All Projects
Project |
Office |
Budget |
Progress |
Action |
|---|---|---|---|---|
|
Recurrent Maintainance at KRM(Dhankuta-Hile-Basantpur Section) |
सडक विभाग, काठमाण्डौ |
Rs. 43,05,995 |
100.00% |
|
|
Road widening &upgrading works SankhuNamobuddhaDapachaKakre Road Kavre |
सडक डिभिजन, भक्तपुर |
Rs. 9,76,560 |
100.00% |
|
|
construction of kamal khola bridge(pre-stressed) Dharampur topgachhi,jhapa |
डिभिजन सडक कार्यालय, झापा |
Rs. 14,35,23,685 |
100.00% |
|
|
Landslide Protection Works on Mahendra Rajmarg. Dhan khola Section (Ch 659+000 to 675+000), Kapilvastu |
सडक डिभिजन, कपिलवस्तु |
Rs. 61,55,597 |
0.00% |
|
|
आशिष योगेश्वर रुची जे.भी. |
उत्तर दक्षिण (कालिगण्डकी करिडोर) लोकमार्ग योजना, पाल्पा |
Rs. 2,62,05,469 |
100.00% |
|
|
Recurrent Maintenance Works of Manthali-Khurkot Road Section of Tamakoshi-Milti-Manthali-Khurkot Road, Ramechhap |
डिभिजन सडक कार्यालय, खुर्कोट |
Rs. 18,84,245 |
100.00% |
|
|
Road Upgrading works of Paudikhola to Bimalnagar section along Bimal nagar ,Mahuwatar, Thati pokhari, Dhud pokhari jane sadak,Gorkha |
गाेरखा सडक योजना, गोरखा |
Rs. 1,97,84,200 |
0.00% |
|
|
Specific Maintenance (Major Patch Works and Drain Works) at Specified Chainage on Sanfe-Mangalsen-Martadi Road Section |
डिभिजन सडक कार्यालय, साँफेवगर, अछाम |
Rs. 42,39,134 |
0.00% |
|
|
Gabion Works at Gaur Chandranigahpur Sadak, Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 13,58,960 |
100.00% |
|
|
Potholes Maintenance Works with loose gravel on earthen road along Bheri Corridor-Rimna to Tallubagar, (Ch:32+000 to 36+000) |
डिभिजन सडक कार्यालय, चौरजहारी |
Rs. 5,67,380 |
0.00% |
|
|
Road Construction works at Araniko rajmarga- Thulo Pakhar- Lakul- Lisankhupakhar road, Sindhupalchowk |
सडक डिभिजन, भक्तपुर |
Rs. 36,44,428 |
50.00% |
|
|
Upgrading of road with roadway excavation including Back cutting and grade cutting and Structural works in Bijayapur bhir,Pipalchauri |
दार्चुला टिङकर सडक योजना, दार्चुला |
Rs. 84,83,696 |
0.00% |
|
|
Roadway Upgrading Works on Kalesti Gajude Pokharichhap Hudhai Chandrawoti Sadak (Ch: 8+100 to 10+000 ) |
सडक डिभिजन, तनहुं |
Rs. 1,61,33,018 |
100.00% |
|
|
Rigid Pavement works along Sohari Najikko Hulaki Sadak dekhi sohari Suhpur hudai Dakshin Maturwaha Dharmapur Jhakhara Hudai Gandak Nahar Samma Road , Parsa. |
सुदुरपच्चिमाञ्चल क्षेत्रिय सडक निर्देशनालय, डोटी |
Rs. 58,34,685 |
100.00% |
|
|
Road Upgrading Works along Vurung Khola - Kumakha Gaa.Pa. Neta-Jharkanada - Baalayabasnet Jinulaa Sadak in Salyan District. |
डिभिजन सडक कार्यालय, सिराहा |
Rs. 36,40,595 |
100.00% |
|
|
Maintenance of Road by Construction of Roadway Structures, Humepipe Culverts, Slab Culverts and Earthworks in Bhuithan Danda-Harpe, Baglung (CH 158+500) to Devisthan, Baglung (Ch 164+000) section along Saljhandi-Sandikharka-Dhorpatan Road |
सालझण्डी सन्धिखर्क ढोरपाटन सडक योजना, अर्घाखांची |
Rs. 1,14,22,404 |
96.00% |
|
|
Purba Paschim Rajmagrako Chandranigahpur Chowk dekhi Gaidatar hudai Dharan Chatara Sadakko Dhiyal Makawanpur Sadak, Rautahat |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 41,50,120 |
0.00% |
|
|
Road Infrastructure development programe along Nakhkhu bridge to Nakhkhudol- waiwai Road(Pacakage 3) |
डिभिजन सडक कार्यालय, ललितपुर |
Rs. 1,10,51,660 |
94.00% |
|
|
Protection Works at Fuljor Ishwarpur Babarganj Mohanpur Bramhapuri Bhelhi Tribhuwannagar & Sakhuawa dekhi Padariya Sadak, Sarlahi. |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 12,74,416 |
0.00% |
|
|
Armanneta-Kimchaur Hudai Tarakhola Baglung Road, Myagdi |
Road Division, Baglung |
Rs. 49,63,847 |
100.00% |
|
|
Construction of Jogmai Khola Briddge |
डिभिजन सडक कार्यालय, ईलाम |
Rs. 2,36,63,509 |
0.00% |
|
|
Road Widening and upgrading works on Panchkhal palanchowk Bhagawati Road, Kavre |
सडक डिभिजन, भक्तपुर |
Rs. 14,35,297 |
0.00% |
|
|
Road Upgrading Works on Sukrabare Sudap Jodisalla Dangapa Basantpur Road Dhankuta |
डिभिजन सडक कार्यालय, धनकुटा |
Rs. 1,31,03,000 |
0.00% |
|
|
Road Upgrading Works on Madi Corridor ( Makunne Khola- Sisaghat Section), Tanahun |
सडक डिभिजन, तनहुं |
Rs. 1,02,34,595 |
100.00% |
|
|
Recovery of washout Bailey Bridge Budhignaga river at Jadanga, Bajura |
डिभिजन सडक कार्यालय, साँफेवगर, अछाम |
Rs. 15,53,800 |
0.00% |
|
|
Road Improvement works on Ramche Shyafrubesi Section of Balaju-Trisuli- Dhunche-Shyaphru Road ,Rasuwa (NH18) |
डिभिजन सडक कार्यालय, नुवाकोट |
Rs. 2,85,47,112 |
0.00% |
|
|
Traffic Safety works on Chaukhutte-Sanfe-Mangalsen-Martadi Road Section |
डिभिजन सडक कार्यालय, साँफेवगर, अछाम |
Rs. 1,06,82,380 |
97.33% |
|
|
Construction of Earthwork , gravel works & Hume pipe Culvert at Lalgadh Model hospital- Bishal Nagar sadak, Dhanusha. |
डिभिजन सडक कार्यालय, धनुषा |
Rs. 30,03,937 |
0.00% |
|
|
Recurrent Maintenance works on Mahendra Rajmarga (Lothar -Narayanghat section Ch 436+000 to 472+000 , Tandi Sauraha (0+000 to 7+000) |
डिभिजन सडक कार्यालय, चितवन |
Rs. 40,17,476 |
0.00% |
|
|
Specific Maintenance at Dhulikhel-Nepalthok Road Section of Dhulikhel-Sindhuli Bardibas Road |
सूर्यविनायक-धुलिखेल, धुलिखेल-सिन्धुली-बर्दिवास सडक आयोजना, काठमाण्डौ |
Rs. 88,15,430 |
0.00% |
|
|
Road Upgrading & Blacktop Works on Damauli Chhabdi Motor marga - Byaas Na.Pa Bandipur Ga.Pa Road, Tanahun |
सडक डिभिजन, तनहुं |
Rs. 1,20,61,880 |
0.00% |
|
|
RAYAL -UTKADI THING PADESH ROAD ,BAJHANG |
सेती राजमार्ग (उत्तर खण्ड) चैनपुर ताक्लाकोट सडक योजना, बझाङ्ग |
Rs. 1,33,13,958 |
0.22% |
|
|
Construction of Roadway Structure and Blacktop works along Manthali-Sunarpaani-Sallu-Sangutar Road, Ramechhap |
सडक डिभिजन, पोखरा |
Rs. 30,77,699 |
100.00% |
|
|
Upgrading of Nepalgunj Baghauda Road,Banke(CH 0+000-22+000) |
हुलाकी राजमार्ग आयोजना, योजना कार्यालय, वाके |
Rs. 30,68,08,021 |
0.00% |
|
|
Bridge Maintenance Works on Different Bridges of Bhaktapur and Kavre |
सडक डिभिजन, भक्तपुर |
Rs. 42,60,952 |
0.00% |
|
|
Road Upgrading Works along Khopasi-Balthali-Kamidada Road, Kavre |
सडक डिभिजन, भक्तपुर |
Rs. 61,01,466 |
100.00% |
|
|
Araniko Highway Dolalghat Barabise Sector Sindhupalchok, Specific Maintenance works |
डिभिजन सडक कार्यालय, दोलखा |
Rs. 64,56,568 |
0.00% |
|
|
Construction of Blacktop, Humepipe Structure along MRM-Bengadabar (Shiv Mandir) Sarbajanik Pokhari hundai Sa.U.Ma.Bi.Mahottari sima Chaulikha Bazar |
मध्यमाञ्चल क्षेत्रिय सडक निर्देशनालय, काठमाण्डौ |
Rs. 1,40,86,931 |
98.00% |
|
|
Sudama Khairwa Chhotaul Sisaut Sadak, Sarlahi (Balara Bajar dekhi Bhagwanpur Sadak) |
डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर |
Rs. 43,33,850 |
0.00% |
|
|
Roadway Excavation, Structural,Cross Drainage Works and Pavement works on Belbas-Nuwakot-Dovan Road , Palpa |
सडक डिभिजन, पाल्पा |
Rs. 54,24,259 |
0.00% |