All Projects

Project
Office
Budget
Progress
Action
Default Image

Deassembling Transportation assembling and erection Bailey Bridge Parts and Approach Road Works at Takulaa Khola Ch 181+900 on Karnali Highway Kalikot

हेभिईक्युपमेन्ट डिभिजन, मकवानपुर

Rs. 86,86,244

21.65%

Default Image

Construction of Chattang Khola Bridge

योजना तथा अनुगमन महाशाखा (योजना अनुगमन तथा मुल्यांकन शाखा)

Rs. 6,57,31,455

75.00%

Default Image

Road Upgrading Works along Bangalachuli 01 Tusarpani-Jaruwa Road in Dang District.

डिभिजन सडक कार्यालय, धनकुटा

Rs. 34,73,440

65.00%

Default Image

Periodic Maintenance works at Mid Hill Highway NH 03 (Seti Highway)

डिभिजन सडक कार्यालय, ललितपुर

Rs. 3,32,86,547

65.00%

Default Image

construction of namdok bridge ( RCC, 1X25)

कालिगण्डकी कोरिडोर (बेनी जोमसोम कोरोला सडक योजना), जोमसोम​, मुस्ताङ

Rs. 5,63,78,888

70.00%

Default Image

Construction of Blacktopped Works including structures on Dhulabari(Radhaswami) Bhawanachowk Myagneltar Road Section, Jhapa

डिभिजन सडक कार्यालय, ललितपुर

Rs. 13,47,17,749

64.00%

Default Image

Araniko Highway (Dolalghat-Lamosanghu Sector)

डिभिजन सडक कार्यालय, दोलखा

Rs. 10,18,70,775

0.00%

Default Image

Construction of Hanumante River Bridge ,Along madhayapur Thimi ward no.16 connecting Hanuman Mandir and Imadole

डिभिजन सडक कार्यालय, ललितपुर

Rs. 4,80,20,099

64.20%

Default Image

Specific Maintenane works along TRP and PRM

डिभिजन सडक कार्यालय, चितवन

Rs. 61,80,967

0.00%

Default Image

Construction of RCC Bridge along Surkhet,RSDPAFII-DOR-W-BNC-NCB-2-Jumla Road Over Kuwa Khola,Kale Khola,Paltada Khola,Kanegaad,Guhegaad & Dahi Khola

सडक डिभिजन, सुर्खेत

Rs. 17,04,45,030

64.13%

Default Image

Specific Maintenance Works on Dumre Besisahar Road (Ch 35+600 to 43+430)

सडक डिभिजन, तनहुं

Rs. 39,25,507

0.00%

Default Image

Construction of earthwork,gravelling & structure works along Nathpatti-Mangharaha-Machi-Khajuni-Balhagoth-Bharat Border sadak, Dhanusha

डिभिजन सडक कार्यालय, धनुषा

Rs. 18,61,032

0.00%

Default Image

Construction of RCC Pavement, Retaining structures and Slab culvert.in Manang District.

सडक डिभिजन, तनहुं

Rs. 83,54,687

0.00%

Default Image

Road Safety works in Anarkholi-Khodpe Patan-satbanjh-Jhulaghat Section of Midhill Highway(NH-03) and Khodpe Chainpur Highway (NH-64),

सडक डिभिजन, बैतडी

Rs. 37,65,000

0.00%

Default Image

Construction of rcc bridge over ghatte khola, Dailekh

डिभिजन सडक कार्यालय, जुम्ला

Rs. 3,99,28,338

0.00%

Default Image

Kusma-Durlung Sadak,Parbat .

Road Division, Baglung

Rs. 68,36,567

65.00%

Default Image

Construction of RCC Bridge (2*40m) at Chhepe khola along Rainaass Na Pa-04 Lamjung and Palungtar Na Pa -03 Gorkha

गाेरखा सडक योजना, गोरखा

Rs. 7,57,47,495

24.00%

Default Image

Upgrading of roads (E/W highway) including construction of blacktop roads, retaining walls, causeway etc. Dhalkebar Roundabout, Ch 257+075 to 257+300, Dhanusha.

डिभिजन सडक कार्यालय, धनुषा

Rs. 75,05,353

0.00%

Default Image

Traffic Safety and Thermoplastic paint for Road Marking

डिभिजन सडक कार्यालय, तुम्लीङटार, संखुवासभा

Rs. 42,47,500

0.00%

Default Image

Construction of RCC Bridge over Gangol River along Auraha Santhi road

डिभिजन सडक कार्यालय, मकवानपुर

Rs. 2,96,08,106

0.00%

Default Image

Roadway Excavation, Gabion and Stone Soling Work Along Heluwabeshi- Bumlingtar- Budhabare Road Section of Leguwa Tumlingtar Heluwabeshi Bumlingtar Budhabare Solu road Package II (Chainage: 0+700 to 2+240)

डिभिजन सडक कार्यालय, तुम्लीङटार, संखुवासभा

Rs. 59,64,974

0.00%

Default Image

Road Works along Manang Mustang Dolpa Jumla Road (CH 3+000 Dansanghu to CH 6+500 Jhaarjwala)

सडक डिभिजन, पाल्पा

Rs. 8,45,91,981

24.96%

Default Image

Road Maintenance in Kalangagad-Chainpur Section of Khodpe Chainpur Highway (NH64)

सडक डिभिजन, बैतडी

Rs. 1,07,43,902

0.00%

Default Image

Hanumante Khola dekhi ARM Bappa pati bihar bahakha bazar purano bato samma bistar karya

सडक डिभिजन, भक्तपुर

Rs. 4,12,30,832

0.00%

Default Image

Construction of RCC Bridge over Geuriya Khola in Postal Road Gaurigunj, Jhapa

डिभिजन सडक कार्यालय, झापा

Rs. 1,48,92,117

100.00%

Default Image

Construction of Drain and Black top Works along Kanchankawal-1 Wada Karyalaya Rajgadh bazar,Srijana Chowk uttar Budhabare, Jhapa

सडक डिभिजन, तनहुं

Rs. 13,16,83,102

64.00%

Default Image

Road Construction along Laxminiya Ga.Pa. Dohar tole dekhi Laxminiya bazar hudai Bagewa Thera Bazar Katrait Samma sadak, Dhanusha

डिभिजन सडक कार्यालय, धनुषा

Rs. 47,30,040

0.00%

Default Image

Cutting of tree,Stacking serviceable point ,Ghat gaddi and Chatta nirman

गाईघाट दिक्तेल सडक योजना, उदयपुर

Rs. 9,72,580

63.53%

Default Image

Road construction and Improvement works at Jomsom-Jhaite(Ch. 29+000-40+000)

कालिगण्डकी कोरिडोर (बेनी जोमसोम कोरोला सडक योजना), जोमसोम​, मुस्ताङ

Rs. 47,62,22,226

0.00%

Default Image

Construction of drain and asphalt concreate for service road

काठमाडौं चक्रपथ सुधार योजना, ललितपुर

Rs. 2,63,49,363

0.00%

Default Image

Surface Dressing Works on Mechi Highway (CHarali-Chhihandanda Section) & Damak-Beldangi Road

डिभिजन सडक कार्यालय, झापा

Rs. 2,31,82,987

0.00%

Default Image

Construction of Kaale Khola Bridge Approach Road (Protection Work) in Karnali Highway Road, (Dahikhola-Sherighat Section), Kalikot (RDJML/33701132/077/78-18)

डिभिजन सडक कार्यालय, जुम्ला

Rs. 27,03,026

0.00%

Default Image

Agaleswa -CTEVT-North Rameshpur Kumhraul sadak, Dhanusha

डिभिजन सडक कार्यालय, धनुषा

Rs. 54,14,958

0.00%

Default Image

Construction and Upgrading of Rani-Biratnagar-Itahari-Dharan Road to six lane standards (Ch: km 14+200 to 17+200)

व्यापारिक मार्ग विस्तार आयोजना (रानी-बिराटनगर-इटहरी-धरान मार्ग), सुनसरी

Rs. 35,44,32,242

0.00%

Default Image

Roadway Excavation, Structural and Cross Drainage Works on Phoksingkot-Tahu Section of Aserdi - Tahun - Jhadewa - Khareni Road, Palpa

सडक डिभिजन, पाल्पा

Rs. 1,24,69,699

0.00%

Default Image

श्री हिमजुङ ब्रदर्श कन्स्ट्रक्सन एण्ड सप्लायरर्स प्रा.लि.

सडक डिभिजन, वांके

Rs. 29,78,850

63.32%

Default Image

Road Upgrading Works on Damauli Chhabdi Motormarga, Byas Na. Pa. Bandipur Ga.Pa. Sadak, Tanahun

सडक डिभिजन, तनहुं

Rs. 1,15,67,005

0.00%

Default Image

Hariharpur Katani Maira Sadak, Rautahat

डिभिजन सडक कार्यालय, चन्द्रनिगाहापुर, गौर

Rs. 45,22,408

0.00%

Default Image

Upgrading of Road to Blacktop Standard with Roadway Excavation,Structural and Drainage Works in Masinjala -Karali-Sadhani-Kuna Section of Mahakali Corridor [CH:26+350- CH 28+000], Mitra Builders

योजना तथा अनुगमन महाशाखा (योजना अनुगमन तथा मुल्यांकन शाखा)

Rs. 7,18,14,489

63.67%

Default Image

Upgrading/Improvement of Mechidangi-Patapur Section to Blacktop Standard [CH. 125+000 to 126+800]

Unknown

Rs. 10,80,35,212

80.00%