudai Gidhaniya-Dhobiyare Sadak, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 1,04,02,767 |
96.00% |
|
|
Taulihwa Bazar along Taulihwa-Khunwa Road, Kapilvastu |
सडक डिभिजन, कपिलवस्तु |
Rs. 58,00,326 |
100.00% |
|
|
Pavement & Sturctures Works on Access Road to Laxmi Cement Industry. |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 20,72,615 |
0.00% |
|
|
upgrading of kanepokhari rangeli road morang 2073/74/UR-18 |
हुलाकी राजमार्ग निर्देशनालय, काठमाण्डौ |
Rs. 62,20,81,132 |
100.00% |
|
|
Maintenance of Road by Construction of Roadway Structures, Humepipe Culverts and Earthworks in Bobang (Mongla), Baglung (CH 184+000) to Dhorpatan, Baglung (CH 197+000) section along Saljhandi-Sandikharka-Dhorpatan Road |
सालझण्डी सन्धिखर्क ढोरपाटन सडक योजना, अर्घाखांची |
Rs. 1,06,40,404 |
93.00% |
|
|
Structure Works On Dhapakhel Santaneswor Road Lalitpur |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 23,45,442 |
0.00% |
|
|
Recurrent Maintenance works along Belahiya - Butwal Road Rupandehi |
सडक डिभिजन, तनहुं |
Rs. 1,27,97,011 |
100.00% |
|
|
Road Upgrading Works, Aalebhanjyang-Baguwa Sector (Ch. 40+500 to 51+000Km) |
कान्ती लोकपथ सडक योजना, ललितपुर |
Rs. 18,36,92,784 |
100.00% |
|
|
Road extension works at Sita Pakha-Hattiwan,Lalitpur |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 2,19,95,753 |
0.00% |
|
|
Improvement of Road by Construction of Roadway Structures, Cross Drain Structure and Earthworks at (Ghorakhori-Nuwakot) and (Bhedirakhne-Khanadaha) section of Bhalubang-Nuwakot-Khanadaha-Kharbang Road NH71 |
मध्यमाञ्चल क्षेत्रिय सडक निर्देशनालय, काठमाण्डौ |
Rs. 1,10,77,204 |
100.00% |
|
|
Upgrading of Nagra (Indian Border) -Devisthan –Mahakali Bridge Road (Km 0+000- Km 4+000), Kanchanpur |
सडक डिभिजन, कञ्चनपुर |
Rs. 3,11,12,990 |
100.00% |
|
|
Haleshi Diktel Road Section 3 |
आयोजना निर्देशनालय, ए.डि.वि., विशालनगर, काठमाण्डौ |
Rs. 13,69,96,440 |
100.00% |
|
|
Construction of Blacktop Road on Damak Highway Setumari Road, Damak |
डिभिजन सडक कार्यालय, झापा |
Rs. 3,34,41,417 |
100.00% |
|
|
Construction of Blacktop works & Cross drainage works at Damak Chiyadokan Jadaha Baalubathaan Gauradaha Sadak |
डिभिजन सडक कार्यालय, झापा |
Rs. 2,99,40,777 |
0.00% |
|
|
Road Upgrading Works on Araniko Rajmarga dekhi Pandubazar Height Ganeshman Singh bato hudai Gundu ra Dadhikot jane sadak |
सडक डिभिजन, भक्तपुर |
Rs. 1,08,84,290 |
100.00% |
|
|
Construction of Cast in Situ 2 Webbed PSC Bridge over Lohandra Khola, Lohandra Ghat, Morang |
डिभिजन सडक कार्यालय, मोरङ |
Rs. 8,29,00,668 |
85.73% |
|
|
Reactive Maintenance Works on Khairenitar Bhimad Kawaswati NH-45, Bhimad Rampur Road NH-68 |
सडक डिभिजन, तनहुं |
Rs. 36,37,857 |
100.00% |
|
|
Road widening &upgrading works at Madhu Chok- Byarek -Tindhara, Madhyapur Thimi 2 & 7 |
सडक डिभिजन, भक्तपुर |
Rs. 61,18,152 |
100.00% |