All Projects
Project |
Office |
Budget |
Progress |
Action |
---|---|---|---|---|
Road Protection work along Karnali HIghway Ch 133+100, 133+300, 140+450, 140+600,141+100,143+400,144+000,144+350,155+900,156+200,158,300,159+200,160+900,161+100 kalikot |
सडक डिभिजन, कपिलवस्तु |
Rs. 4,80,58,849 |
27.84% |
|
Badigaad Khola Pul , Sisne Huga |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 5,40,41,003 |
0.00% |
|
Road Upgrading Works on Panchkhal palanchowk Bhagawati Road (F071) Kavre |
सडक डिभिजन, भक्तपुर |
Rs. 45,28,853 |
0.00% |
|
Road widening and upgrading works on Byasi Chowk-Kaldhara-Jhaukhel-Mandev Road |
सडक डिभिजन, भक्तपुर |
Rs. 7,46,54,705 |
0.00% |
|
Assembling and disassembling of beli bridge over sunkoshi river at Foksintar (52+500) |
गाईघाट दिक्तेल सडक योजना, उदयपुर |
Rs. 80,68,727 |
100.00% |
|
Specific Maintenance Work on MRM (Banke Dhansar) Road |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 2,21,27,088 |
101.00% |
|
Asphalt Concrete overlay at Pipalbhanjynag-Khaniyakharka of Dhulikhel-Sindhuli-Bardibas Road |
सूर्यविनायक-धुलिखेल, धुलिखेल-सिन्धुली-बर्दिवास सडक आयोजना, काठमाण्डौ |
Rs. 6,58,28,986 |
0.00% |
|
Construction of Drain and Asphalt Concrete for service road work along Kalanki-Balkhu |
काठमाडौं चक्रपथ सुधार योजना, ललितपुर |
Rs. 1,77,57,762 |
0.00% |
|
Construction of Side drain works in Banepa- Panauti Road |
सडक डिभिजन, भक्तपुर |
Rs. 1,62,39,420 |
0.00% |
|
Construction of RCC Bridge over Dharkatuwa River, Fuleni Parifanta, Jhalari Pipaladi Na. Pa.-08, Kanchanpur |
सडक डिभिजन, कञ्चनपुर |
Rs. 4,55,27,127 |
100.30% |
|
Widening and Ugrading of ARM (28 Kilo)- KU Gate Road. |
सडक डिभिजन, भक्तपुर |
Rs. 3,31,14,759 |
0.00% |
|
Construction of Pre-stressed Concrete Bridge Over Devniya khola connecting Bhadra-13 and 15 jhapa |
डिभिजन सडक कार्यालय, झापा |
Rs. 7,26,50,293 |
0.00% |
|
Construction of Blacktop works & Cross drainage works at Kohavara Gwaaldubba Mahavara Sadak |
डिभिजन सडक कार्यालय, झापा |
Rs. 2,63,53,415 |
0.00% |
|
Maintenance and Protection of Bridges and Cross Drainage Structures at KRM (Bhedetar-Dhankuta-Hile-Chitre-GuraseSection) |
डिभिजन सडक कार्यालय, धनकुटा |
Rs. 60,83,615 |
0.00% |
|
Constructin of overhead Pedestrain Bridge(Saint Marys Sundharighat Road Saint Marys High School Lalitpur |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 25,06,506 |
0.00% |
|
Lohani & Brothers Lohani & sons Chitwan |
उत्तर दक्षिण (कालिगण्डकी करिडोर) लोकमार्ग योजना, पाल्पा |
Rs. 3,38,82,098 |
98.28% |
|
Road Upgrading works of Pokhara -Pame -Ramja -Lungkhu Tribeni Ridi Sadak |
डिभिजन सडक कार्यालय, मकवानपुर |
Rs. 1,06,98,992 |
100.00% |
|
Construction of Pre-stressed Concrete Bridge (1*40m) over Kanchan Khola, Gajedi-03, Danachaur, Rupandehi |
यान्त्रिक कार्यालय, झापा |
Rs. 7,07,09,277 |
100.00% |
|
Construction of RCC Bridge at Phakare (49+000) |
उत्तर दक्षिण, कोशी सडक योजना, संखुवासभा |
Rs. 4,53,69,570 |
0.00% |
|
Construction of RCC Bridges along Chhinchu-Jajarkot Road Over Bungad Khola,Khahare Khola,Jiya Khola,Bali Khola,Kali Khola,and Chaure Khola,surkhet:Co.No:RSDPAFII-DOR-W-BNC-NCB-4 |
सडक डिभिजन, सुर्खेत |
Rs. 26,60,68,217 |
97.50% |
|
Roadway excavation works on Taratal-Lakchelagna Sadak (Byauli-Bhotegadi-Kalikot simana) |
सडक डिभिजन, सुर्खेत |
Rs. 39,77,000 |
100.27% |
|
Upgrading of Kothi-Taulihawa-Bahadurgunj Road(Ch: 32+000 to 50+500), Kapilvastu |
हुलाकी राजमार्ग योजना कार्यालय, कपिलवस्तु |
Rs. 69,42,91,223 |
99.04% |
|
Road Upgrading works on Kothiyaghat-Khairi Chandanpur-Lalpur-Naurnaga-Manau Road, Bardiya |
सडक डिभिजन, वांके |
Rs. 12,61,60,518 |
0.00% |
|
Panaha Khola Pul along Nadi Hadhade Rajsthal Dhurkot Road |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 5,06,43,612 |
0.00% |
|
Road Upgrading & Widening Works on ARM Pandubazar Pandobazar Height Ganeshman singh Batika Gundu buspark Pipaldanda Dadhikot Road |
सडक डिभिजन, भक्तपुर |
Rs. 2,51,51,202 |
0.00% |
|
Puspalal(Midhill), Jorsal-Tamor-Sakranti sector |
Puspalal (Midhill) Road Project, Panchthar |
Rs. 24,84,34,550 |
0.00% |
|
Construction and Improvement of Gulmi Madane 6 Nuwar Jhulke to Pyuthan Jungedunga Road, Gulmi |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 36,38,430 |
0.00% |
|
Sylaa Kholama Jholunge Pul ko najikai Pul Hatichaur -7 Gulmi |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 5,86,43,509 |
0.00% |
|
Assembling and disassembling of Belly Bridge Over Sunkoshi River at Foxingtar |
गाईघाट दिक्तेल सडक योजना, उदयपुर |
Rs. 53,92,934 |
100.00% |
|
Road Widening and Upgrading Works on Thimi Gamcha Targhaal Mahadev Sthan Kalika Dada Ranikot Sadak, Bhaktapur |
सडक डिभिजन, भक्तपुर |
Rs. 61,44,318 |
0.00% |
|
Construction of Road Works on Narayani Corridor Road, Chitwan |
डिभिजन सडक कार्यालय, चितवन |
Rs. 56,37,228 |
0.00% |
|
Hulake Naya Pokhra Musikot Kurgha Road, Gulmi |
तम्घास सिमल्टारी प्युठान सडक आयोजना, गुल्मी |
Rs. 55,06,893 |
0.00% |
|
Earthwork Excavation,Structural Works and Pavement Works on Bartung-Ridi-Tamghas Road |
हेभिईक्युपमेन्ट डिभिजन, काठमाण्डौ |
Rs. 2,88,87,831 |
100.00% |
|
Road upgrading works on Khopasi Balthali Kamidanda Road , Kavre |
सडक डिभिजन, भक्तपुर |
Rs. 47,93,601 |
0.00% |
|
Construction of Rigid (RCC) Pavement Works (RCC and Structure on Thandi Bhanjyang) |
डिभिजन सडक कार्यालय, चौरजहारी |
Rs. 86,98,493 |
99.00% |
|
Roadway Construction works at Nepal Tol-Gairi Gaun-Babiyo Dada, Sindhupalchowk |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 58,91,904 |
11.00% |
|
Road improvement works of madku-dandagaun-dovane-katunje-damahadhunga Road, Dhading |
सडक डिभिजन, कञ्चनपुर |
Rs. 30,81,068 |
100.00% |
|
Rehabilitation of Loktantric Sahid Park Road |
डिभिजन सडक कार्यालय, काठमाण्डौ |
Rs. 31,59,797 |
0.00% |
|
Road Construction Woks along Birgunj 31 ko yashlampur dekhi Janata sadak sama ko sadak , Parsa |
योजना तथा अनुगमन महाशाखा (सडक सुरक्षा तथा ट्राफिक शाखा) |
Rs. 56,90,240 |
100.00% |
|
Jingarwa Tejapakad Vediyahi Narkatiya Sadak, Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 23,05,586 |
0.00% |